Thread Content
This post was last edited by Desert Fish on 2024-8-1 at 08:19. A new project in Yuncheng City, Shanxi Province, aims to produce LNG and hydrogen through the use of 1.3 million tons per year of coking plant gas. Project basics: Project type – Under construction; Industry sector – Petrochemical engineering/energy industry; Field of operation – Hydrogen/natural gas; Province – Shanxi Province; City – Yuncheng City; Progress stage – Civil construction in progress; Date of publication – 2024-07-25; Tracking version number – 0; Nature of the project – New construction; Total budget investment (in ten thousand yuan) – 31,126; Type of investment – Non-governmental investment; Funding status – Funds have been secured; Construction standard – Medium-level industry standard; Estimated start date – 2023; Estimated completion date – 2024; Source of equipment – Domestic procurement; Number of building floors – 0; Location of the project – Yuncheng City, Shanxi Province; Required materials and equipment: Main equipment includes pigging devices, oil storage tanks, high-pressure separators, heaters, RCO molecular sieve catalytic burners, reciprocating piston compressors, separators, gas-liquid separators, pre-coolers, coolers, and equipment for the synthesis phase (reactors, circulation compressors, electric heaters, desulfurization towers, heaters for desulfurization towers, etc.). (For more details, please contact by phone.) Project progress: 1. Administrative procedures – The preliminary procedures for this project have been completed. 2. Design completion status: The design for this project has been completed. 3. Civil construction status: The main works of the project are currently under construction. 4. Equipment procurement status: Some of the equipment for this project has been purchased.
Project details: Construction scope: The project uses the excess coke oven gas generated as a by-product of coking operations as raw material to produce LNG and hydrogen, with an output of 9,285 Nm3 of LNG and 2,300 Nm3 of hydrogen per hour. Main construction components: include compression section, pretreatment, advanced desulfurization, methane processing unit, purification unit, cryogenic separation, PSA hydrogen production, and LNG and hydrogen storage and transportation processes.