HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Hey everyone, what should we do if the pressure gauge’s inspection deadline has passed but the report hasn’t been issued yet?

2024-05-04View Original

Thread Content

There’s a checkup next week, it’s really annoying; I’m hoping an experienced person can give me some advice
Reply #22024-05-04
Contact the testing laboratory as soon as possible to see if an expedited processing is possible, or look for another institution with the appropriate qualifications to carry out the testing. At the same time, communicate with the person in charge of the inspection next week to request a delay or seek a temporary solution. .
Reply #32024-05-05
Have someone take a batch to be tested; the results will be available on the same day, or you can simply buy some new watches that have already been tested.
Reply #42024-05-06
“Communicate actively with the testing agency
Reply #52024-05-06
1) Replace the certified gauge; 2) Delete from the ledger so that it is not displayed ; 3) PS or fake ;
Reply #62024-05-07
It depends on which testing agency’s certificate is needed; some agencies issue the certificates on the same day

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.