HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Moving from a separate control room to a combined control room

2018-07-11View Original

Thread Content

In August, the control room for our facility will be moved from a single operation room to a combined control room; at that time, 4-5 facilities will be operated from this large control room together. Moving to a new place is like moving into a new home. As a technician, how can I prepare properly to ensure that this move goes smoothly? I’ve never had such an experience before, so I’d like to ask for Chuanyou’s advice and gather everyone’s insights.
Reply #22018-07-12
Familiar with the processes in this area as well as the locations of interfaces with other processes
Reply #32018-07-12
There’s nothing special to pay attention to. If you’re doing internal operations, get familiar with the interface in advance

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.