Thread Content
Wanbanda signs three BOO project cooperation agreements for the 2000,000 tons/year coal-based clean fuel project in Bijie, Guizhou / Author/Source: Yahuah Coal Chemicals / Date: 2018-01-29 / Views: 290,000. Wanbanda announced on the evening of January 28 that it had signed three BOO project cooperation agreements with partners including Guizhou Yufu for the aforementioned coal-based clean fuel project in Bijie. The aim is to jointly invest in the construction of water treatment systems, solid waste treatment systems, and thermal power facilities for this project, with a total investment of around 4.8 billion yuan. 1. Project Name: Water treatment system for the 2 million tons/year coal-based clean fuel project in Bijie, Guizhou ; Solid waste treatment system for the 2 million tons per year coal-based clean fuel project in Bijie, Guizhou ; Thermal power unit of the 2 million tons per year coal-based clean fuel project in Bijie, Guizhou. 2. Project scale: The estimated total investment for the water treatment system is around 1.6 billion RMB ; The estimated total investment for the solid waste treatment system is around 600 million RMB ; The total estimated investment for the thermoelectric plant is around 2.6 billion RMB. 3. Cooperation model: It is planned to jointly invest in the construction with Guizhou Yufu and Guizhou Electric Power Institute by establishing a joint venture company, which will be responsible for the investment, construction, and operation management of the project. The specific equity ratios of the joint venture are as follows: http://img.yf116.cn/image/img/20180129/1528425572258.jpg 4. The water treatment system joint venture is responsible for providing qualified desalinated water and recycled water for the Bijie project, as well as treating the wastewater generated during the operation of the project so that it meets environmental regulations ; The solid waste treatment system joint venture is responsible for dealing with the solid waste generated by the Bijie project ; The thermoelectric plant joint venture is responsible for supplying qualified steam and electricity to the Bijie project. It is expected that the three aforementioned BOO projects will commence construction in the second half of 2018, with a construction period of approximately four years. 5. Franchising period of the joint venture: 20 years, starting from the date when the water treatment system and solid waste treatment system begin to operate officially, and the cogeneration system starts to supply steam officially. Overview of the 2 million tons/year coal-based clean fuel project in Bijie, Guizhou: (1) Project name: 2 million tons/year coal-based clean fuel project in Bijie, Guizhou; (2) Developer: Guizhou Yufu Energy Development Co., Ltd.; (3) Nature of construction: New construction; (4) Location: Shabao Town, Nayong County, Bijie City, Guizhou Province; (5) Land area: The construction project requires 395.69 hm2 of land, of which 392.70 hm2 is designated for the project itself. The wastewater treatment plant for the facility is located within the designated area and covers approximately 2.99 hm2. (6) Total project scale: The production capacity for clean fuels derived from coal in this project is 2 million tons per year. The main products are 1.3416 million tons per year of gasoline, 700,200 tons per year of diesel, 111,600 tons per year of liquefied petroleum gas, and 116,200 tons per year of liquefied natural gas. The by-products include solid sulfur, sulfuric acid, light alcohols, and heavy alcohols. The project also includes relevant utility systems, auxiliary facilities, and environmental protection measures. (7) Operating hours: 8,000 hours per year. (8) Project investment: The total investment in the project amounts to 355,023.4 million yuan, of which the investment in construction is approximately 324,687.3 million yuan, while the investment in environmental protection facilities is 3,575,022.5 yuan (excluding costs related to project evaluation). Environmental protection investments account for about 11.07% of the total construction investment.
The Guizhou Yufu coal-to-fuel project is quite large in scale; with a capacity of 2 million tons, it must involve several production lines, resulting in a very substantial total output. Shenhua’s capacity is said to be 2 million tons per line per year – is it possible that they are using the technology developed by Zhongke Synthetic Oil?