HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Device instrument calibration

2021-06-28View Original

Thread Content

I have a question: For example, if there are multiple pressure transmitters and pressure gauges installed on a distillation tower, is it possible to install a standard gauge on the tower during calibration? By applying pressure to the entire tower, the other pressure transmitters and gauges can be calibrated by comparing their readings with those of the standard gauge
Reply #22021-06-28
It definitely doesn’t meet the standards, and a metrology verification agency wouldn’t approve such action either:D
Reply #32021-06-28
That’s a good idea, but I’m not sure if there are any specific requirements regarding the pressure reduction; distillation towers generally operate under negative pressure. Ask if it’s possible; I’d like to learn it too
Reply #42021-06-28
You can directly consult a metrology and calibration agency to see if they’re willing to handle it. Generally, official organizations won’t do this. However, nowadays many authorized private entities might be willing to take on such tasks

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.