Bid invitation for Section 1 of the foundation engineering design for 7 units including ethylene in the 1 million tons/year ethylene refining and chemical integration project in the Yueyang area of Hunan Petrochemical

2025-08-06View Original

Thread Content

Tender for foundation engineering design of 1 million tons/year ethylene plant! 2025-08-05 On August 4, an auction notice was issued for Bid Section 1 of the foundation engineering design for 7 units including the ethylene plant, as part of the 1 million tons per year ethylene refining and chemical processing integrated project in the Yueyang area of Hunan Petrochemical. Project Overview and Scope of Bidding: Construction location: Hunan Yueyang Green Chemical High-tech Industrial Development Zone, Yunxi District, Yueyang City, Hunan Province. Bid section division: 1 bid section. Estimated contract value for this bid section: 160.28 million yuan (excluding tax). Scope of the bidding: Foundation engineering design and related technical services for 7 units including ethylene, as well as the supporting facilities, for the 1 million tons per year ethylene refining and chemical integration project in the Yueyang area of Hunan Petrochemical. (1) A total of 7 process units: an ethylene plant with a capacity of 1 million tons per year, a butadiene extraction plant with a capacity of 150,000 tons per year, a pyrolysis gasoline hydrogenation plant with a capacity of 500,000 tons per year, an aromatic extraction plant with a capacity of 300,000 tons per year, an aromatic to benzene conversion plant with a capacity of 300,000 tons per year, MTBE/butene-1 plants with capacities of 100,000/40,000 tons per year, and an LLDPE plant with a capacity of 400,000 tons per year ; (2) Supporting storage and transportation facilities in the Changling North New Area: 1 ethylene cryogenic tank bank, with each tank having a capacity of 3×104 m3 ; (3) Changling North New Area process system (maximum design pressure: 4.8 MpaG) and thermal pipeline network ; (4) Torch system ; (5) The plant’s power supply system and road lighting, as well as the plant’s electrical automation system, etc ; (6) Auxiliary facilities: central control room, plant-wide telecommunications system, plant-wide information system, waste heat recovery and refrigeration station, etc ; (7) Safety and environmental protection facilities: waste gas and liquid treatment systems, waste alkali oxidation facilities, etc. The Yueyang ethylene project has a total investment of 35.68 billion yuan, making it the largest industrial project in Hunan to date in terms of investment amount. It consists of two components: an ethylene production facility with an annual capacity of 1 million tons, and upgrades to the refining facilities. The main construction components of the ethylene project include: the construction of a new ethylene plant with an annual capacity of 1 million tons, along with 14 other chemical processing units downstream. Ten of these chemical processing units are to be built in the Changling New Area; they include the 1-million-ton-per-year ethylene plant, a 500,000-ton-per-year hydroprocessing unit for cracked gasoline, a 300,000-ton-per-year aromatic extraction unit, a 300,000-ton-per-year unit for producing benzene from aromatics, a 150,000-ton-per-year butadiene extraction unit, a 20,000-ton-per-year styrene extraction unit, a 300,000-ton-per-year EVA plant, a 400,000-ton-per-year high-density polyethylene (HDPE) plant, a 400,000-ton-per-year linear low-density polyethylene (LLDPE) plant, and 10/40,000-ton-per-year MTBE/butene-1 plants ; The remaining four units of the main project are being newly constructed in the old Baling area. These include a 150,000-ton/year C5 separation unit, a 300,000-ton/year propylene oxide (CHPPO) unit, a 220,000/130,000-ton/year phenol/** unit, and a 240,000-ton/year bisphenol A unit. These units complement the existing epoxy resin and synthetic rubber facilities at the original Baling Petrochemical Complex. Construct the necessary storage and transportation facilities, utility systems, and auxiliary installations. The main construction components of the refinery upgrading project include: the construction of a new hydrocracking complex with an annual capacity of 3 million tons, a sulfur recovery unit with an annual capacity of 60,000 tons, and a solvent deasphalting unit with an annual capacity of 1 million tons. Unit 2 of the atmospheric and vacuum distillation complex will be upgraded to an annual capacity of 10 million tons, while one 3.5-million-ton-per-year refining unit each at the original Changling Refining and the original Baling Petrochemical plants will be shut down. This project primarily utilizes green and low-carbon process technologies owned by Sinopec and considered industry-leading; the advantages in raw materials, technology, and products work together to complete the industrial chain in the Yueyang area, ranging from crude oil processing to modern specialty chemicals, thereby creating an industrial framework that includes \"clean petroleum products + modern chemicals + new materials\". Once the project is completed and put into operation, it will drive downstream investments of over 150 billion yuan, playing a significant role in promoting the development of the central region and the Yangtze River Economic Belt, as well as helping Hunan Province to become a core hub for a modern petrochemical industry worth trillions of yuan. Source: Petrochemical Forum
Reply #22025-08-06
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2587 to 2025! Zhejiang University develops elastic aerogel: remains unmelting at 2000°C https://bbs.hcbbs.com/thread-5698159-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-08-06
As expected, it was still the several engineering companies under SEG that divided up the project tasks.
Reply #42025-08-06
Development of hydrogen energy applications: Seeking answers from accidents and confidence through technology. https://bbs.hcbbs.com/thread-5698188-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-08-07
【History of Haichuan Chemical】Fushun Petroleum Plant No. 1: The Light of Energy in the Old Industrial Base of Northeast China https://bbs.hcbbs.com/thread-5698260-1-1.html (Source: Haichuan Chemical Forum)
Reply #62025-08-08
【Ten Years of Great Development in Chemical Equipment】2594-2025 The first in China! Yizheng Chemical Fiber Inspection Center introduces intelligent robotic arms into the key testing process for polyester chips. https://bbs.hcbbs.com/thread-5698323-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-08-08
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first hydrogen internal combustion engine vehicle was put into trial operation in Cang from 2595 to 2025. https://bbs.hcbbs.com/thread-5698347-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #82025-08-09
【Ten Years of Rapid Development in Chemical Equipment】Good News from 2596 to 2025! The first domestically produced 450,000-ton/year polypropylene compounding, extrusion, and granulation unit has successfully passed the factory acceptance test at Dalian Heavy Industry. https://bbs.hcbbs.com/thread-5698372-1-1.html (Source: Haichuan Chemical Forum)
Reply #92025-08-10
【Haichuan Teahouse】The noodles in Dazu, Chongqing are truly impressive and make one want to stay longer. https://bbs.hcbbs.com/thread-5698459-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-08-11
【Ten Years of Rapid Development in Chemical Equipment】Nanjing Guoxuan invested 12 billion yuan in a biomass gasification and steam project; the first ignition was successful. https://bbs.hcbbs.com/thread-5698512-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.