Thread Content
A new project requires assistance in obtaining templates for tender documents related to instrumentation and DCS control systems. Also, was this tender document prepared by the owner or by the design institute?
As long as you pay, anyone can write for you.
If it’s the design institute that takes overall responsibility, then the design institute will prepare it; if you handle the procurement yourself, then you’ll be the one to prepare it
The easiest way is to find a few suppliers and have them provide it
The design institute provides the templates, and the client adds their own brand requirements and special specifications based on those
It is said that foreign companies take a year to draft the tender documents for projects; I wonder why the conflict between efficiency and quality is so severe? !
It’s all about copying in the country; of course, things also develop quickly. There are also many tender documents that are contradictory from start to finish~
The company responsible for bidding can provide template materials.
The owner’s project managers of many joint ventures are often severely criticized because the EPC contract takes a year to finalize.
The design institute usually provides the technical requirements for DCS, which allows one to prepare the tender documents on their own; alternatively, the design institute can also do this, depending on what is specified in the contract