HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Electrical installation tray

2021-06-17View Original

Thread Content

The purchase order issued by the electrical engineer specifies 100*100. The customer believes that 100*100 is suitable for the main cable tray, but 100*100 is too large for the auxiliary cable tray; 50*50 would be better. The site wanted to standardize the specifications by using existing materials, but the customer disagreed, so construction has been suspended for now. It’s completely fine to use larger or higher-grade cable trays in place of smaller or lower-grade ones; at most, it will result in some waste of material. It takes at least 1-2 days to resend the materials. Can we carry out the work on site without first confirming it with the property owner?
Reply #22021-06-18
Personally, I think it won’t work; Party A is the boss
Reply #32021-06-18
The customer requested 50*50, saying that 100*100 didn’t match!
Reply #42021-06-19
Party A is in charge; whatever they say goes, as long as it can be installed

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.