Can the compressor’s power switch for crane operation be installed on the first floor?

2019-07-30View Original

Thread Content

For the same project, the power switches for the cranes in the compression plant were designed by two different design firms; one of these switches is installed on the first floor while the other is on the second floor. In my opinion, for safety reasons, it would be better to install them on the second floor so that power can be cut off to the cranes easily. Is there any mandatory requirement regarding this?
Reply #22020-02-16
It should be installed in a location that is convenient for operation; there are no mandatory requirements. As mentioned in your case, it is more reasonable to install it on the second floor.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.