Process Engineering Division – Instrumentation and Automation Section – Daily Question – Question from 2020-11-11: Discussion question: 293. Please list the instances of improper installation of instrument pressure tubes that you have seen
Reply #22020-11-11
You can refer to the following post: Series of posts on preventing common problems in instrument installation (updated dynamically----10.28) https://bbs.hcbbs.com/thread-3067732-1-1.html
Reply #32020-11-11
The last edit to this post was made by yyszyj on 2020-11-11 at 08:13. For pressure pipelines, the issues include too many bends, pressure-taking devices located at bends or dead ends, pressure-taking pipes extending into the fluid, the isolation valve being too close to the pressure-taking device, and the installation of the pressure conduit not ensuring an appropriate inclination
Reply #42020-11-11
The instrument pressure guide tubes were not cleaned or purged before installation; no secondary purging was carried out after the airtightness test, and no expansion compensation bends were used during installation
Reply #52020-11-11
Too many bends, incomplete drainage, uneven laying, etc
Reply #62020-11-11
The main issues are: some pipelines are too long, which can lead to blockages; Some installation requirements stipulate that the surface should not be level ; Turning too much or too little ; The installed condenser and gas collector are not appropriate; the safety features of the three-valve assembly are incorrect, etc.
Reply #72020-11-11
The instrument pressure guide tubes were not cleaned or purged before installation; no secondary purging was carried out after the airtightness test, and no expansion compensation bends were used during installation
Reply #82020-11-12
Leaks, improper size of the sleeve, lack of protective welding, warping, messy arrangement
Reply #92020-11-13
The instrument pressure guide tubes were not cleaned or purged before installation; no secondary purging was carried out after the airtightness test, and no expansion compensation bends were used during installation

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.