HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The list of the first 52 **-level zero-carbon parks for construction has been released

2025-12-26View Original

Thread Content

**The National Development and Reform Commission, the Ministry of Industry and Information Technology, and the **Energy Administration jointly released the list of the first batch of **-level zero-carbon industrial parks; 52 parks, including the Jilin Songyuan Petrochemical Industrial Circular Economy Park and the Heilongjiang Suihua Anda Economic Development Zone Fine Chemicals Industrial Park, were included on this list. The initial list of areas for development covers all 31 provinces (regions, municipalities) and the Xinjiang Production and Construction Corps, with at least one industrial park selected from each region. The construction scope of 6 parks is the entire area, while that of 42 parks is a garden within a garden. According to CCTV News, in terms of the expected outcomes, once the first batch of **-grade zero-carbon parks are completed, their output value is projected to reach 3.54 trillion yuan. A zero-carbon park is one in which, through planning, design, technology, management, and other means, carbon dioxide emissions resulting from production and daily activities within the park are reduced to a \"near-zero\" level, with the conditions in place to further achieve \"net zero\" emissions. The three departments require coordinated optimization of energy supply and consumption, improved alignment between energy sources and demand, planning of key tasks and infrastructure projects, reasonable setting of timelines for implementation, so as to generate tangible progress as soon as possible and meet the target requirements for **-level zero-carbon parks at the earliest opportunity. The three departments emphasized that relevant authorities should provide necessary support in terms of funding allocation, resource provision, technical assistance, and financial services, to promote green electricity supply models such as direct connection of green power sources and the integration of new energy sources into local distribution networks within zero-carbon parks at the ** level. They also encouraged and supported these parks to carry out innovation in technology, policies, and business models according to local conditions. It is reported that for parks that meet the criteria for **-level zero-carbon parks, the development and reform commissions of various regions will, in conjunction with the relevant local departments, organize acceptance evaluations. Once approved, the matter will be submitted to the ** Development and Reform Commission for final approval; parks that pass this approval process are officially recognized as **-level zero-carbon parks.
Reply #22025-12-26
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first industrial unit for aerospace pyrolysis, under the 2931-2025 project, was mechanically completed in the first phase of the solid and hazardous waste recycling project in Bayannur, Inner Mongolia. https://bbs.hcbbs.com/thread-5709594-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))
Reply #32025-12-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest single PEM hydrogen production electrolyzer was successfully produced at CRRC in Zhuzhou from 2021 to 2025. https://bbs.hcbbs.com/thread-5709309-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-12-27
【Haichuan Equipment Guessing Game】Does anyone know it? ? What kind of storage tank is this? Why does it have such a structure inside? https://bbs.hcbbs.com/thread-5709647-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #52025-12-28
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2027 to 2025, Yanshan Petrochemical’s 1.2 million tons per year gasoline adsorption desulfurization unit became the first of its kind in China to obtain carbon neutrality certification. https://bbs.hcbbs.com/thread-5709493-1-1.html (Source: Hachuan Chemical Industry Forum (HCHBBS))
Reply #62025-12-28
【Ten Years of Rapid Development in Chemical Equipment】First of its kind in China from 2928 to 2025! Pilot production of Ordos’ “sand thermal battery” a success! https://bbs.hcbbs.com/thread-5709536-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #72025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2030 to 2025, Shaanxi Gas Turbine Power joined forces with Ningxia Runxia to carry out China’s first project to convert nitric acid production units from steam-driven to electric-driven systems. https://bbs.hcbbs.com/thread-5709560-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】2931-2025: Dongfang Electric makes new breakthroughs in direct seawater electrolysis for hydrogen production, achieving 1000 hours of continuous operation https://bbs.hcbbs.com/thread-5709640-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.