HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Secondary grouting for steel structures

2019-11-27View Original

Thread Content

Construction is being carried out on a unit basis; the secondary grouting of steel structures has entered winter, with minimum temperatures of -8°C. Antifreeze is planned to be added for the secondary grouting. What do you all think, sea friends? Is it okay?
Reply #22019-11-27
Which standard specifies the use of antifreeze in this construction grouting material? I’d like to take a look and learn more about it

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.