The turbine extractor is put into operation

2018-09-07View Original

Thread Content

Why is it necessary to activate the secondary vacuum pump first, and then the primary vacuum pump?
Reply #22018-09-07
Look at the diagram carefully: the waste steam from stage 1 goes to stage 2 and then is extracted. If stage 1 is activated first, there will be no way for the steam to flow out, making it difficult to extract it and potentially leading to pressure buildup
Reply #32018-09-08
It shouldn’t be possible to hold back the pressure; there is a normally open drain valve below the stage 1 cooler. I thought about it yesterday – should we put Stage 1 into use first? In that case, the condensate and some non-condensable gases would return to the surface cooler through the bottom drain valves, which would affect the establishment of vacuum.
Reply #42018-10-05
You’ll understand once you see where the air valve is connected.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.