During the design, installation, and inspection of pipelines, various minor issues that have been overlooked or not taken into consideration are often identified. These issues are compiled into a series; the list is being updated continuously. Everyone is welcome to actively participate in discussions. This is a compilation post on common problems in Hailuan pipeline design – it’s still being updated, and discussions are welcome: https://bbs.hcbbs.com/thread-5705828-1-1.html ------------------------------------------------------------------
【Haichuan Chemical Plant Accident Case】15 Dead, 180 Injured! Warning from the BP Texas refinery accident: “Budget cuts” can trigger serious cascading risks” https://bbs.hcbbs.com/thread-5706578-1-1.html (Source: HCBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2850 to 2025: HBIS Group launches domestically the first 1700mm ultra-wide-section high-grade petroleum pipeline steel products https://bbs.hcbbs.com/thread-5706292-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】The period from 2025 to 2035 opens up new pathways for the green and low-carbon development of the steel industry. China’s first project for 100% conversion of coke oven gas has been implemented in Lingyuan, Liaoning https://bbs.hcbbs.com/thread-5706563-1-1.html (Source: HCBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】World’s First High-Pressure Underground Hydrogen Storage Well and Refueling Station Built in Chongqing 2851-2025 https://bbs.hcbbs.com/thread-5706583-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2854-2025: SHENGU’s self-developed 15MPa high-pressure, 30,000 standard cubic meters per day low-flow expansion generator sets contribute to China’s first project for generating electricity from the residual pressure in high-pressure natural gas transmission pipelines. https://bbs.hcbbs.com/thread-5706687-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2854-2025: SHENGU’s self-developed 15MPa high-pressure, 30,000 standard cubic meters per day low-flow expansion generator sets contribute to China’s first project for generating electricity from the residual pressure in high-pressure natural gas transmission pipelines. https://bbs.hcbbs.com/thread-5706687-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 660-megawatt ultra-supercritical circulating fluidized bed boiler was approved for use, 2856–2025 https://bbs.hcbbs.com/thread-5706795-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
【HaiChuan Chemical Construction Technology】The ultimate solution to extend the lifespan of instrument pipelines in winter – starting with electric heat tracing https://bbs.hcbbs.com/thread-5706825-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Chemical Construction Technology】The ultimate solution to extend the lifespan of instrument pipelines in winter – starting with electric heat tracing https://bbs.hcbbs.com/thread-5706825-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))