HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The bed layer in the dechlorination tank of the reprocessing unit has clogged, preventing the removal of the material

2018-12-13View Original

Thread Content

The bed in the dechlorination tank of the reprocessing unit has hardened and solidified, making it impossible to remove the material from it. The hardening is severe; the layer is very compact. Since the lower layer is empty, it’s not possible for people to enter there, and it’s also difficult to add water. After two days of attempts to remove the material, only a small hole was managed to create! Is there any other way?
Reply #22018-12-27
Your dechlorinating agent isn’t heat-resistant and its water-absorption capacity is poor; it would be better to switch to a different manufacturer of dechlorinating agents, as they add an ingredient to their products to prevent coking. Make sure to agree on the operating conditions with the manufacturer first!
Reply #32018-12-29
This is a hydrogen dechlorination agent; the operating condition is only 4℃

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.