HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Regarding the steps to stop heating the 5.5-meter ramming coke oven

2019-07-06View Original

Thread Content

The heating-stop steps have been simplified in the procedures; could someone please list the steps for stopping heating for a short period of time and for a long period of time?
Reply #22019-08-24
For a short period of time? Ask the switch operator in advance to adjust the switch cock to the middle position, thereby reducing the suction force in the flue. For a long period of time? Do the same thing, and ask the temperature tester to close the adjustment valves again.
Reply #32019-09-26
To stop heating for a short period, simply close the exchange valve. Stop heating for a slightly longer period of time; also close the adjustment valves in order to reduce the suction in the flue and decrease the air intake ; After a longer period, stop heating and close the valve on the main gas supply
Reply #42019-09-29
He wants to ask that very little gas is produced, so heating isn’t necessary; the blowers used for recovery have difficulty operating and fail to reach their critical speed

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.