Plant construction plan

2017-07-31View Original

Thread Content

This post was last edited by Small and on 2017-7-31 14:13. Plant establishment plan: 1. Set up a company and rent workshop space or factory buildings. 2. Secure the funds and prepare a budget. 3. Recruit staff and train employees. 4. Registration and submission for environmental protection, safety, and fire protection related to the project. 5. Identify the equipment, all static equipment and dynamic equipment. 6. Various valves, instruments, and electrical cabinets. 6. After the process plan is finalized, establish an analysis laboratory, purchase analysis equipment, hire analysts, and conduct preliminary tests as early as possible. 8. Raw material procurement, packaging drums, forklifts. Selection of process equipment, procurement, warranty, maintenance, and spare parts. First, purchase equipment at 25–50% of the designed production capacity to carry out small-scale trial production; once successful, proceed with full-scale procurement and installation in two steps. Second, factory buildings and equipment. The production facility covers an area of about 1,000 m2, is single-story with a ceiling height of 10 meters, and it would be better equipped with a crane. It contains a steel structure platform inside. There are approximately: 4 reactors of 1500L capacity, 8 reactors of 3000L capacity, 2 extraction tanks of 6500L capacity, 2 distillation tanks of 5000L capacity, 1 reactor for finished products of 2000L capacity, as well as coolers corresponding to all of these reactors. 1 x 2000L crude product tank. 2 x 2000L circulating storage tanks. The finished product warehouse and solid raw material warehouse cover approximately 500 m2, the liquid storage tank area covers about 300 m2, and there are 3 hazardous liquid storage tanks with a capacity of 40 m3 each. FRP storage tank 100m3. The gas recovery and emission device area covers approximately 200 m2, while the gas-fired steam boiler room is 150 m2 in size; it is a single-story building with a ceiling height of 10 meters. The accident tank has a capacity of 1500 m3, the sewage tank has a capacity of 500 m3, and the fire suppression tank has a capacity of 1500 m3. Fire water pressure: 0.3 MPa. Water replenishment rate: 100 m3/h. The total water consumption per second for indoor and outdoor fire hydrants is 40 L/s. The auxiliary buildings such as office buildings, power distribution rooms, and spare parts warehouses cover an area of around 500 m2. Power supply is classified as a secondary load, while lighting power is considered a tertiary load; the total power capacity for power supply is approximately 8 kW × 20. All the factory sites cover 5 to 10 mu each – all this work is going to drive me crazy; I’m going to be exhausted. It seems like an impossible task, but it has already begun. After May Day, visit equipment manufacturers and take the opportunity to travel around the world. Friends at home are helping to keep looking for factory premises and securing the funds. Every step is important, and none of the links can be missing. This factory represents the first step in my five-year plan; once this step is completed, it will be like the Chinese armored forces that crossed Lang Son during the Self-Defense Counteroffensive against Vietnam – all that’s left then is to advance.
Reply #22017-07-31
After going through all this, you must have gained a lot. . . Some people want to be busy with all these things, but they don’t even have the opportunity~
Reply #32017-07-31
If the factory is built, then it’s time to go all out and make rapid progress; if it isn’t built, it doesn’t matter either – keep trying again and again, keep striving forward.
Reply #42017-07-31
This is to encourage everyone to strengthen themselves in their careers.
Reply #52017-07-31
OP, you’ve decided to go ahead with it – getting the environmental impact assessment done first is the key
Reply #62017-07-31
This post was last edited by Xiao Yu on 2017-8-1 08:37. The production process requires the purchase of acrylonitrile, sodium hydrosulfide tablets, sodium hydroxide, 30% synthetic hydrochloric acid, toluene, sulfur powder, and iron powder. Seeking a direct supplier for long-term supply. I hope that those of you who have these resources can give me a quote; I bow to you all in advance.
Reply #72017-08-01
Building a factory is not a simple task; it requires close cooperation among various departments and professionals under the leadership of the overall supervisor, as well as good relationships with external parties. After all, a person’s energy and capabilities are limited! Especially for chemical projects, it is necessary to identify the sources of process technology in advance, conduct proper safety and environmental assessments, and design according to relevant standards; otherwise, the investment risks will be very high!
Reply #82017-08-01
Thank you, everything is ready – the documentation for safety assessments, environmental impact assessments, fire safety considerations, and the process plan is all prepared

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.