Instrument installation

2022-12-21View Original

Thread Content

Please advise on the irregularities in the installation of the instruments shown in the diagram
Reply #22022-12-23
No explosion-proof flexible pipe was connected, no wire gland was used, no supports were installed, no base wires were laid, and there were no markings, etc
Reply #32022-12-23
It is too close to the surrounding railing, which hinders observation
Reply #42022-12-24
The on-site instruments lack explosion-proof measures and are in a state of non-explosion protection.
Reply #52022-12-26
The cables coming out of the conduit lack protective caps; explosion-proof putty has been applied to the openings of the conduit. The guard bars prevent observation, and it’s not clear where the wires coming from behind the root valve are – they’re too far away The surface distance is too close to the equipment above
Reply #62022-12-26
At this site, the concrete floor hasn’t even been laid. The environment is truly harsh
Reply #72022-12-27
The inlet gland does not match the outer diameter of the cable

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.