If a shift does not schedule any furnace runs and produces no output from any furnace, what is the coke pushing coefficient for that shift?
Reply #22019-03-25
By observing the time taken for a complete load to be fed in and removed, and dividing this by the number of shifts, the coefficient can be determined. Different coefficients can be applied considering variations in the time required to remove the load from the furnace; the coefficient is then calculated based on the overall time and workload
Reply #32019-05-15
No scorching should occur; it should be zero, as specified by the manufacturer
Reply #42019-05-15
A major maintenance plan is in place, and furnace operations are not scheduled; therefore, the planned number of coke pushers M=0, and the actual number of coke pushers N=0. What is 0÷0 equal to? 1?
Reply #52019-05-16
It’s really hard to say; a coefficient is only available after coke pushing. If the number of times the product is taken out is zero, I think there’s no need to calculate a coke pushing coefficient anymore.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.