HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Why cannot Class B liquid materials be transported directly from the facility to the loading station for immediate loading? Is it necessary to go to the tank area first before sending it to the loading station? Is there a regulatory basis?

2022-06-13View Original

Thread Content

I have a question: Why, during design, cannot Class B liquid materials be directly pumped from the facility to the loading station for loading? Do I have to go to the tank area first? Is there any legal or regulatory basis? During the safety and environmental assessment, experts all put forward this requirement. Could my colleagues please help answer this?
Reply #22022-06-13
From the perspective of safe production. Imagine what would happen if something went wrong during the loading process and damaged the device? There are safety distances and safeguards between the equipment and the tank area, as well as between the tank area and the filling station. Multiple safety redundancy measures ensure the safe operation of the chemical production facilities.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.