Is the ladder network diagram I drew correct? As shown in the figure

2017-01-22View Original

Thread Content

The operator station also serves as server stations A and B
Reply #22017-01-24
Oh, the switch also has an extra spare set
Reply #32017-01-24
Do we need to add more switches? So how should it be connected? The network ports on the AB devices are not enough; should switches be connected to each other? Seeking advice
Reply #42017-01-24
No addition, it’s the same as ours – double the amount per use

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.