HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Does a newly added steel structure platform in the workshop count as part of the building area?

2025-03-11View Original

Thread Content

For Class A existing workshops and those that are under expansion, where new steel structural support equipment is installed, does the steel structural operation, inspection, and maintenance platform count as part of the building area?
Reply #22025-03-12
If the newly added steel structure operation, inspection, and maintenance platform is a permanent structure and can increase the usable area, it is generally included in the building area. It is also necessary to refer to the local building regulations and standards. .
Reply #32025-03-17
Some can be excluded, such as the high-level tank platform and the feeding platform. There is an area calculation with constant operations. You can check the specifications for fine chemical engineering design for details

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.