Thread Content
As is well known, in the chemical industry, the pipe outlet orientation diagram is prepared by the piping specialty. However, upon reviewing standards such as the \"Standards for the Preparation of Design Documents for Petrochemical Plants,\" it was found that no provisions regarding this are included. Is it necessary to prepare such a diagram in the petrochemical industry? Which major will it come from?
It is used in pipeline design when carrying out process design or equipment design
The orientation of the pipe outlets for general equipment is determined through joint consultation between the equipment specialist and the piping specialist, followed by the creation of the drawings;
The Luoyang Office initiated the request on behalf of the piping specialty; the equipment drawings were prepared
After the equipment specialty prepares the diagram showing the locations of the equipment connections, it is handed over to the process piping specialty.
The piping specialty determines the position of the pipe ends based on the pipeline layout, with the equipment specialty providing its approval
The piping team sets the conditions; the equipment team prepares the drawings
Process piping requirements – drawings prepared by the equipment team
Our pipeline engineering department specifies the requirements for the pipe outlet layout diagrams; after approval by the instrumentation and process engineering teams, the equipment is supplied. The equipment engineering department prepares the pipe outlet layout diagrams as required, after which the process, pipeline, and instrumentation teams give their approval before the equipment is sent to the manufacturer
We are omnipotent. It’s not divided that finely. The process team takes care of everything.