HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Ten Years of Rapid Development in Chemical Equipment】The CNBG Baogang Liquefied Hydrocarbon Storage Facility project set new records for the construction of double-walled low-temperature tanks between 2069 and 2024

2024-12-12View Original

Thread Content

Give praise and encouragement to the achievements made in China’s chemical engineering technology and equipment; your participation in discussions is the greatest encouragement. **********************【Ten Years of Progress in Chemical Engineering Equipment】Regular updates and summaries are available – feel free to join the discussions: https://bbs.hcbbs.com/thread-3576046-1-1.html (Source: Haichuan Chemical Engineering Forum) ***************** The CNPG Bao Gang liquefied hydrocarbon storage facility project set a new record for the construction of low-temperature tanks using double-layer steel. On December 10th, the hydraulic testing phase for the 60,000 cubic meter butane storage tank in this project was successfully completed. It is reported that the civil construction of this storage tank was completed on June 22 this year. The project team overcame various adverse conditions such as hot weather, strong winds near the sea, heavy rainfall, and low-temperature cold snaps, and managed to finish tasks including the installation of the outer tank, the pneumatic lifting of the inner tank, and its installation within 5.5 months, setting the fastest construction record for similar double-steel low-temperature tank projects in China. In construction projects, hydrostatic testing is one of the key tests for evaluating the performance of low-temperature storage tanks. It is also an important procedure for checking whether the welds of the internal tank are sound and whether the load-bearing capacity of the tank’s foundation meets the required standards. The hydrostatic test for the butane tank is scheduled to be completed within 30 days. The water filling height will be around 30 meters, with a water consumption of nearly 60,000 cubic meters. During the hydrostatic test, tasks such as water filling and drainage, tank cleaning, settlement monitoring, and inclination monitoring need to be carried out.
Reply #22024-12-12
【Ten Years of Great Development in Chemical Equipment】2068-2024 – Like it! Modular installation of 7 cracking furnaces for the second phase of Tarim’s 1.2 million tons/year ethylene plant https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5675300 (Source: Haichuan Chemical Industry Forum [Haichuan Network])
Reply #32024-12-13
Thank you for sharing the information; kudos to the significant progress in chemical processing equipment

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.