HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Hydrogen and chlorine pipelines must use double-headed bolts

2019-05-11View Original

Thread Content

I would like to ask whether double-ended bolts are necessary for the flanges of hydrogen and chlorine pipelines? Refer to that specification
Reply #22019-05-11
This post was last edited by xunzaonvdun on 2019-5-11 at 13:09. For HGT20613-2009 5.0.3, full-threaded studs should be used
Reply #32019-05-11
These days, single-headed bolts are basically not used in industrial pipelines anymore; instead, fully threaded studs are employed
Reply #42019-05-11
Generally, it consists of a high-neck flange, a wound gasket, and fully threaded studs

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.