Participation reward: 2 Wealth. Correct reward: 6 wealth. Multiple-choice question: In the layout and installation of indoor gas pipes, (  ) is incorrect. A. The inlet pipe should lead directly into the gas room; it must not pass through electrical rooms, bedrooms, bathrooms, or air ducts. B. Threaded plugs and tees should be installed at both the top and bottom of the gas vertical pipe, with a diameter of no less than 15 mm. C. The pipes should have a slope of more than 0.005, sloping towards the city’s distribution pipes. D. The customer’s branch pipes should be installed in the kitchen, at a height of no less than 1.7 m. B
Reply #22017-05-24
B. Threaded plug tees should be installed at the top and bottom of the gas riser, with a diameter of not less than 15 mm

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.