HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Electrical Technology Daily Question 2018.11.23

2018-11-23View Original

Thread Content

This post was last edited by sdscj0122 on 2018-11-24 at 10:08. Examination Paper on Power Safety Procedures (Substation Specialization): The work permit issuer shall not change the operating wiring configuration of the equipment under maintenance. ( ) Neither party shall change the safety measures without permission; if special circumstances arise that require such changes during work, consent from the other party must be obtained first. Any changes are promptly recorded in the duty log. A: Person in charge of the work B: Work permit issuer C: Dispatcher D: Workshop supervisor Answer: AB

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.