HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Help: Detailed Rules for Digital Delivery in Engineering Construction

2020-05-22View Original

Thread Content

This post was last edited by Wise Ming on 2020-5-22 at 17:00. Does any member have the \"Detailed Rules for Digital Delivery in Engineering Construction\" issued by Sinopec?
Reply #22020-05-22
The Detailed Rules outline the methods for petrochemical engineering projects to employ digital delivery approaches under various management models such as EPC and E+P+C. These methods involve forward modeling during the design, procurement, construction, and commissioning phases, thereby enabling the simultaneous completion of the digital factory and the physical factory. They constitute a framework for building digital factories that can be applied within Sinopec, improving the efficiency, quality, and standardization of factory construction. Such frameworks support the development of world-class petrochemical facilities and lay the foundation for Sinopec to establish a unified digital project management platform.
Reply #32020-05-23
This is something only insiders can do, right? Seeking help with tracking as well
Reply #42020-05-24
**In September 2018, the Ministry of Housing and Urban-Rural Development issued GB/T51296-2018, the \"Standard for Digital Delivery of Petrochemical Projects\", which came into effect on March 1, 2019. Subsequently, in line with its own characteristics and development needs and by referring to the aforementioned standards, Sinopec formulated and issued the \"Detailed Rules for the Digital Delivery of Petrochemical Projects\" (trial version) in October 2019, which came into trial implementation on January 1, 2020.
Reply #52020-05-24
Simultaneous construction and delivery of digital and physical plants for refining and chemical processing facilities: https://bbs.hcbbs.com/thread-2867046-1-1.html GBT 51296-2018 Standard for Digital Delivery in Petrochemical Projects (high-definition version): https://bbs.hcbbs.com/thread-2160043-1-1.html (Source: Huahai Chuanliu – Haichuan Chemical Industry Forum Website)
Reply #62020-05-26
SPMP-STD-EM1002-2016 specifies the procedures for design coordination meetings in construction projects; so why was there a change in the 2019 version – wasn’t it just an upgrade?
Reply #72020-05-26
There are significant differences between the \"Detailed Rules for Digital Delivery in Engineering Construction\" and the \"Provisions on Design Coordination Meetings for Construction Projects\"; has the document number been updated?
Reply #82021-11-06
OP, are the Detailed Rules for Digital Delivery in Engineering Construction available yet? Here is the email address: 22451186@qq.com
Reply #92022-01-26
Sinopec has currently carried out digital transformation initiatives in four areas: group-level management, sector-specific operations, specialized management, as well as new business forms and models. Sinopec needs to define what internal digital transformation means within the petroleum and petrochemical industry, understand its essence in depth, analyze its key components, pay attention to the three phases and four steps involved in this process, gain a thorough understanding of the trends and indicator systems related to digital transformation, strengthen data-driven management, and increase investment in digital infrastructure. By doing so, information technology development can serve as a solid foundation for implementing Sinopec’s overall digital transformation strategy, thereby driving continuous progress in this area. From April 20 to 21, 2021, the Third China Petroleum and Petrochemical Intelligence Technology Exchange Conference and Summit Forum on Digital Transformation of Petroleum and Petrochemical Enterprises was held in Beijing. The conference was organized by the Petroleum and Petrochemical Engineering Research Association, with the participation of over 20 academicians, leaders, experts, and scholars from various ministries and commissions, industry associations, as well as petroleum, petrochemical, and information technology companies. The conference featured discussions on the latest achievements in enterprise informatization development and digital transformation plans for the 14th Five-Year Plan period, as well as ways in which the petroleum and petrochemical industry can utilize new information technologies such as 5G, cloud computing, and blockchain to build “smart cloud” industrial internet platforms. It also explored the development of intelligent oil and gas systems, smart factories, smart gas stations, smart research institutions, and smart engineering projects, with the goal of achieving cloud-based production and intelligent operation across the entire industry and accelerating digital transformation
Reply #102022-01-26
Sinopec formulated and issued the \"Detailed Rules for the Digital Delivery of Petrochemical Projects\" (trial version) in October 2019, and it came into effect on January 1, 2020; seeking experts’ advice

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.