Problems with initial commissioning and purging of the low-temperature methanol washing system

2020-11-26View Original

Thread Content

The facility I work at is currently in the final stages of construction, and I’ve encountered a problem while preparing the operating procedures. In our low-temperature methanol washing system, the main washing liquid used in the absorption tower is semi-poor methanol, while the refining liquid is poor methanol. Both liquid streams are equipped with check valves before entering the tower. I would like to ask fellow experts: since the starting points of these two pipelines are the pumps for poor methanol and semi-poor methanol, are there any other solutions aside from adding bypass lines to the check valves for the initial startup and purging process?
Reply #22020-12-01
1. Check valve with bypass; 2. Add a drain and bleed line behind the check valve ;

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.