Bid for EPC general contract of 100,000 tons/year biomass green methanol project (Phase I) in Lanzhou New Area

2026-01-09View Original

Thread Content

On January 7, a tender was issued for the EPC general contracting of Lanzhou New Area’s 100,000 tons per year biomass-based green methanol project (Phase I). Project overview: This is a project for producing green methanol through biomass gasification coupled with green hydrogen production; the main production facilities include units for converting biomass into syngas, systems for conversion and purification, compression units, methanol synthesis equipment, methanol distillation units, as well as a 200MW photovoltaic power generation system (photovoltaic generation and related infrastructure are not part of this tender). Hydrogen is produced via water electrolysis. Bidder: Lanzhou New Area Nengke Ecological Development Co., Ltd. (a state-owned enterprise). Total investment: 1,427,398,700 yuan. Timeline requirement: from March 2026 to September 2027, not exceeding 18 months (including the construction period during the winter and rainy seasons). Bid section division: Bid Section 1: The 100,000 tons per year biomass green methanol project in Lanzhou New Area (Phase I), which includes one set of biomass gasification units, as well as systems for conversion and purification, compression, methanol synthesis, and methanol distillation. It also encompasses utility and auxiliary facilities such as gas-fired boilers for power generation, biomass pellet production facilities, storage tanks for biomass raw materials, tank farms and loading/unloading systems, flares, the entire plant’s piping system, air separation units, and recirculating water stations. Bid Section 2: General contract for the design, procurement, and construction of a backup biomass gasification unit for the 100,000 tons per year biomass-based green methanol project (Phase I) in Lanzhou New Area.
Reply #22026-01-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】2960–2025: China’s largest single-scale project for zero discharge of high-salinity wastewater – The Phase I project for zero discharge treatment of high-salinity wastewater containing nickel, cobalt, and other heavy metals from Jinchuan https://bbs.hcbbs.com/thread-5710636-1-1.html (Source: HCBBS Chemical Forum)
Reply #32026-01-10
【Haichuan Equipment Guessing Game】Why don’t these bicycles have wheels? The people I know must be really amazing! https://bbs.hcbbs.com/thread-5710458-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #42026-01-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 600KW high-power magnetic levitation air compressor produced by Tianrui Heavy Industry was successfully manufactured between 2021 and 2025. https://bbs.hcbbs.com/thread-5710707-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52026-01-10
【Ten Years of Rapid Development in Chemical Equipment】2962-2025: Tianyuan Company’s first domestic laboratory facility for lignite carbonization in Shenmu’s coal chemical industry has been successfully put into operation. https://bbs.hcbbs.com/thread-5710802-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #62026-01-10
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and text; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #72026-01-11
【Ten Years of Rapid Development in Chemical Equipment】The bulk method ABS technology developed by Dalian University of Technology was successfully applied at Jilin Petrochemical Company from 2024 to 2026. https://bbs.hcbbs.com/thread-5710881-1-1.html (Source: Haichuan Chemical Industry Forum (Hcbbs))
Reply #82026-01-11
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #92026-01-12
【Ten Years of Rapid Development in Chemical Equipment】The bulk method ABS technology developed by Dalian University of Technology was successfully applied at Jilin Petrochemical Company from 2024 to 2026. https://bbs.hcbbs.com/thread-5710881-1-1.html (Source: Haichuan Chemical Industry Forum (Hcbbs))
Reply #102026-01-13
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial unit for high-pressure dry reforming with a capacity of 100 million cubic meters passed on-site evaluations from 2026 to 2966. https://bbs.hcbbs.com/thread-5710893-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #112026-01-14
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial unit for high-pressure dry reforming with a capacity of 100 million cubic meters passed on-site evaluations from 2026 to 2966. https://bbs.hcbbs.com/thread-5710893-1-1.html (Source: Haichuan Chemical Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.