Steam condensate pipeline setup

2020-03-11View Original

Thread Content

I have a question for the teachers: Is it okay for me to prepare it in this way? The pipeline is about 100 meters long; it runs along a main corridor – can my steam condensate get there? Is there enough power?
Reply #22020-03-11
Why is it placed behind the main frame? There is enough power, but water tends to accumulate at the lower part of the gantry.....
Reply #32020-03-11
Thank you, as there are 4 identical units that collect at the center
Reply #42020-03-11
What I mean is that the condensate tank should be installed before the main pipeline frame (on the main pipe before the slope).
Reply #52020-03-11
Is your flow control orifice plate installed on a 25-kilogram steam pipeline? Why connect it this way? Steam has entered the condensate pipeline, making it difficult to return the condensate to the tank.
Reply #62020-03-11
It’s not a flow limiter on the steam pipeline; it’s added to the drain line
Reply #72020-03-11
My main pipe is located on a slope, and water definitely accumulates at the gantry area; there’s nothing that can be done about it. I have four sets of devices, each of which uses its own pipe, which then converge into the main pipe in the main corridor, before the water is collected in a central area between the four sets of devices. The power unit will do
Reply #82020-03-11
I don’t know how far it is, nor do I know what the pressure in your return tank is. Generally, except for the line related to the flow-limiting orifice plate, the rest can be connected at a 45° angle along the direction of flow.
Reply #92020-03-12
Hello, are you saying that for the slope in my pipeline, a value of 45 should be used, rather than a straight upward or downward slope?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.