HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Third-party evaluation of pipe racks

2022-04-27View Original

Thread Content

I have a question for the teachers: We want to lay a medium-pressure steam line on the support structure of an existing utility tunnel, and the design firm has requested a third-party evaluation report of that existing tunnel. I would like to ask the teachers: What contents are included in third-party evaluation reports? Can’t the design unit conduct the evaluation on its own?
Reply #22022-04-28
Evaluate the compliance and legality of the pipe tunnel; otherwise, the design institute cannot design pipelines for this industrial park pipe tunnel.
Reply #32022-04-28
Could we also ask the design firm responsible for installing the pipes in this conduit to conduct an evaluation?
Reply #42022-04-29
Yes, the design institute must have the relevant evaluation qualifications.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.