HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Public Announcement on the Comprehensive Demonstration Project for Clean and Efficient Conversion of Coal at Tiaohu in China National Coal Group (Coal-to-Oil Project)

2026-04-11View Original

Thread Content

Recently, a public disclosure of information regarding public participation in the social stability risk analysis for China National Coal Group’s Tiaohu Coal Clean and Efficient Conversion Multi-Energy Integration Comprehensive Demonstration Project (coal-to-oil project) was released. In accordance with the requirements of the \"Interim Measures for the Assessment of Social Stability Risks for Major Fixed-Asset Investment Projects by the Development and Reform Commission\" (Document No. Fa Gai Tou Zi 2492) and the \"Measures for the Assessment of Social Stability Risks for Major Fixed-Asset Investment Projects in the Xinjiang Uygur Autonomous Region by the Development and Reform Commission\" (Document No. Xin Fa Gai Gui 1), a public consultation is now being conducted regarding the assessment of social stability risks for the China National Coal Group Tiaohu Coal Clean and Efficient Conversion Multi-Energy Integration Comprehensive Demonstration Project (coal-to-oil project). Project Name: China National Coal Group Santanghu Clean and Efficient Coal Conversion and Multi-Energy Integration Comprehensive Demonstration Project (Coal-to-Oil Project)
Construction Unit: Xinjiang China National Coal Energy Chemical Co., Ltd.
Report Preparation Unit: China National Coal Group Tianjin Design and Engineering Co., Ltd.
Project Overview: China National Coal Group plans to build the China National Coal Group Santanghu Clean and Efficient Coal Conversion and Multi-Energy Integration Comprehensive Demonstration Project (Coal-to-Oil Project) in the Santanghu Industrial Park, Bariqun County, Hami. The project relies on the resources of Zhongmei Tiaohu No.1 Coal Mine as well as surrounding coal resources. The raw coal is gasified and purified to produce syngas, which is then used in a synthesis unit to manufacture petroleum products; these products are further refined through processing units to yield gasoline, diesel, aviation kerosene, and other products. The entire project is powered by green electricity, which helps to significantly reduce the energy consumption and CO2 emissions of coal-based chemical processing projects with high energy demands. At the same time, the project is equipped with large-scale green hydrogen production facilities; the use of green hydrogen in combination with coal gasification helps to reduce CO2 emissions during the production process. The total investment is approximately 57.287 billion yuan. As a wholly-owned subsidiary of China National Coal Group, China National Coal Group Xinjiang Company is responsible for overseeing the safety management, local coordination, marketing, regional planning, and new energy development activities of China National Coal Group’s enterprises in Xinjiang, serving as the key force behind the group’s development there. Guided by the overall energy development landscape of Xinjiang, China National Coal Group Xinjiang Company, in accordance with China National Coal Group’s investment and development plan for Xinjiang, adheres to the development positioning that “the Xinjiang region serves as the Group’s comprehensive energy strategic base.” Following the development philosophy of “improving efficiency of existing assets while facilitating transformation of new ones,” the company implements its “1355” development strategy. With a focus on the “three major industrial bases,” it promotes the integrated development of the entire “coal-electricity-chemicals-new energy” industrial chain, striving to establish a new type of comprehensive energy strategic base characterized by industrial synergy, coupled development, multi-energy complementarity, and green, low-carbon operations—one that exerts regional influence.
Reply #22026-04-11
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Incorrect Installation Direction of the Flange Cover on the Drain Valve of Storage Tanks https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717574 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-04-11
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Incorrect Installation Direction of the Flange Cover on the Drain Valve of Storage Tanks https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717574 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42026-04-11
[3D Process Flow] [3D Process Flow] Compilation post -- Petroleum refining process flow diagram 16 -- Molecular sieve adsorption and purification process flow diagram https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717601 (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #52026-04-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】The on-site facility for China’s first pilot project related to carbon capture, utilization, and storage as well as enhanced natural gas recovery (CCUS-EGR) in high-sulfur gas fields was successfully put into operation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717658 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-04-15
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Choosing the Sampling Point for Pressure Gauges Below Horizontal Pipes https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717839 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #72026-04-16
【Ten Years of Rapid Development in Chemical Processing Equipment】The world’s first pilot plant for hydrogen metallurgy using green electricity and green hydrogen was put into operation at Ansteel’s Bayuquan production facility from 3084 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717808 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82026-04-16
【Ten Years of Rapid Development in Chemical Equipment】Successful One-Time Commissioning of Lianyungang’s World’s First Process for Converting Light Hydrocarbons into Ethylene Glycol, 3085–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717840 (Source: Haichuan Chemical Forum (HCBBS))
Reply #92026-04-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】China National Petroleum’s first megawatt-class PEM hydrogen production system passed the authoritative CNAS testing and certification https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717958 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102026-04-17
【HaiChuan Safety Discussion】Hidden Dangers Around Us – The Use of Submersible Long-Shaft Pumps for Oil-Contaminated Sewage Pumps in Tank Areas https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717995 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.