For a new ethylene plant, Huanqiu and SEI in China are responsible for the process package design. At the time of initial commissioning, did the design firms provide a commissioning plan or guidance? Thank you for your advice! !
Well, usually it’s the design team that organizes the driving~
This definitely isn’t the case; SEI and Global certainly won’t arrange for someone to drive for you
The process package supplier provides startup plans and guidance for startup, but does not organize the actual startup process
The process package supplier will only provide the operation manual; it will not organize the commissioning process nor supply a commissioning plan. The design institute will only offer assistance with the commissioning
Well, it’s not clear if I don’t mention these two large companies; in any case, it’s the design institute that helps with the operation.
It was provided in a timely manner, but it only serves as a guide
The \"Overall Commissioning Plan\" is prepared by the constructor, with the involvement of the design institute. In the case of a Turn Key project, the general contractor is responsible for all operations until the performance evaluation is completed.
It depends on how the contract is drafted; if it stipulates that the design institute shall provide it, then it will be provided, but if not, the design institute generally won’t provide it.
The principle plan for the commissioning design is provided by the process package, while the operation commissioning plan is prepared by the owner based on the principle plan of the design