Thread Content
How should the valves in the water system of the synthesis tower be set for operation before Cat heating and reduction? Answer: (1) Open the drum vent valve ; (2) All valves of the drum pressure control valve are closed ; (3) The isolation valves before and after the feed water control valve on the drum, as well as the bypass and drain valves, are all closed ; (4) Drain valves on the shell side of the steam drum and synthesis tower are closed ; (5) Use a desalinated water pipeline to supply desalinated water to the steam drum ; (6) Close the steam valve leading to the injector.
(1) Open the drum vent valve; (2) All valves of the drum pressure control valve are closed ; (3) The isolation valves before and after the feed water control valve on the drum, as well as the bypass and drain valves, are all closed ; (4) Drain valves on the shell side of the steam drum and synthesis tower closed ; (5) Add deionized water to the steam drum using a temporary water supply line ; (6) Close the steam valve to the injector
(1) Open the drum vent valve; ? (2) All valves of the drum pressure control valve are closed ; ? (3) The isolation valves before and after the feed water control valve on the drum, as well as the bypass and drain valves, are all closed ; ? (4) Drain valves on the shell side of the drum and synthesis tower closed ; ??????????????????????????????????????????????????? (5) Use a temporary water supply line to feed deionized water into the steam drum ; ? (6) Close the steam valve leading to the injector
(1) Open the drum vent valve; (2) All valves of the drum pressure control valve are closed ; (3) The isolation valves before and after the feed water control valve on the drum, as well as the bypass and drain valves, are all closed ; ? (4) Drain valves on the shell side of the drum and synthesis tower closed ; (5) Add deionized water to the steam drum using a temporary water supply line ; (6) Close the steam valve leading to the injector
(1) Open the drum vent valve; ? (2) All valves of the drum pressure control valve are closed ; ? (3) The isolation valves before and after the feed water control valve on the drum, as well as the bypass and drain valves, are all closed ; ? (4) Drain valves on the shell side of the drum and synthesis tower closed ; ??????????????????????????????????????????????????? (5) Use a temporary water supply line to feed deionized water into the steam drum ; ? (6) Close the steam valve leading to the injector
(1) Open the drum vent valve; ? (2) All valves of the drum pressure control valve are closed ; ? (3) The isolation valves before and after the feed water control valve on the drum, as well as the bypass and drain valves, are all closed ; ? (4) Drain valves on the shell side of the drum and synthesis tower closed ; (5) Add deionized water to the steam drum using a temporary water supply line ; ? (6) Close the steam valve leading to the injector
(1) Open the drum vent valve; (2) All valves of the drum pressure control valve are closed ; (3) The isolation valves before and after the feed water control valve on the drum, as well as the bypass and drain valves, are all closed ; (4) Drain valves on the shell side of the steam drum and synthesis tower are closed ; (5) Add deionized water to the steam drum using a temporary water supply line ; (6) Close the steam valve leading to the injector
(1) Open the drum vent valve; (2) All valves of the drum pressure control valve are closed ; (3) The isolation valves before and after the feed water control valve on the drum, as well as the bypass and drain valves, are all closed ; ? (4) Drain valves on the shell side of the drum and synthesis tower closed ; (5) Add deionized water to the steam drum using a temporary water supply line ; (6) Close the steam valve leading to the injector
(1) Open the drum vent valve; (2) All valves of the drum pressure control valve are closed ; (3) The isolation valves before and after the feed water control valve on the drum, as well as the bypass and drain valves, are all closed ; ? (4) Drain valves on the shell side of the drum and synthesis tower closed ; (5) Add deionized water to the steam drum using a temporary water supply line ; (6) Close the steam valve leading to the injector
(1) Open the drum vent valve; (2) All valves of the drum pressure control valve are closed ; (3) The isolation valves before and after the feed water control valve on the drum, as well as the bypass and drain valves, are all closed ; ? (4) Drain valves on the shell side of the drum and synthesis tower closed ; (5) Add deionized water to the steam drum using a temporary water supply line ; (6) Close the steam valve leading to the injector
Answer: (1) Open the drum vent valve; (2) All valves of the drum pressure control valve are closed ; (3) The isolation valves before and after the feed water control valve on the drum, as well as the bypass and drain valves, are all closed ; (4) Drain valves on the shell side of the steam drum and synthesis tower are closed ; (5) Use a desalinated water pipeline to supply desalinated water to the steam drum ; (6) Close the steam valve leading to the injector.