Considerations and elimination of liquid seals and gas collection in design

2017-05-10View Original

Thread Content

As shown in the figure: To reduce cooling due to gas phase entrainment, the water cooler inside the tower uses cold water that flows from bottom to top to cool the top of the tower. However, a liquid seal was considered during the design, which results in a basin-shaped structure in the actual piping; as a result, the gaseous phase of cold water cannot be removed, affecting the cooling efficiency. Is there a problem with the design aspect of the process, or is it an issue with our actual operations?
Reply #22017-05-13
Adding a liquid seal can prevent residual water from remaining in the heat exchanger in cases where cooling water is unavailable, such as when the pump stops operating. Cann’t the gas inside the heat exchanger be removed through the exhaust valve?
Reply #32017-05-13
No exhaust valve is installed at the high point; there is concern that the presence of a gas phase during operation may affect the heat exchange efficiency.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.