HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What qualifications are required to supply chemical processing equipment in skid form?

2019-02-26View Original

Thread Content

What qualifications are required for supplying items in the form of levers? What about pressure vessels, pressure pipelines, and anything else? Please give some advice
Reply #22019-02-26
Generally, only the design and manufacturing qualifications for pressure vessels and pressure pipelines are required.
Reply #32019-02-27
Skid-mounted manufacturing falls into a gray area of regulation; it is considered factory production with the finished products leaving the factory, and each skid has its own independent functions. From a responsible perspective, certain design and manufacturing qualifications as well as management systems are necessary to ensure the quality and performance of skid-mounted products. In terms of regulation, there is a lack of oversight in general due to the absence of clear, mandatory regulatory guidelines. In practice, some skid-mounted units with simple processes, simple structures, and small sizes often don’t even come with a certificate of conformity.
Reply #42019-02-27
Thank you for your reply; I’ve learned a bit more. Indeed, the person who gave me the quote didn’t ask about any special qualifications either
Reply #52019-03-01
**The General Administration of Quality Supervision, Inspection and Quarantine states in its “Special Notice No. 32 on Issues Related to the Safety Inspection of Pressure Equipment” that: III. Skid-mounted pressure equipment systems – The manufacturers of skid-mounted pressure equipment systems must possess a manufacturing license for pressure vessels corresponding to the appropriate category. The pressure vessels in the system should be designed and manufactured by entities holding a design and manufacturing license for pressure vessels of the appropriate category, while the piping design in the system can be carried out by entities with a design license for pressure piping of the corresponding level, or by the same entity that designs the pressure vessels in the system.
Reply #62019-03-04
Just the qualifications required for the equipment installed on skids, I guess. But it’s also possible to take a shortcut: the original manufacturer of the equipment has the necessary qualifications, while the assembly company merely carries out the assembly work. If the owner agrees

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.