Thread Content
The main equipment of Panzhou Jichangping Coal Coking Project has all completed cold-state joint debugging and entered the thermal load test stage on June 15. Lao Chen, the head of the local transportation fleet, pointed to the newly paved asphalt road on the east side of the factory and said: “The coke oven has just been ignited, and heavy trucks transporting clean coal are queued at the Machangkou gas station every day. ” According to the "2026 Key Industrial Project Progress Report" updated by the Guizhou Provincial Department of Industry and Information Technology in June, this project is the only project under construction in the province included in the "Coking Green Upgrade Demonstration List". According to the current pace, it is expected to complete the 72-hour continuous standard operation assessment before the end of September 2026, 45 days ahead of schedule. Guizhou (Shengyixin Energy) Panzhou Coal-Coke-Chemical-Integrated Energy Circular Economy Project is invested and constructed by Shanxi Shengyixin Energy Technology Co., Ltd. with a total investment of 30.9 billion yuan, including an intelligent coal mine with an annual output of 15 million tons, 32 After the project is completed and put into operation, it is expected to have an annual output value of more than 31 billion yuan and create employment for 3,000 people. Cheng Huajie, general manager of Shanxi Shengyixin Energy Technology Co., Ltd., said that Guizhou is rich in coal resources and has a complete range of coal varieties. It has significant comparative advantages in industrial development, and Panzhou has obvious location advantages. The company's products can quickly radiate to surrounding provinces in the future.
[Ten years of development of chemical equipment] 3154-2026 has reached the international leading level! “Evaluation of the key technologies and green industrial application of polymer kettle supercritical foaming! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5722917 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
[History of Haichuan Chemical] Summary Post--Looking at Development from History! Continuously updating! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718076 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
【Haichuan Teahouse】Next stop--Paradise https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723991 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
[History of Haichuan Chemical]--In 2012, the first batch of qualified liquid chlorine products at Hebei Shenghua Chlor-Alkali Base was filled and shipped. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724011 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
[Talk about Haichuan Safety] Hidden dangers around you - core changes and graphic interpretation of "Major Fire Hazard Determination Rules" (GB 35181-2025) https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724064 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
[Frequently Asked Questions in Haichuan Pipeline Design] Summary post, pictures and texts are being updated, welcome to participate in the discussion https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
[Haichuan Tushuo Chemical Equipment] Thermal power plant power station auxiliary system-wet electrostatic precipitator https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724151 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
[Talk about Haichuan Safety] Hidden dangers around us - Is it too high a requirement to install a combustible gas detector without a rain cover when it is installed in the open air? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724304 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))