Thread Content
Qitaihe Lulong Mining's 1.5 million-ton coking upgrade and coke oven gas comprehensive utilization project (the core unit of Qitaihe Coal Chemical Cluster of China State Investment Corporation) is currently in the main construction + equipment installation stage and is planned to be put into operation in the first half of 2027. 1. Basic project information Full name of the project: Qitaihe Lulong Mining 1.5 million tons coking upgrading and coke oven gas comprehensive utilization project (the core unit of Qitaihe Coal Chemical Industry Cluster of China International Investment Corporation) construction unit: Construction site of Haiguotou Qitaihe Energy Development Co., Ltd. (a subsidiary of Haiguotou Group): Project Nature of Boli Economic Development Zone, Boli County, Qitaihe City, Heilongjiang Province: Total investment in coking capacity replacement, equipment large-scale, green and low-carbon upgrade, and coke oven gas resource utilization: 2.118 billion yuan (official filing), about 2.2 billion yuan is commonly used by the government/media ; In the early days, there was a preliminary estimate of 1.2-1.5 billion yuan (excluding complete supporting facilities) for the construction period.: Construction will start in 2024 and put into operation in the first half of 2027. II. Core construction content 1. Main body upgrade (core) of the coke oven. The original 4.3-meter backward coke oven will be demolished and a new 2×65-hole 6.3-meter large tamping coke oven (ZHJL6255D type) coke production capacity will be built.: 1.5 million tons/year supporting full-process equipment such as coal preparation, coke screening and storage, ground dust removal, tar ammonia water separation, ammonium sulfate, benzene elution, desulfurization and sulfur recovery, ammonia evaporation, etc. 2. The environmental protection and energy-saving system has built a new dry quenching device to replace traditional wet quenching to achieve the triple benefits of water saving, carbon reduction and waste heat power generation. It is equipped with a dry quenching and waste heat power generation system, which recovers high-temperature waste heat for power generation and builds a desulfurization, denitrification, dust removal, and phenol cyanide wastewater advanced treatment system. The pollutant emissions are significantly better than the national standard 3. Comprehensive utilization of coke oven gas (core of circular economy) recovers 40,000 Nm³/h coke oven gas, purifies, and produces LNG (44,000 tons/year) by cryogenic liquefaction. The gas tail gas is supplied to the Park's Bosheng 18·30 project for the production of synthetic ammonia and urea, building a "coke-chemical" co-production system to produce by-product tar, crude benzene, ammonium sulfate and other chemical raw materials, extending the industrial chain. 3. Project Highlights and Significance Green Transformation Benchmark: Eliminate backward production capacity, reduce energy consumption, water consumption, and pollutant emissions by more than 15% compared with traditional processes. Annual carbon reduction exceeds 10,000 tons, a model of circular economy: Coke oven gas is 100% resource-based, the raw coal utilization rate exceeds 95%, and the solid waste "eats up and squeezes out" is the core of industry collaboration: Provide stable coke and gas support for the Qitaihe Coal Chemical Industry Cluster (total investment of over 10 billion yuan) of China National Investment Corporation, and coordinate regional development of fine chemicals, comprehensive utilization of coal gangue and other projects: Stabilize the local coal chemical industry chain, create employment for more than 1,000 people, and add an annual output value of approximately 3 billion yuan IV. Latest construction trends (March 2026) Project status: Under construction, the current progress of the main construction + equipment installation phase is 1. The coke oven foundation and furnace body masonry are in full progress, and some furnace sections have begun equipment installation. 2. The civil construction of the dry quenching and waste heat power generation system is basically completed, and the core equipment (steam turbine, boiler) has begun to be hoisted. 3. The coke oven gas comprehensive utilization (LNG) device and environmental protection facilities are planned to be put into operation simultaneously.: In the first half of 2027 (overall production is reached) 5. Synergy with park projects provides coke oven gas and coke raw materials for the Bosheng 18·30 ammonia urea project and shares by-product intermediates such as tar and crude benzene with the Honghan fine chemical project, extending the high-end chemical chain. Coal gangue, slag and other solid waste are incorporated into the park's coal gangue comprehensive utilization project to produce building materials and achieve zero solid waste emissions.
[Ocean Equipment Guess] series will continue to be updated in 2027. All Haichuan friends are welcome to participate! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=2079686 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
[Haichuan Spring Festival Tea House] Do you recognize the old objects you saw when you returned to your hometown? (76) Origin of fragrance https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714972 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Thank you for your selfless sharing
[3D Process Flow] Summary Post--Reverse Micelle Extraction Process https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715058 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
[Ten years of development of chemical equipment] 3032-2026 The first set of all-electric drive cracking gas compressors in China was successfully commissioned at Dushanzi Petrochemical Tarim Phase II Ethylene Project https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714974 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
[Ten years of development of chemical equipment] 3034-2026 The world's first fixed-bed copper-based catalyst process, East China University of Science and Technology teamed up with Chlor-Alkali Chemical to overcome the problem of recycling by-product hydrogen chloride https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715177 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
[Ten years of development of chemical equipment] 3035-2026 breaks through 1000℃! Carbon-based heat storage technology achieves major breakthrough https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715185 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
[Ocean Equipment Guess] A hornet’s nest growing on the pipe? ? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715340 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
[Ten years of development of chemical equipment] 3037-2026 my country's first independently designed and built integrated large-scale fracturing engineering ship - "Offshore Oil 696" was delivered in Zhoushan, Zhejiang https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715229 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
[Everyone talks about Haichuan safety] Summary post of hidden dangers around you - with pictures and texts, everyone is welcome to participate in the discussion https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))