Daily Electrical Engineering Question (2018.09.1)

2018-09-01View Original

Thread Content

This post was last edited by sdscj0122 on 2018-9-1 at 13:08. Test questions for the “Safety Work Procedures for Electricity (Substation Specialty)”; true or false questions. Punching holes in floors and structures, or installing lifting pulleys or stacking heavy objects outside designated locations, must be approved by the safety supervision department of the organization.
Reply #22018-09-01
Error: it should be “the relevant technical department” rather than “the safety supervision department””

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.