HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

When measuring blast furnace gas, the pressure guiding pipe is relatively long – is insulation or heating necessary?

2019-11-06View Original

Thread Content

The company is in the north, and a elbow flow meter is to be installed on-site. The pressure guide tube is installed at the top of the pipeline; due to the large diameter of the pipeline, the pressure guide tube is quite long. Is it necessary to provide insulation and heating in winter?
Reply #22019-11-06
The purpose of insulation and heating is to prevent freezing and condensation; if the medium does not freeze or condense, then insulation and heating are not necessary. When considering whether a medium will freeze or condense, it is necessary to take into account the presence of substances that can cause condensation. For example: whether condensation water is formed in the air when its moisture content is below the dew point.
Reply #32019-11-06
Get insurance; although theoretically the condensed liquid will flow back into the pipes, extreme weather conditions cause rapid freezing as well.
Reply #42019-11-06
You don’t even need to think about it – for pressure pipes of this length, regardless of the medium used, it’s sufficient to provide heat tracing.
Reply #52019-11-07
It is necessary; the moisture content in blast furnace gas is usually saturated water, and it can indeed freeze at low ambient temperatures
Reply #62019-11-07
There should be insulation; although it’s not really necessary in most cases, it could still damage your instruments if something goes wrong
Reply #72019-11-08
Daoran needs it; blast furnace gas has a high water content! Any gas containing water must be insulated and heated when it freezes!
Reply #82019-11-08
The steam situation on my end is the same as yours; on top of that, it freezes frequently, not to mention when no steam is used at all
Reply #92019-11-16
Which instruments require insulation and which require heat tracing? What factors should be considered?
Reply #102019-11-16
In practice, it’s best to have pictures; who can know how your pipes are arranged?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.