Announcement of Candidates Shortlisted for the Second Round of EPC Tender for the 150t/h Dry Quenching Project of Yunnan Dawa Coking Co., Ltd

2026-03-16View Original

Thread Content

On March 13, the list of candidates shortlisted for the second round of bidding for the EPC (Engineering, Procurement, and Construction) of the dry quenching for energy conservation and environmental protection project (Phase I) of Yunnan Dawa Coking Co., Ltd. was made public. First winning bidder: Jigang Group International Engineering Technology Co., Ltd., bid price: 187.53 million yuan ; Second winning bidder: Saiding Engineering Co., Ltd., bid price: 168,779,166.4 yuan ; Third winning bidder: China First Metallurgical Group Corporation, bid price: 199.85 million yuan.
Reply #22026-03-16
Construction scale: Yunnan Dawa Coking Co., Ltd. currently has 4×55-hole 5.5m rammed coke ovens, along with two associated wet quenching systems. The annual coke production capacity is 2 million tons. Cokes ovens No. 1 and No. 2 belong to System A, while cokes ovens No. 3 and No. 4 belong to System B. The wet quenching process is used for coke production; however, in order to recover the sensible heat of red coke, reduce energy consumption, minimize pollution, and improve the quality of coke, it has been decided to adopt the dry quenching process instead. The energy-saving and environmental protection project for dry quenching of coke at Yunnan Dawa Coking Co., Ltd. is being carried out in two phases. The first phase involves the construction of Unit 1 of System A for dry quenching of coke, with a coke processing capacity of 150 t/h ; The second-phase project involves the construction of Unit 2 of the B system for dry quenching coke, with a coke processing capacity of 150 t/h. The 1# and 2# dry quenching systems are independent of each other; the two wet quenching units currently in use by the company will be retained as backups in case of maintenance or failures of the dry quenching systems. The scope of this tender includes the engineering design for Phase 1, the procurement of equipment and materials, the general contracting for construction, as well as the design for Phase 2. Contents of Phase 1 project construction (construction of Unit 1 dry quenching furnace for System A): Unit 1 dry quenching furnace and its auxiliary facilities are located to the north of the quenching tower of the coke ovens in System A. In addition, a new biological treatment plant with a capacity of 100 m3/h for the advanced treatment of recycled water will be built to the south of the existing wastewater treatment station. A dust removal facility will also be constructed in the existing coke screening and storage building; this includes equipment for transporting red coke, the dry quenching furnace and its gas supply systems, loading and discharging devices, gas circulation system equipment, elevators and auxiliary equipment, a coke processing system (including the sealing of coke conveyor corridors and dust removal upgrades for the coke screening building), environmental protection facilities for dry quenching, a dry quenching boiler and its auxiliary units, a boiler feed water pump station, utility tunnels and pipelines in the dry quenching area, a nitrogen pressurization station, a power distribution room, a safety interlock control system, detectors for flammable and toxic gases, anti-corrosion and insulation works, electrical and instrumentation control systems, a fire alarm system, as well as other auxiliary facilities such as water supply and drainage systems and lighting. Power media such as process water, fire-fighting water, domestic water, demineralized water, circulating water, electricity, coke oven gas, low-pressure steam, instrument compressed air, ordinary compressed air, and nitrogen are all connected to the power pipeline network of Yunnan Dawa Coking Co., Ltd.
Reply #32026-03-16
【Common Issues in Haichuan Pipeline Design】--Calculation of Fluid Conveyance Pipelines https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715465 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #42026-03-17
【3D Process Flow】Summary Post--Two-Phase Extraction https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715799 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52026-03-17
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Distribution room doors designed to open inward https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715825 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #62026-03-17
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Distribution room doors designed to open inward https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715825 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #72026-03-21
【Ten Years of Rapid Development in Chemical Equipment】China’s Giant Fiber Production Line for Electronic Use, the Largest of Its Kind in the World, Goes Online 3041-2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715973 (Source: Haichuan Chemical Forum (HCBBS))
Reply #82026-03-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first large-scale TO+RTO combustion unit independently designed by the Beijing Aerospace Power Research Institute has been operating at full capacity since 2034–2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716014 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-03-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestically developed third-generation nuclear power steam release isolation valve for the \"Hualong One\" reactor, model 3045-2026, has been officially shipped. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716068 (Source: Haichuan Chemical Engineering Forum (Hcbbs))
Reply #102026-03-23
【HaiChuan Equipment Guessing Game】--What kind of device would have such a forest of valves? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716193 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.