HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Distance between Class B equipment and control room

2020-04-01View Original

Thread Content

:I’m facing such a problem now and would like to seek advice from experts. There is a chemical project that falls under the category of fine chemicals; since liquid ammonia is used in it, it qualifies as a Class B facility. It certainly isn’t a petrochemical project. 1. Is it necessary for the control room to comply with GB50779-2012? 2. The distance from the device to the control room is approximately 90 meters, and there is a firewall in the control room facing the Class B device. Is this approach feasible? 3. In accordance with the requirements of HG/T20508-2014, for chemical plants with explosion hazards, the control rooms and field control rooms shall be designed with explosion-resistant structures. It is necessary to have explosion-resistant walls on all four sides of the control room, or is it sufficient to have such explosion-resistant structures on the side facing the hazard?
Reply #22020-08-03
This post was last edited by goldliyang on 2020-8-5 at 16:36. Hello, our company specializes in designing blast-resistant modifications
Reply #32020-08-04
This post was last edited by goldliyang on 2020-8-5 at 16:36; feel free to contact you if needed
Reply #42022-10-13
Conduct an explosion impact analysis to determine whether the control room is within the range of the explosion’s effects; if it is, blast-resistant design must be implemented in accordance with relevant requirements; If it is not present, a firewall should be installed on the side facing fires or explosions, as long as the spacing requirements are met ; (I’ve experienced it personally; experts agree with this logic – since your 90-meter spacing surely meets the specifications, it then comes down to the range of the explosion’s impact.)
Reply #52022-10-13
The explosion shock wave should be less than 9000 Pa. For Class B buildings, a distance of 10 units from other Class A and Class B buildings is generally sufficient, as specified by fire safety regulations.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.