HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

With a total investment of 6.935 million yuan, the 500,000-ton green methanol-to-SAF project in Urad Houqi, Zhongke One Carbon has been registered

2026-05-11View Original

Thread Content

Recently, the 500,000-ton green methanol-to-SAF project of Zhongke One Carbon Urad Hou Banner was registered. The project is located in Bayannaoer City-Urad Rear Banner-Urad Rear Banner Industrial Park. The project unit is Zhongke Carbon Energy Technology (Wulatehouqi) Co., Ltd., with a total investment of 6.935 million yuan. Construction scale and content: The overall plan of the project is to build a 500,000-ton liquid sunshine green methanol project, covering hydrogen production, alcohol production, and SAF production. It is planned to build a 156,000 Nm³/h hydrogen production unit, a 180,000 tons/year biomass methanol synthesis unit, a 320,000 tons/year carbon dioxide plus green hydrogen synthesis methanol unit, a 150,000 tons/year methanol-to-sustainable aviation fuel (SAF) unit and other supporting ancillary facilities and equipment. Planned start and end years of construction: 2026/09 to 2029/06 It is understood that on April 17, 2026, Zhongke Carbon’s Keshiketeng Banner wind-solar hydrogen production methanol and SAF integrated project was registered. (View details: Total investment is 7.5 billion yuan! The 500,000 tons of green methanol and 100,000 tons of SAF projects have been registered) The project is located in Chifeng City - Keshiketeng Banner - Darihan Ulasumu Bayandu Humu Gacha, Keshiketeng Banner, Chifeng City, Inner Mongolia Autonomous Region. The project unit is Zhongke Carbon Energy Technology (Chifeng) Co., Ltd., with a total investment of 7.5 million yuan. Construction scale and content: 1. Construct a set of electrolyzed water hydrogen production line, including electrolyzed water hydrogen production equipment, gas-liquid separation equipment, purification and purification equipment, etc., with an annual output of 62,500 tons of green hydrogen ; 2. Build a green methanol synthesis production line, including biomass gasification equipment, combined purification equipment, methanol synthesis equipment, etc., to produce 500,000 tons of green methanol annually. ; 3. Build a SAF synthesis production line with an annual production capacity of 100,000 tons of SAF. Planned start and end years of construction: 2026/05 to 2028/12.
Reply #22026-05-11
[Haichuan Teahouse] Robots started picking tea leaves this year. Will robots be able to pull garlic moss next year? ! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720225 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Reply #32026-05-12
[Haichuan Teahouse] Homemade Chaoshan brine hot pot with homemade brine, https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720278 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Reply #42026-05-12
[Haichuan Teahouse] Homemade Chaoshan brine hot pot with homemade brine, https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720278 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Reply #52026-05-13
[History of Haichuan Chemical] The most complete picture and text introduction---Jinxi Chemical Machinery Factory: The cradle of China's chemical machinery manufacturing https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719589 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Reply #62026-05-13
[Ocean Chemical Valve Management] Series Posts---Managing valves well is the basis for stable operation. Welcome everyone to share and communicate! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719309 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Reply #72026-05-14
[Frequently Asked Questions in Haichuan Pipeline Design] Summary post, pictures and texts are being updated, welcome to participate in the discussion https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Reply #82026-05-16
[Ten years of development of chemical equipment] 3124-2026 Luoyang Technology R&D Center develops "exergy analysis" model technology for atmospheric and vacuum distillation units https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720568 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Reply #92026-05-16
[Ten years of development of chemical equipment] 3124-2026 Luoyang Technology R&D Center develops "exergy analysis" model technology for atmospheric and vacuum distillation units https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720568 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.