Problems with tank fixation after nitrogen sealing

2021-04-08View Original

Thread Content

The old storage tank originally did not have foot bolts; after installing a nitrogen seal, bolts were needed, but since welding was not allowed, how could anchoring be achieved? Please ask an expert for help
Reply #22021-04-09
Drill holes on top of the existing structure. Then, strictly control the roughness of the inner wall, embed the bolts in advance, position the equipment, carry out the first grouting, and then the second grouting. For reference.
Reply #32021-04-11
Add a collar to the outer wall of the storage tank; the collars should be placed at 90-degree intervals, with four in total, and they are connected together using bolts. The foundation bolts are then attached to these collars

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.