Replacement cycle of instrument components

2019-11-26View Original

Thread Content

The company’s packaging line is equipped with a variety of components such as diffuse reflection photoelectric switches, magnetic switches for detecting cylinder position and mechanical position, fuses, and relays. Due to the frequent movement of various moving parts, the likelihood of failures is high. So, how often is it reasonable to replace these components? Are there any relevant regulations that specify this?
Reply #22019-11-26
There is no clear specification. If the cylinder operates 2-3 times per minute at such a frequency, similar to PSA units used in hydrogen production, it generally needs to be replaced entirely after 2 years. Get more accessories for the other items; their lifespan is generally longer than that of cylinders.
Reply #32019-11-26
There is no explicit regulation for this. As long as it does not affect the production process, there are two methods: the first is to calculate based on the number of times the device is switched on by the manufacturer and its service life; the second is to rely on experience by estimating the average time interval during which each component fails. The failure interval may vary depending on the specific working station. By determining these intervals, components can be replaced at regular intervals in advance, thereby avoiding losses caused by sudden stops
Reply #42019-11-26
It is best to consult the supplier, as it also has a lot to do with operating conditions and the frequency of operations!
Reply #52022-05-24
The failure cycle requires a large amount of failure data, but the machine has already stopped by then
Reply #62022-05-24
For sensors of the same type, attention should be paid if a failure occurs for the second time; production equipment generally does not tolerate frequent failures
Reply #72022-05-28
Compare similar use cases and experiences; consult equipment manufacturers and EPC service providers – there is no clear replacement cycle for consumables

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.