【HaiChuan Chemical Project Updates】New 1.3 million-ton per year project in Yuncheng, Shanxi for producing LNG and hydrogen via coking furnace gas

2024-08-01View Original

Thread Content

This post was last edited by Desert Fish on 2024-8-1 at 08:19. A new project in Yuncheng City, Shanxi Province, aims to produce LNG and hydrogen through the use of 1.3 million tons per year of coking plant gas. Project basics: Project type – Under construction; Industry sector – Petrochemical engineering/energy industry; Field of operation – Hydrogen/natural gas; Province – Shanxi Province; City – Yuncheng City; Progress stage – Civil construction in progress; Date of publication – 2024-07-25; Tracking version number – 0; Nature of the project – New construction; Total budget investment (in ten thousand yuan) – 31,126; Type of investment – Non-governmental investment; Funding status – Funds have been secured; Construction standard – Medium-level industry standard; Estimated start date – 2023; Estimated completion date – 2024; Source of equipment – Domestic procurement; Number of building floors – 0; Location of the project – Yuncheng City, Shanxi Province; Required materials and equipment: Main equipment includes pigging devices, oil storage tanks, high-pressure separators, heaters, RCO molecular sieve catalytic burners, reciprocating piston compressors, separators, gas-liquid separators, pre-coolers, coolers, and equipment for the synthesis phase (reactors, circulation compressors, electric heaters, desulfurization towers, heaters for desulfurization towers, etc.). (For more details, please contact by phone.) Project progress: 1. Administrative procedures – The preliminary procedures for this project have been completed. 2. Design completion status: The design for this project has been completed. 3. Civil construction status: The main works of the project are currently under construction. 4. Equipment procurement status: Some of the equipment for this project has been purchased.
Reply #22024-08-01
Project details: Construction scope: The project uses the excess coke oven gas generated as a by-product of coking operations as raw material to produce LNG and hydrogen, with an output of 9,285 Nm3 of LNG and 2,300 Nm3 of hydrogen per hour. Main construction components: include compression section, pretreatment, advanced desulfurization, methane processing unit, purification unit, cryogenic separation, PSA hydrogen production, and LNG and hydrogen storage and transportation processes.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.