HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Three simultaneities for extrusion granulation units

2019-11-08View Original

Thread Content

When starting up the extrusion granulation unit, the cutter, material, and particle water must all reach the water chamber at the same time in order to carry out underwater granulation. If water arrives first and remains there for a long time, it will cause the temperature of the mold to drop. If the material arrives at that time, the low temperature can lead to blockages in the mold holes. On the other hand, if the material arrives first and particle water does not arrive for an extended period, the high temperature can cause problems such as blade wear and tailing. Over the years, adjustments have been made depending on whether adjustments are necessary based on different material grades, as well as taking into account factors such as pipeline conditions, operating conditions, and equipment control methods. Has anyone written papers on this topic? Could such papers be shared for reference?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.