HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What standard requirements should be followed when drawing equipment assembly diagrams? This includes pipe connection lists, technical specifications, etc

2024-07-15View Original

Thread Content

What standard requirements should be followed when drawing equipment assembly diagrams? This includes pipe connection lists, technical specifications, etc
Reply #22024-07-15
Equipment assembly drawings usually need to be drawn in accordance with relevant standards such as GB/T 1804-2000 \"General tolerances – Tolerance principles, tolerances, limits and fits\". The drawings should include a complete list of pipe ends, technical requirements, dimensional tolerances, materials, surface treatment, and other information to ensure the accuracy and standardization of production and inspection processes. At the same time, industry-specific standards and internal company technical specifications should also be followed. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.