HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Regarding the issue of cable trays entering the control room

2023-03-24View Original

Thread Content

As shown in the diagram, when no explosion protection requirements apply, the control room is on the second floor; if cable trays are to be installed, should they be inserted through openings following the blue line? Should we still proceed in the red-line manner? Or can both methods be used?
Reply #22023-03-28
The gauge blue line should have a slight downward slope at the top to prevent rainwater from entering. It’s pretty good too. Easy to construct.
Reply #32023-03-28
It’s highly unlikely that it will be possible. Distinguish between explosion-proof and blast-resistant. Water resistance, blast resistance, feasibility, and reliability all need to be taken into account

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.