HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Comprehensive Power Resources 20.19 [Hydropower] List – No attachments

2022-08-17View Original

Thread Content

Electricity Information Encyclopedia 20.19 [Water and Electricity] list has no attachments for everyone’s convenience.* Starting from today, the complete list of electricity generation information by category 20.19 [Hydropower] has no attachments. It contains books, manuals, courseware, papers, and information for everyone to search according to the picture. Except for books and papers, most of them have been uploaded to the forum. Please search the forum and contact me. I am in urgent need of a large amount of information. Please join the information and standard sharing mutual aid group address.: https://bbs.hcbbs.com/forum.php?mod=group&fid=890 Group number; chat here, discuss technology, and share information with each other │ ├─1. Hydropower station books │ 2006 newly compiled practical encyclopedia of water conservancy and hydropower engineering construction │ Encyclopedia of Modern Science in China Water Conservancy Engineering Water Conservancy and Hydropower Engineering 2004) │ Small and medium-sized water conservancy and hydropower engineering geology (second edition) │ Small and medium-sized hydropower station construction quality control guide │ Small and medium-sized hydropower station template project │ Small and medium-sized hydropower station electrical design manual │ Practical technology for manufacturing and testing of metal structures and electromechanical equipment of small and medium-sized hydropower stations │ Small and medium-sized power station electrical equipment testing - for small and medium-sized thermal power stations, small and medium-sized hydropower stations, and transformer and distribution stations │ National first-class construction engineer qualification examination book (2nd edition) Water conservancy and hydropower engineering management and practice │ National First-Class Construction Engineer Qualification Examination Tutorial (2009 Edition) Water Conservancy and Hydropower Project Management and Practical Review * Question Collection │ National Second-level Construction Engineer Qualification Examination Book (3rd Edition) Water Conservancy and Hydropower Project Management and Practice │ National Hydropower Plant Technical Transformation Study * Proceedings of exchange seminars │ International water conservancy and hydropower contracting project management │ Underground power station plant design │ Foundation and hydropower materials 2014 │ Practical hydropower installation and maintenance manual │ Small water conservancy and hydropower project design atlas concrete dam volume │ Small hydropower station (second edition) - factory building │ Small hydropower station (second edition) - hydraulic construction │ small hydropower station (university textbook) │ Optimized operation and management of small hydropower stations │ Small hydropower station electromechanical design manual 521 │ Small hydropower station electromechanical design manual hydraulic machinery │ Small hydropower station electromechanical design manual electrical primary │ Small hydropower station electromechanical design manual electrical secondary │ Small hydropower station electromechanical design manual metal structure │ Small hydropower station electrical part design guide │ Small hydropower station comprehensive economic evaluation │ A concise manual of small hydropower and water energy design│ Geomechanics and foundation foundation question bank and solution China Water Conservancy and Hydropower Press 2004 │ Engineering machinery and equipment technical manual (China Hydropower Bureau 14) │ Construction project supervisor's guide series 07 Water conservancy and hydropower project supervisor's guide │ How to read the new standard hydropower station electrical diagram │ Pumped storage power station and conventional hydropower station water diversion building design │ New practical manual for the preparation of tender documents for water conservancy and hydropower project construction │ New practical manual for the preparation and standardization management of water conservancy and hydropower project completion documents │ Construction Organization Design 2015 Annual Proceedings 2016 Edition │ The latest practical water and electricity installation manual │ The latest industry standards for survey, design and construction acceptance of water conservancy and hydropower projects, * * Standard and mandatory provisions │ The latest water conservancy and hydropower project contract text preparation and signing standard management and breach of contract liability handling practical manual │ The latest water conservancy and hydropower project construction organization design and construction new technology specification implementation manual │ The latest water conservancy and hydropower project construction quality acceptance standards and specifications * * Mandatory provisions │ The latest water conservancy and hydropower project quality control and common disease prevention implementation manual │ The latest water conservancy and hydropower project cost, valuation and bill of quantity preparation and bidding quotation practical manual │ The latest water conservancy and hydroelectric power unit installation project construction technology and technical standards practical manual │ The latest water conservancy and hydropower pile foundation engineering construction technology and technical standards practical manual │ The latest water conservancy and hydropower anti-seepage project construction technology and technical standards practical manual │ The latest implementation manual for bill of quantities pricing specifications for hydropower construction projects│ The latest practical manual for new technologies in the installation, operation and maintenance of hydraulic turbine generators and hydropower station-type water pumps│ Water conservancy and hydropower karst engineering geology│ Water conservancy and hydropower engineering CAD technology│ Water conservancy and hydropower engineering major graduation design guide│ Water conservancy and hydropower engineering drawing manual Yangtze River Survey Planning Design Research Co., Ltd. 2014 edition│ Practical manual on new technologies for water conservancy and hydropower engineering survey, design and construction│ Water conservancy and hydropower engineering geology handbook│ Water conservancy and hydropower engineering geological surveying and mapping procedures and engineering geological survey, testing and monitoring standard manuals│ Water conservancy and hydropower engineering geology treatise collection│ Water conservancy and hydropower engineering geological drilling│ Water conservancy and hydropower engineering construction safety production mandatory standards and on-site construction safety operating procedures practical book│ Water conservancy and hydropower engineering construction supervision introduction│ Practical manual for construction engineers and project managers of water conservancy and hydropower projects│ Guide to the standard application of safety technical regulations for water conservancy and hydropower project construction│ Practical handbook for water conservancy and hydropower project construction embankment project construction│ Practical handbook for water conservancy and hydropower project construction concrete engineering construction│ Practical handbook for water conservancy and hydropower project construction metal structure fabrication and installation volume one│ Practical manual for water conservancy and hydropower project construction construction metal structure fabrication and installation volume two│ Practical manual for water conservancy and hydropower project construction construction steel bar engineering construction│ Water Conservancy and Hydropower Engineering Construction Manual Volume 1 Foundation and Foundation Engineering │ Water Conservancy and Hydropower Engineering Construction Manual Volume 2 Earthwork Engineering │ Water Conservancy and Hydropower Engineering Construction Manual Volume 3 Concrete Engineering │ Water Conservancy and Hydropower Engineering Construction Manual Volume 4 Metal Structure Fabrication and Mechanical and Electrical Installation Engineering │ Water Conservancy and Hydropower Engineering Construction Manual. Volume 5. Construction Diversion, Interception and Flood Control │ Water Conservancy and Hydropower Engineering Construction Technology (Second Edition) │ Water Conservancy and Hydropower Project Construction Organization Design Manual Volume 1 Construction Planning │ Water Conservancy and Hydropower Project Construction Organization Design Manual Volume 3 Construction Technology │ Water Conservancy and Hydropower Project Construction Organization Design Manual Volume 2 Construction Technology │ Water Conservancy and Hydropower Project Construction Organization Design Manual Volume 5 Structural Design │ Water Conservancy and Hydropower Project Construction Organization Design Manual Volume 4 Auxiliary Enterprises │ Water Conservancy and Hydropower Project Construction Organization Design Guide │ Water Conservancy and Hydropower Project Construction Quality Acceptance Assessment Form Application Manual │ Quick reference manual for water conservancy and hydropower project construction standards and quality acceptance specifications and table comparisons │ Water conservancy and hydropower project standard construction bidding prequalification documents (2009 edition) │ Water conservancy and hydropower project sedimentation tank design │ Water conservancy and hydropower project measurement │ Water conservancy and hydropower project measurement and construction setting-out in one book │ Water conservancy and hydropower project environmental protection design │ Water conservancy and hydropower project environmental impact assessment │ Water Conservancy and Hydropower Engineering Management and Practice│ Compilation and Analysis of Water Conservancy and Hydropower Project Management and Practice Examination Questions 2015 Edition│ Water Conservancy and Hydropower Engineering Design (2003) │ Complete Book on New Technologies for Water Conservancy and Hydropower Engineering Design and Construction│ Water Conservancy and Hydropower Engineering Design Flood Calculation Manual│ Key Points of Quality Control of Water Conservancy and Hydropower Projects│ Complete Book on Water Conservancy and Hydropower Engineering Quality Monitoring and Common Disease Prevention and Control│ Practical manual on construction technology and technical standards for anti-seepage projects in water conservancy and hydropower projects │ Construction diversion in water conservancy and hydropower construction │ Research and practice of ecological environment protection in water conservancy and hydropower development projects │ Manual of standards and procedures for new technologies in water conservancy and hydropower │ Water conservancy and hydropower construction engineer's manual │ Construction technology of water conservancy and hydropower hubs │ Water conservancy and hydropower 100 forums │ Hydraulic Design Manual Volume 7 Hydropower Station Buildings │ Theory and practice of EPC general contracting project management of hydropower projects 2011 edition │ Temperature crack control and case analysis of mass concrete in hydropower projects 2013 │ Safety monitoring and management of hydropower projects │ Sample text of bidding and contract documents for hydropower project construction (volume 1 and 2) │ Theory and practice of several technical issues in hydropower projects │ Basics of hydropower project design │ Regulations on calculation of quantity for hydropower project design 2010 edition │ Hydropower development and ecological environment management │ Dynamic alarm and fault diagnosis of hydropower unit operating characteristics │ Hydropower station │ Hydropower station (third edition) │ Hydropower station (third edition) │ Hydropower station - 2005 │ Hydropower station power equipment 265 │ Hydropower station power equipment │ Computer-aided design of hydropower station power equipment │ Hydropower station plant design - │ Hydropower station pressure pipes, branch pipes, volutes │ Hydropower station water diversion building volume diversion tunnels and surge chambers │ Hydropower station microcomputer monitoring and protection │ Hydropower station electromechanical equipment operation and maintenance technical questions and answers │ Hydropower station electromechanical design manual commonly used materials 300 │ Hydropower station electromechanical design manual commonly used materials │ Hydropower station electromechanical design manual hydraulic machinery part 1 400 │ Hydropower station electromechanical design manual hydraulic machinery│ Hydropower station electromechanical design manual electrical primary│ Hydropower station electromechanical design manual electrical secondary│ Hydropower station electromechanical design manual heating ventilation and air conditioning│ Hydropower station electromechanical design manual metal structure (1) 615│ Hydropower station electromechanical design manual metal structure (1)│ Hydropower station electromechanical design manual metal structure (2) 677│ Hydropower Station Mechanical and Electrical Design Manual Metal Structure (2) │ Hydropower Station Mechanical and Electrical Design Manual - Hydraulic Machinery Part 2 323 │ Hydropower Station Unit Control Computer Simulation │ Hydropower Station Unit Equipment and Operation │ Introduction to Hydropower Station (Second Edition) │ Hydropower Station Reservoir Scheduling and Operation Management │ Hydropower Station Reservoir Stochastic Optimization Method │ Hydropower Station Testing Technology │ Electrical secondary part of hydropower station│ Computer-aided design of electrical part of hydropower station│ Economic operation of hydropower station│ Hydropower station relay protection│ Hydropower station computer control│ Hydropower station computer monitoring technology and application│ Hydropower station water inlet design│ Hydropower automatic device maintenance│ Hydropower generator mechanical maintenance (11-040) Occupational Standards·Test Bank Electric Power Engineering Hydropower Machinery Operation and Maintenance Major China Electric Power Press│ Chinese-English Dictionary of Water Conservancy and Hydropower Technology│ Extra Large Bulb Tubular Hydropower Station Engineering Practice [ 2011 edition │ Modern water conservancy and hydropower engineering blasting │ Modern water conservancy and hydropower engineering blasting new technologies and on-site safety management and mandatory standards and practices practice book │ Current water conservancy and hydropower engineering new specifications (2002-2003) annual implementation manual │ Current water conservancy and hydropower project construction and acceptance specifications implementation manual │ Current water conservancy and hydropower engineering specifications practical book │ Motor and drag basics │ Pipeline Stress Analysis and Calculation 1982 │ Selected Papers on Western Water Conservancy and Hydropower Development and Karst Hydrogeology (2004) │ Tubular Hydropower Stations │ Flood Control Engineering │ Technical Progress Papers on Concrete Face Rockfill Dams in Alpine Areas 2013 │ Higher School Textbook Hydropower Stations │ Higher School Textbooks Hydropower Station Electrical Part (Second Edition) │ College textbook Hydropower Station Automation │ Collection of Papers on the Construction of the Yellow River Hydropower Aluminum Joint Venture Project 2012 Edition │ ├─2. Hydropower Station Courseware │ │ 12 - Calculation of Water Hammer and Adjustment Guarantee of Hydropower Station.ppt │ │ 15 - Hydropower Station Factory Building (2).ppt │ │ 19 - Operation Management of Small and Medium-sized Hydropower Stations.ppt │ │ Reservoir Bank Slope Geological Hazard Investigation and Assessment Technology (Water Conservancy and Hydropower Engineering) (Hu Xiewen).ppt │ │ Landslides and Prevention in my country’s Water Conservancy and Hydropower Construction (Chen Zuyu).ppt │ │ Hydropower and Port Geological Hazard Assessment.ppt │ │ Hydropower Station PPT1 Introduction 75.ppt │ │ Hydropower station PPT12 - water hammer and adjustment guarantee calculation of hydropower station 85.ppt │ │ Hydropower station PPT13 - pressure regulating room 79.ppt │ │ Hydropower Station PPT14 - Hydropower Station Factory Building (1) 85.ppt │ │ Hydropower Station PPT15 - Hydropower Station Factory Building (2) 62.ppt │ │ Hydropower Station PPT16 - Hydropower Station Factory Building Structural Analysis 66.ppt │ │ Hydropower station PPT17 - other types of factory buildings 46.ppt │ │ Hydropower Station PPT18 - Hydropower Construction and Ecology 71.ppt │ │ Hydropower Station PPT19 - Operation and Management of Small and Medium-sized Hydropower Stations 62.ppt │ │ Hydropower Station PPT2 - Overview of Water Turbine 85.ppt │ │ Hydropower station PPT5 - turbine selection 54.ppt │ │ Hydropower station PPT6 - speed regulating equipment of hydraulic turbine 25.ppt │ │ Hydropower station PPT7 - water inlet structure of hydropower station 71.ppt │ │ Hydropower station PPT8 - water diversion structure of hydropower station 29.ppt │ │ Calculation of water hammer and regulation guarantee of hydropower station.ppt │ │ │ ├─Hydropower Engineering Geology and Rock Mass Mechanics Courseware.ppt │ │ Chapter 1 Physical Properties of Rock.ppt │ │ Chapter 2 Permeability Characteristics of Rock Mass.ppt │ │ Chapter 3 Strength of Rock.ppt │ │ Chapter 4 Deformation of Rock.ppt │ │ Chapter 5 Natural Stress of Rock Mass and Its Measurement.ppt │ │ Chapter 6 Rock Pressure and Surrounding Rock Stability Analysis.ppt │ │ Chapter 7 Surrounding Rock Stress and Stability of Pressure Tunnel.ppt │ │ Chapter 8 Dam Foundation Stability Analysis.ppt │ │ Chapter 9 Rock Slope Stability Analysis.ppt │ │ │ └─Hydropower station PPT │ 10——Pressure pipe (2).ppt │ 11——Pressure pipe (3).ppt │ 12——Water hammer and adjustment guarantee calculation of hydropower station.ppt │ 13——Surge room.ppt │ 14——Hydropower station factory building (1).ppt │ 15——Hydropower station factory building (2).ppt │ 16——Structure analysis of hydropower station buildings.ppt │ 17——Other types of factories.ppt │ 18——Hydropower construction and ecology.ppt │ 19——Operation management of small and medium-sized hydropower stations.ppt │ 1——Introduction.ppt │ 2——Overview of hydraulic turbine.ppt │ 3——Working principle of hydraulic turbine.ppt │ 4——Similar principles and characteristic curves of hydraulic turbines.ppt │ 5——Turbine selection.ppt │ 6——Speed control equipment of hydraulic turbine.ppt │ 7——Water inlet building of hydropower station.ppt │ 8——Diversion building of hydropower station.ppt │ 9——Pressure pipe (1).ppt │ ├─3. General information of hydropower station │ │ XX Hydropower Station Diversion Tunnel Construction Organizational Measures.doc │ │ Level 1 Hydropower Station Left Bank Excavation Construction Organizational Design Plan.doc │ │ Zhongyi Hydropower Station Construction Organizational Design.doc │ │ Pianqiao Hydropower Station Diversion Tunnel Engineering Construction Organizational Design Plan (doc).doc │ │ Guangzhao Hydropower Station Factory Building Structure Engineering Construction Organizational Design Plan.doc │ │ Sichuan Dadu River Luding Hydropower Station 318 National Roadbed Earthwork Implementation Construction Organization Design.doc │ │ Underground Powerhouse Construction Group Design of a Hydropower Station in Sichuan Province.doc │ │ Construction Organization Design of the Underground Powerhouse (Rock Anchor Beam) of a Hydropower Station in Sichuan Province.doc │ │ Large and Medium-sized Hydropower Station Design Report Template (Construction Organization Design Plan).doc │ │ Dabu Hydropower Station Construction Machinery Equipment List, Construction Machinery Access Plan.xls │ │ Dabu Hydropower Station Construction Progress Bar Chart, Strength Column Chart, Labor Schedule.xls │ │ Small Hydropower Station Forebay Construction Organization Design Plan (Three Standards).doc │ │ Xiaowan Hydropower Station Left Bank Civil Construction Organization Design Plan.doc │ │ Technical communication master (32 hydropower parts).doc │ │ Songyang County Anmin Ersong Hydropower Station Construction Organization Design.doc │ │ Songyang County Anmin Ersong Hydropower Station Construction Organization Design Plan.doc │ │ A County A Hydropower Station Construction Organization Design Plan.doc │ │ A Water Conservancy and Hydropower Station Project Supervision Tender Sample_secret.doc │ │ A certain hydropower station factory building calculation sheet.doc │ │ A certain hydropower station expansion project civil engineering and mechanical and electrical equipment and metal structure equipment installation and construction organization design.doc │ │ A certain hydropower station barrage project construction organization design.doc │ │ A certain hydropower station Yellow River Bridge construction organization design plan.doc │ │ Construction organization design of a first-level hydropower station on a certain river in Shuicheng County t.doc │ │ Hydropower Construction Project Quality Supervision Outline 2006 Edition..doc │ │ Hydropower Construction Plan │ │ Hydropower Station Dam and Tunnel Construction Organization Design Plan.doc │ │ Hydropower Station Diversion Tunnel Project_Implementation construction organization design.doc │ │ Hydropower station diversion tunnel grouting construction organization design.doc │ │ Hydropower station expansion project construction organization design plan.doc │ │ Hydropower station construction organization design plan.doc │ │ Jiangzui Hydropower Station construction organization design plan.doc │ │ Taishun County secondary hydropower station barrage project construction organization design in Zhejiang Province.doc │ │ Taishun County Secondary Hydropower Station Barrage Project Construction Organization Design Plan in Zhejiang Province.doc │ │ Dukouba Hydropower Station Dam Civil Engineering Construction Organization Design.doc │ │ Dukouba Hydropower Station Dam Junction Civil Engineering Construction Organization Design (formal).doc │ │ Dukouba Hydropower Station Dam Junction Civil Engineering Construction Organization Design Plan (formal).doc │ │ Construction organization design of a hydropower station in Gannan Tibetan Autonomous Prefecture, Gansu Province.doc │ │ Baishui River Level III Hydropower Station Project Construction Organization Design Plan.doc │ │ Jinlongtan Hydropower Station Diversion Tunnel Construction Branch Tunnel Construction Organization Design.doc │ │ Jinlongtan Hydropower Station Diversion Tunnel Construction Organization Design.doc │ │ Jinping Level I Hydropower Station Hydraulic Tunnel Construction Organization Design.doc │ │ Jinping I Hydropower Station Hydraulic Tunnel Construction Organization Design Plan.doc │ │ Jinping Hydropower Station Jiulong River Mouth ~ Jinping I Dam Area Auxiliary Road Reconstruction Project Construction Organization Design.doc │ │ Jinping Hydropower Station Auxiliary Tunnel Construction Water Inrush Emergency Plan.doc │ │ Yellow River Jishixia Hydropower Station Concrete Mixing System Engineering Construction Organization Design Plan.doc │ │ │ ├─Winning bidding plan for the installation of a certain hydropower station project │ │ Business part_secret.doc │ │ Suojie Power Station Budget.xls │ │ Technical part_secret.doc │ │ Construction layout drawing.dwg │ │ Overall construction schedule_secret.doc │ │ Table of Contents_secret.doc │ │ Competence and credibility section_secret.doc │ │ Installation material list.xls │ │ │ ├─ Construction organization design drawings of a hydropower station sand and gravel processing system │ │ 240 General construction layout.dwg │ │ 244 Construction progress network diagram (4-3).dwg │ │ 245 Network progress plan (4-4).dwg │ │ 246 Stockyard roofing construction plan.dwg │ │ 247 Stockyard roofing drilling and blasting design drawing.dwg │ │ 248 Stockyard slide well construction plan.dwg │ │ 249 Transportation tunnel excavation construction plan 1.dwg │ │ 250 Transportation Tunnel Excavation Construction Plan 2.dwg │ │ 251 Slide Shaft Bottom Ore Storage Chamber Construction Plan.dwg │ │ 252 Safety Channel, Ventilation Tunnel, Inspection Tunnel Excavation Construction Plan.dwg │ │ 253 Slide Shaft and Underground Cavern Support Construction Plan.dwg │ │ 254 Slide shaft and underground lining concrete construction plan.dwg │ │ 256 Radial flow sedimentation tank foundation excavation drawing.dwg │ │ 257 Longtangou living camp floor plan.dwg │ │ 258 Construction auxiliary facilities layout plan.dwg │ │ 259-260 Mixing station layout.dwg │ │ 262 slide shaft construction branch tunnel layout diagram.dwg │ │ Material yard, slide shaft, and level tunnel network diagram.dwg │ │ Concrete mixing station process layout diagram.jpg │ │ │ ├─Full set of instructions and examples for filling out the construction quality assessment form for water conservancy and hydropower projects│ │ ├─Part 1 Construction Quality Assessment Form for Engineering Projects│ │ │ Table 01 Appearance Quality Assessment Form for Hydraulic Buildings. Housing construction and installation project visual quality evaluation form.xlt │ │ │ Table 02 Housing construction and installation project visual quality evaluation form filling instructions.doc │ │ │ Table 02 Housing construction and installation project visual quality evaluation form (example form).xls │ │ │ Table 03 Divisional project construction quality evaluation form.xlt │ │ │ Table 03 Instructions for filling out the construction quality evaluation form for branch projects.doc │ │ │ Table 03 Construction quality evaluation form for division projects (example form).xls │ │ │ Table 04 Instructions for filling out the construction quality inspection data for unit projects.xlt │ │ │ Table 04 Instructions for filling out the construction quality inspection data for unit projects.doc │ │ │ Table 04 Unit Project Construction Quality Inspection Data Verification Form (Example Form).xls │ │ │ Table 05 Unit Project Construction Quality Assessment Form.xlt │ │ │ Table 05 Unit Project Construction Quality Assessment Form Filling Instructions.doc │ │ │ Table 05 Unit Project Construction Quality Assessment Form (Example Form).xls │ │ │ Table 06 Engineering Project Construction Quality Assessment Form. │ │ Table 6.1 Main transformer installation unit project quality evaluation form. Self-contained oil-filled cable line installation unit project quality evaluation form. Factory area feeder line installation unit project quality assessment form. Oil circuit breaker installation unit project quality evaluation form.xlt │ │ │ Table 6.2 Oil circuit breaker installation unit project quality evaluation form filling instructions.doc │ │ │ Table 6.2 Oil circuit breaker installation unit project quality evaluation form (example table).xls │ │ │ Table 6.3 Air circuit breaker installation unit project quality evaluation form.xlt │ │ │ Table 6.3 Instructions for filling out the air circuit breaker installation unit engineering quality evaluation form.doc │ │ │ Table 6.3 Air circuit breaker installation unit engineering quality evaluation form (example form).xls │ │ │ Table 6.4 Sulfur hexafluoride circuit breaker installation unit engineering quality evaluation form.xlt │ │ │ Table 6.4 Instructions for filling out the engineering quality assessment form for sulfur hexafluoride circuit breaker installation unit.doc │ │ │ Table 6.4 Engineering quality assessment form for sulfur hexafluoride circuit breaker installation unit (example form).xls │ │ │ Table 6.5 Engineering quality assessment form for sulfur hexafluoride combined electrical installation unit.xlt │ │ │ Table 6.5 Instructions for filling out the engineering quality assessment form for sulfur hexafluoride combined electrical installation units.doc │ │ │ Table 6.5 Engineering quality assessment form for sulfur hexafluoride combined electrical installation units (example form).xls │ │ │ Table 6.6 Engineering quality assessment form for isolating switch installation units.xlt │ │ │ Table 6.6 Instructions for filling out the engineering quality assessment form for isolating switch installation units.doc │ │ │ Table 6.6 Isolating switch installation unit project quality evaluation form (example table). Oil-immersed transformer installation unit engineering quality evaluation form (Example Table 1).xls │ │ │ Table 6.7 Oil-immersed transformer installation unit engineering quality evaluation form (Example Table 2).xls │ │ │ Table 6.8 Outdoor lightning arrester installation unit engineering quality evaluation form.xlt │ │ │ Table 6.8 Instructions for filling out the engineering quality assessment form for outdoor arrester installation units.doc │ │ │ Table 6.8 Engineering quality assessment form for outdoor arrester installation units (example form).xls │ │ │ Table 6.9 Engineering quality assessment form for soft busbar device units.xlt │ │ │ Table 6.9 Instructions for filling out the engineering quality assessment form for soft busbar device units.doc │ │ │ Table 6.9 Soft busbar device unit project quality evaluation form (example table).xls │ │ │ │ │ ├─Part 3 metal structure and hoist installation project unit project quality evaluation table │ │ │ Table 2.1 Pressure steel pipe production unit project quality evaluation table.xlt │ │ │ Table 2.1 Instructions for filling out the project quality evaluation form for the pressure steel pipe production unit.doc │ │ │ Table 2.1 Project quality evaluation form for the pressure steel pipe production unit (example table).xls │ │ │ Table 2.10 Project quality evaluation form for the herringbone gate embedded parts installation unit.xlt │ │ │ Table 2.10 Instructions for filling out the engineering quality evaluation form for the embedded parts installation unit of the herringbone gate.doc │ │ │ Table 2.10 Engineering quality evaluation form for the embedded parts installation unit of the herringbone gate (example table).xls │ │ │ Table 2.10-1 Quality evaluation form for the installation of the bottom pivot device of the embedded parts of the herringbone gate.xlt │ │ │ Table 2.10-1 Instructions for filling out the quality assessment form for the installation of the bottom pivot device of the embedded parts of the herringbone gate.doc │ │ │ Table 2.10-1 Quality evaluation form for the installation of the bottom pivot device of the embedded part of the herringbone gate (example table). Table 2.10-2 Instructions for filling out the quality evaluation form for the installation of the pivot device and pillow seat for the embedded parts of the herringbone gate.doc │ │ │ Table 2.10-2 Quality evaluation form for the installation of the pivot device and pillow seat for the embedded parts of the herringbone gate (example table).xls │ │ │ Table 2.11 Quality evaluation form for the installation unit of the herringbone gate door body. │ Table 2.11 Instructions for filling out the engineering quality evaluation form for the installation unit of the herringbone gate body.doc │ │ │ Table 2.11 The engineering quality evaluation form for the installation unit of the herringbone gate body (example table). Table 2.11-1 Instructions for filling out the quality evaluation form for the installation of the top and bottom pivot axes of the herringbone gate body.doc │ │ │ Table 2.11-1 Quality evaluation form for the installation of the top and bottom pivot axes of the herringbone gate body (example table).xls │ │ │ Table 2.11-2 Quality evaluation form for the installation of water-stop rubber on the herringbone gate body.xlt │ │ │ Table 2.11-2 Instructions for filling out the quality assessment form for the installation of water-stop rubber on the door body of the herringbone gate.doc │ │ │ Table 2.11-2 Quality assessment form for the installation of water-stop rubber on the door body of the herringbone gate (example table). │ Table 2.12 Instructions for filling out the project quality assessment form for the movable waste rack installation unit.doc │ │ │ Table 2.12 Project quality assessment form for the movable waste rack installation unit (example).xls │ │ │ Table 2.12-1 Installation quality assessment form for the movable waste rack embedded parts.xlt │ │ │ Table 2.12-1 Instructions for filling out the quality assessment form for the installation of embedded parts of the movable waste rack.doc │ │ │ Table 2.12-1 Quality assessment form for the installation of embedded parts of the movable waste rack (example table).xls │ │ │ Table 2.12-2 Quality assessment form for the distance between the embedded parts at the opening of the movable waste rack.xlt │ │ │ Table 2.12-2 Instructions for filling out the quality assessment form for the distance between the embedded parts at the opening of the movable waste barrier.doc │ │ │ Table 2.12-2 Quality assessment form for the distance between the embedded parts at the opening of the movable waste barrier (example table).xls │ │ │ Table 2.12-3 Quality assessment form for the installation of the movable waste barrier body. Table 2.12-3 Instructions for filling out the quality assessment form for the installation of the movable pollution barrier body.doc │ │ │ Table 2.12-3 Quality assessment form for the installation of the movable pollution barrier body (example table).xls │ │ │ Table 2.13 Quality assessment form for the hoisting and closing machinery track installation unit project.xlt │ │ │ Table 2.13 Instructions for filling out the engineering quality assessment form for the hoisting machinery track installation unit.doc │ │ │ Table 2.13 Engineering quality assessment form for the hoisting machinery track installation unit (example form).xls │ │ │ Table 2.14 Engineering quality assessment form for the installation unit of the bridge hoist (or crane).xlt │ │ │ Table 2.14 Instructions for filling out the engineering quality assessment form for the installation unit of bridge hoist (or crane).doc │ │ │ Table 2.14 Quality assessment form for engineering quality of the installation unit of bridge hoist (or crane) (example form).xls │ │ │ Table 2.14-1 Quality assessment form for brake installation.xlt │ │ │ Table 2.14-1 Instructions for filling out the brake installation quality evaluation form.doc │ │ │ Table 2.14-1 Brake installation quality evaluation form (example form).xls │ │ │ Table 2.14-2 Coupling installation quality evaluation form.xlt │ │ │ Table 2.14-2 Instructions for filling out the coupling installation quality evaluation form.doc │ │ │ Table 2.14-2 Coupling installation quality evaluation table (example table).xls │ │ │ Table 2.14-3 Coaxiality of the two shafts of elastic ring pin coupling and end face gap between couplings quality evaluation table.xlt │ │ │ Table 2.14-3 Instructions for filling out the quality evaluation form for the coaxiality of the two shafts of the elastic ring pin coupling and the end gap between the couplings.doc │ │ │ Table 2.14-3 Quality evaluation table for the coaxiality of the two shafts of the elastic ring pin coupling and the end gap between the couplings (example table).xls │ │ │ Table 2.14-4 Bridge and trolley traveling mechanism installation quality assessment form. Car traveling mechanism installation quality evaluation form.xlt │ │ │ Table 2.14-5 Car traveling mechanism installation quality evaluation form filling instructions.doc │ │ │ Table 2.14-5 Car traveling mechanism installation quality evaluation form (example).xls │ │ │ Table 2.14-6 Bridge (gate) hoist (crane) trial operation quality evaluation form. │ │ Table 2.15 Project quality evaluation form for the installation unit of the gantry hoist. Table 2.15-1 Door-type hoist door leg installation quality evaluation form. Fixed winch hoist installation unit project quality assessment form. Fixed winch hoist center, elevation and horizontal installation quality evaluation form. │ Table 2.16-2 Fixed winch hoist trial operation quality evaluation form. Table 2.17 Screw hoist installation unit project quality evaluation form. Screw hoist center, elevation, level and screw plumb quality evaluation form. Screw hoist center, elevation, level and screw plumb quality assessment form (example form).xls │ │ │ Table 2.17-2 Screw hoist trial operation quality assessment form.xlt │ │ │ Table 2.17-2 Screw hoist trial operation quality assessment form filling instructions.doc │ │ │ Table 2.17-2 Screw hoist trial operation quality assessment form (example form).xls │ │ │ Table 2.18 Hydraulic hoist installation unit engineering quality assessment form.xlt │ │ │ Table 2.18 Hydraulic hoist installation unit engineering quality assessment form filling instructions.doc │ │ │ Table 2.18 Hydraulic hoist installation unit engineering quality assessment form (example form).xls │ │ │ Table 2.18-1 Hydraulic hoist frame installation and piston rod plumbness quality assessment form.xlt │ │ │ Table 2.18-1 Hydraulic hoist frame installation and piston rod plumbness quality assessment form filling instructions.doc │ │ │ Table 2.18-1 Hydraulic hoist frame installation and piston rod plumb quality evaluation table (example table).xls │ │ │ Table 2.18-2 Hydraulic hoist frame steel beam and thrust bearing installation quality evaluation table.xlt │ │ │ Table 2.18-2 Instructions for filling out the installation quality assessment form for the frame steel beam and thrust support of the hydraulic hoist.doc │ │ │ Table 2.18-2 Quality assessment form for the installation of the steel beam and thrust support of the hydraulic hoist frame (example table). │ │ Table 2.18-3 Instructions for filling out the quality assessment form for the installation of oil barrels, oil storage tanks and pipelines for hydraulic hoists.doc │ │ │ Table 2.18-3 Quality assessment form for the installation of oil barrels, oil storage tanks and pipelines for hydraulic hoists (example form).xls │ │ │ Table 2.18-4 Hydraulic hoist opening and closing test and hydraulic test evaluation form. Pressure Steel Pipe Expansion Joint Manufacturing Unit Engineering Quality Assessment Form. Pressure steel pipe branch pipe manufacturing unit engineering quality evaluation form. Pressure steel pipe buried pipe installation unit project quality evaluation form. Quality assessment form for pressure steel pipe nozzle center, mileage, roundness, longitudinal seam, and circumferential seam misalignment. Pressure steel pipe nozzle center, mileage, roundness, longitudinal seam, circumferential seam misalignment quality assessment form (example form).xls │ │ │ Table 2.4-2 Weld appearance quality assessment form. Weld appearance quality assessment form (example form).xls │ │ │ Table 2.4-3 Class I and II weld internal quality, surface removal and local pit welding repair quality assessment form.xlt │ │ │ Table 2.4-3 Class I and II weld internal quality, surface removal and local pit weld repair quality assessment form filling instructions.doc │ │ │ Table 2.4-3 Quality evaluation table for internal quality, surface cleaning and local pit weld repair of Class I and II welds (example table).xls │ │ │ Table 2.4-4 Quality evaluation table for anti-corrosion surface treatment, paint coating and grouting hole plugging and welding of the inner wall of buried pressure steel pipes.xlt │ │ │ Table 2.4-4 Instructions for filling out the quality assessment form for anti-corrosion surface treatment, paint coating and grouting hole plugging and welding on the inner wall of buried pressure steel pipes.doc │ │ │ Table 2.4-4 Quality assessment form for anti-corrosion surface treatment, paint coating and grouting hole plugging and welding on the inner wall of buried pressure steel pipes (example table). │ │ Table 2.5 Instructions for filling out the project quality evaluation form for the exposed pipe installation unit of pressure steel pipes.doc │ │ │ Table 2.5 Quality evaluation form for the project of exposed pipe installation unit of pressure steel pipes (example table). │ Table 2.5-1 Instructions for filling out the quality evaluation form for the nozzle center, mileage, support center, etc. of the penstock open pipe installation project.doc │ │ │ Table 2.5-1 Quality evaluation form for the nozzle center, mileage, support center, etc. of the penstock open pipe installation project (example table).xls │ │ │ Table 2.5-2 Quality evaluation form for anti-corrosion surface treatment and coating of open pressure steel pipes. Table 2.6 Plane Gate Embedded Parts Installation Unit Project Quality Assessment Form. Flat gate bottom sill and door lintel installation quality evaluation form. Plane gate main rail and side rail installation quality evaluation form. Flat gate side waterstop seat plate and reverse rail installation quality evaluation form. Table 2.6-4 Quality evaluation form for the installation of plane gate parapets and corner guards. Distances between embedded parts within the working range of the plane gate.xlt │ │ │ Table 2.6-5 Instructions for filling in the form of distances between embedded parts within the working range of the plane gate.doc │ │ │ Table 2.6-5 Distances between embedded parts within the working range of the plane gate (example table).xls │ │ │ Table 2.7 Project quality evaluation form for the installation unit of the plane gate body.xlt │ │ │ Table 2.7 Instructions for filling out the quality evaluation form for the installation unit of the flat gate body.doc │ │ │ Table 2.7 Quality evaluation form for the installation unit of the flat gate door (example table). │ Table 2.7-1 Instructions for filling out the installation quality evaluation form for the water-stop rubber and reverse slider of the flat gate body.doc │ │ │ Table 2.7-1 Quality evaluation form for the installation of the water-stop rubber and reverse slider of the flat gate body (example table).xls │ │ │ Table 2.8 Project quality evaluation form for the installation unit of the curved gate embedded parts. │ Table 2.8 Instructions for filling out the project quality assessment form for the arc gate embedded parts installation unit.doc │ │ │ Table 2.8 Project quality assessment form for the arc gate embedded part installation unit (example table).xls │ │ │ Table 2.8-1 Arc gate bottom sill and lintel installation quality assessment form. Table 2.8-1 Instructions for filling in the curved gate bottom sill and door lintel installation quality evaluation form.doc │ │ │ Table 2.8-1 Curved gate bottom sill and door lintel installation quality evaluation form (example table).xls │ │ │ Table 2.8-2 Curved gate side waterstop seat plate and side wheel guide installation quality evaluation table.xlt │ │ │ Table 2.8-2 Curved gate side water stop seat plate and side wheel guide plate installation quality evaluation form (example table). Quality assessment form for the distance of each embedded part within the working range of the arc gate. Arc gate hinge seat steel beam, hinge seat foundation bolt center and tapered hinge seat foundation ring installation quality evaluation form. Arc gate hinge base steel beam, hinge base foundation bolt center and tapered hinge base foundation ring installation quality evaluation form (example table).xls │ │ │ Table 2.9 Curved gate door body installation unit project quality evaluation form. Curved gate door body installation unit engineering quality evaluation form (example table).xls │ │ │ Table 2.9-1 Curved gate door body hinge base installation quality evaluation form.xlt │ │ │ Table 2.9-1 Curved gate body hinge base installation quality evaluation form filling instructions.doc │ │ │ Table 2.9-1 Curved gate body hinge seat installation quality evaluation form (example table). Curved gate body hinge shaft and support arm installation quality evaluation form (example table). │ │ │ Table 2.9-3 Quality evaluation form for connecting plates and shear plates at both ends of the arc gate body arm and water-stop installation (example table).xls │ │ │ │ │ ├─Part 9 Embankment Project Appearance Quality and Unit Project Quality Evaluation Form │ │ │ Table 01 Embankment Project Appearance Quality Evaluation Form.xlt │ │ │ Table embankment 01 Embankment project appearance quality evaluation form filling instructions.doc │ │ │ Table embankment 01 embankment project appearance quality evaluation form (example form).xls │ │ │ Table embankment 01-1 Embankment unit project external dimension quality inspection and evaluation form. Instructions for filling out the external dimension quality inspection and evaluation form for the embankment unit project.doc │ │ │ Table 01-1 Quality inspection and evaluation form for the external dimensions of the embankment unit project (example form).xls │ │ │ Table 1 Embankment Foundation Cleaning Unit Project Quality Assessment Form. │ │ Surface embankment 1 embankment foundation cleaning unit project quality evaluation form (example form).xls │ │ │ Surface embankment 10 mortar stone slope protection unit project quality evaluation form. Mortar stone slope protection unit project quality evaluation form (example table).xls │ │ │ Table embankment 11 Concrete precast block slope protection unit project quality evaluation form. Concrete precast block slope protection unit project quality evaluation form (example table).xls │ │ │ Surface embankment 12 embankment foot protection (underwater riprap) unit project quality evaluation form. Embankment foot protection (underwater riprap) unit project quality evaluation form (example form).xls │ │ │ Surface embankment 2 Soil compaction embankment unit project quality evaluation form. Soil rolling compaction embankment unit project quality evaluation form (example form).xls │ │ │ Surface embankment 3 Earth material blowing and filling embankment unit project quality evaluation form. Soil blowing, filling and embankment unit project quality evaluation form (example form).xls │ │ │ Surface embankment 4 Earth material blowing, filling and pressure infiltration platform unit project quality evaluation form. Soil material blowing and filling pressure seepage platform unit project quality evaluation form (example form).xls │ │ │ Surface embankment 5 Clay anti-seepage body filling unit engineering quality evaluation form. Clay anti-seepage body filling unit project quality evaluation form (example table).xls │ │ │ Table embankment 6 Sandy soil embankment top filling unit project quality evaluation form. Sandy soil embankment top filling unit project quality evaluation form (example form).xls │ │ │ Table embankment 7 slope protection cushion unit project quality evaluation form. │ │ │ Table embankment 8 Rough-drained rubble slope protection unit project quality evaluation form. Dry masonry stone slope protection unit project quality evaluation form. ├─Part 2 Hydraulic Construction Engineering Unit Project Quality Assessment Form│ │ │ Table 1.1 Rock Slope Excavation Unit Project Quality Assessment Form. │ │ │ Table 1.10 Hydraulic Tunnel Backfill Grouting Unit Project Quality Assessment Form. │ │ Table 1.11 High-pressure jet grouting unit project quality evaluation form. Basic drainage unit project quality evaluation form.xlt │ │ │ Table 1.12 Basic drainage unit project quality evaluation form filling instructions.doc │ │ │ Table 1.12 Basic drainage unit project quality evaluation table (example table).xls │ │ │ Table 1.13 Anchor shotcrete support unit project quality evaluation form.xlt │ │ │ Table 1.13 Instructions for filling out the quality assessment form for the bolting and shotcrete support unit project.doc │ │ │ Table 1.13 Quality assessment form for the project of the bolting and shotcrete support unit (example form).xls │ │ │ Table 1.13-1 Quality assessment form for the process of bolting and shotcrete supporting anchors and steel mesh.xlt │ │ │ Table 1.13-1 Instructions for filling out the quality evaluation form for shotcrete support anchors and steel mesh processes.doc │ │ │ Table 1.13-1 Quality evaluation form for shotcrete support anchors and steel mesh procedures (example table).xls │ │ │ Table 1.13-2 Quality process evaluation form for shotcrete support for shotcrete support. Table 1.13-2 Instructions for filling out the quality process evaluation form of shotcrete for anchor shotcrete support.doc │ │ │ Table 1.13-2 Quality process evaluation form for shotcrete for anchor shotcrete support (example table).xls │ │ │ Table 1.14 Quality evaluation form for concrete anti-seepage wall unit project. Instructions for filling out the quality assessment form for concrete cut-off wall unit projects.doc │ │ │ Table 1.14 Quality assessment form for concrete cut-off wall unit projects (example table).xls │ │ │ Table 1.15 Quality assessment form for vibro-foundation reinforcement unit projects. Instructions for filling out the quality assessment form for the vibro-foundation reinforcement unit project.doc │ │ │ Table 1.15 Quality assessment form for the vibro-foundation reinforcement unit project (example form).xls │ │ │ Table 1.16 Project quality assessment form for the bored pile foundation unit.xlt │ │ │ Table 1.16 Instructions for filling out the project quality assessment form for cast-in-hole pile foundation unit.doc │ │ │ Table 1.16 Project quality assessment form for cast-in-hole pile foundation unit (example table).xls │ │ │ Table 1.17 Project quality assessment form for river dredging unit.xlt │ │ │ Table 1.17 Instructions for filling in the river dredging unit project quality assessment form.doc │ │ │ Table 1.17 River dredging unit project quality assessment form (example form).xls │ │ │ Table 1.18 Sand material quality assessment form.xlt │ │ │ Table 1.18 Instructions for filling in the sand quality assessment form.doc │ │ │ Table 1.18 Sand material quality evaluation table (example table).xls │ │ │ Table 1.19 Coarse aggregate quality evaluation table.xlt │ │ │ Table 1.19 Coarse aggregate quality evaluation table description.doc │ │ │ Table 1.19 Coarse aggregate quality evaluation table (example table).xls │ │ │ Table 1.2 Project Quality Assessment Form for Rock Foundation Excavation Unit. Concrete Mixing Quality Assessment Form.xlt │ │ │ Table 1.20 Concrete Mixing Quality Assessment Form Filling Instructions.doc │ │ │ Table 1.20 Concrete Mixing Quality Assessment Form (Example Form).xls │ │ │ Table 1.20-1 Concrete Mixing Quality Assessment Form.xlt │ │ │ Table 1.20-1 Instructions for filling in the concrete mixture quality evaluation form.doc │ │ │ Table 1.20-1 Concrete mixture quality evaluation form (example form).xls │ │ │ Table 1.20-2 Concrete test block quality evaluation form.xlt │ │ │ Table 1.20-2 Concrete test block quality evaluation form.doc │ │ │ Table 1.20-2 Concrete test block quality evaluation form (example form).xls │ │ │ Table 1.21 Concrete precast component production quality evaluation form.xlt │ │ │ Table 1.21 Concrete precast component production quality evaluation form filling instructions.doc │ │ │ Table 1.21 Precast concrete component production quality assessment form (example form).xls │ │ │ Table 1.3 Rock cavern excavation unit project quality assessment form.xlt │ │ │ Table 1.3 Rock cavern excavation unit project quality assessment form filling instructions.doc │ │ │ Table 1.3 Rock cavern excavation unit project quality assessment form (example form).xls │ │ │ Table 1.4 Soft foundation and bank slope excavation unit project quality evaluation form. Table 1.5 Concrete unit project quality evaluation form.xlt │ │ │ Table 1.5 Concrete unit project quality evaluation form filling instructions.doc │ │ │ Table 1.5 Concrete unit project quality evaluation form (example form).xls │ │ │ Table 1.5-1 Foundation surface or concrete construction joint treatment process quality evaluation form.xlt │ │ │ Table 1.5-1 Instructions for filling out the quality assessment form for the treatment process of foundation surface or concrete construction joints.doc │ │ │ Table 1.5-1 Quality assessment form for the treatment process of foundation surface or concrete construction joints (example form).xls │ │ │ Table 1.5-2 Quality assessment form for concrete formwork procedures.xlt │ │ │ Table 1.5-2 Instructions for filling in the concrete formwork process quality evaluation form.doc │ │ │ Table 1.5-2 Concrete formwork process quality evaluation form (example form).xls │ │ │ Table 1.5-3 Concrete steel bar process quality evaluation form.xlt │ │ │ Table 1.5-3 Concrete steel bar process quality evaluation form filling instructions.doc │ │ │ Table 1.5-3 Concrete reinforcement process quality evaluation form (example form).xls │ │ │ Table 1.5-4 Concrete waterstop, expansion joints and drainage pipe installation process quality evaluation form.xlt │ │ │ Table 1.5-4 Concrete waterstop, expansion joints and drainage pipe installation process quality evaluation form filling instructions.doc │ │ │ Table 1.5-4 Quality Assessment Form for Concrete Water Stopping, Expansion Joints and Drainage Pipe Installation Process (Example Form).xls │ │ │ Table 1.5-5 Quality Assessment Form for Concrete Pouring Process. 表1.5-5 混凝土浇筑工序质量评定表(例表).xls │ │ │ 表1.6 混凝土预制构件安装单元工程质量评定表.xlt │ │ │ 表1.6 混凝土预制构件安装单元工程质量评定表填表说明.doc │ │ │ 表1.6 混凝土预制构件安装单元工程质量评定表(例表).xls │ │ │ 表1.7 混凝土坝坝体接缝灌浆单元工程质量评定表.xlt │ │ │ 表1.7 混凝土坝坝体接缝灌浆单元工程质量评定表填表说明.doc │ │ │ 表1.7 混凝土坝坝体接缝灌浆单元工程质量评定表(例表).xls │ │ │ 表1.8 岩石地基帷幕灌浆单元工程质量评定表.xlt │ │ │ 表1.8 岩石地基帷幕灌浆单元工程质量评定表填表说明.doc │ │ │ 表1.8 岩石地基帷幕灌浆单元工程质量评定表(例表).xls │ │ │ 表1.9 岩石地基固结灌浆单元工程质量评定表.xlt │ │ │ 表1.9 岩石地基固结灌浆单元工程质量评定表填表说明.doc │ │ │ 表1.9 岩石地基固结灌浆单元工程质量评定表(例表).xls │ │ │ │ │ ├─第五部分水力机械辅助设备安装工程单元工程质量评定表│ │ │ 表4.1 空气压缩机安装单元工程质量评定表.xlt │ │ │ 表4.1 空气压缩机安装单元工程质量评定表填表说明.doc │ │ │ 表4.1 空气压缩机安装单元工程质量评定表(例表).xls │ │ │ 表4.10 水力机械系统管路安装单元工程质量评定表.xlt │ │ │ 表4.10 水力机械系统管路安装单元工程质量评定表填表说明.doc │ │ │ 表4.10 水力机械系统管路安装单元工程质量评定表(例表).xls │ │ │ 表4.2 深井水泵安装单元工程质量评定表.xlt │ │ │ 表4.2 深井水泵安装单元工程质量评定表填表说明.doc │ │ │ 表4.2 深井水泵安装单元工程质量评定表(例表).xls │ │ │ 表4.3 离心水泵安装单元工程质量评定表.xlt │ │ │ 表4.3 离心水泵安装单元工程质量评定表填表说明.doc │ │ │ 表4.3 离心水泵安装单元工程质量评定表(例表).xls │ │ │ 表4.4 齿轮油泵安装单元工程质量评定表.xlt │ │ │ 表4.4 齿轮油泵安装单元工程质量评定表填表说明.doc │ │ │ 表4.4 齿轮油泵安装单元工程质量评定表(例表).xls │ │ │ 表4.5 螺杆油泵安装单元工程质量评定表.xlt │ │ │ 表4.5 螺杆油泵安装单元工程质量评定表填表说明.doc │ │ │ 表4.5 螺杆油泵安装单元工程质量评定表(例表).xls │ │ │ 表4.6 水力测量仪表安装单元工程质量评定表.xlt │ │ │ 表4.6 水力测量仪表安装单元工程质量评定表填表说明.doc │ │ │ 表4.6 水力测量仪表安装单元工程质量评定表(例表).xls │ │ │ 表4.7 箱、罐及其他容器安装单元工程质量评定表.xlt │ │ │ 表4.7 箱、罐及其他容器安装单元工程质量评定表填表说明.doc │ │ │ 表4.7 箱、罐及其他容器安装单元工程质量评定表(例表).xls │ │ │ 表4.8 轴流式通风机安装单元工程质量评定表.xlt │ │ │ 表4.8 轴流式通风机安装单元工程质量评定表填表说明.doc │ │ │ 表4.8 轴流式通风机安装单元工程质量评定表(例表).xls │ │ │ 表4.9 离心式通风机安装单元工程质量评定表.xlt │ │ │ 表4.9 离心式通风机安装单元工程质量评定表填表说明.doc │ │ │ 表4.9 离心式通风机安装单元工程质量评定表(例表).xls │ │ │ │ │ ├─第八部分碾压式土石坝及砌石坝工程单元工程质量评定表│ │ │ 表7.1 土石坝坝基及岸坡处理单元工程质量评定表.xlt │ │ │ 表7.1 土石坝坝基及岸坡处理单元工程质量评定表填表说明.doc │ │ │ 表7.1 土石坝坝基及岸坡处理单元工程质量评定表(例表).xls │ │ │ 表7.1-1 基及岸坡清理工序质量评定表.xlt │ │ │ 表7.1-1 基及岸坡清理工序质量评定表填表说明.doc │ │ │ 表7.1-1 基及岸坡清理工序质量评定表(例表).xls │ │ │ 表7.1-2 防渗体岩基及岸坡开挖工序质量评定表.xlt │ │ │ 表7.1-2 防渗体岩基及岸坡开挖工序质量评定表填表说明.doc │ │ │ 表7.1-2 防渗体岩基及岸坡开挖工序质量评定表(例表).xls │ │ │ 表7.1-3 坝基及岸坡地质构造处理工序质量评定表.xlt │ │ │ 表7.1-3 坝基及岸坡地质构造处理工序质量评定表填表说明.doc │ │ │ 表7.1-3 坝基及岸坡地质构造处理工序质量评定表(例表).xls │ │ │ 表7.1-4 坝基及岸坡渗水处理工序质量评定表.xlt │ │ │ 表7.1-4 坝基及岸坡渗水处理工序质量评定表填表说明.doc │ │ │ 表7.1-4 坝基及岸坡渗水处理工序质量评定表(例表).xls │ │ │ 表7.10 堆石坝体填筑单元工程质量评定表.xlt │ │ │ 表7.10 堆石坝体填筑单元工程质量评定表填表说明.doc │ │ │ 表7.10 堆石坝体填筑单元工程质量评定表(例表).xls │ │ │ 表7.11 反滤工程单元工程质量评定表.xlt │ │ │ 表7.11 反滤工程单元工程质量评定表填表说明.doc │ │ │ 表7.11 反滤工程单元工程质量评定表(例表).xls │ │ │ 表7.12 垫层工程单元工程质量评定表.xlt │ │ │ 表7.12 垫层工程单元工程质量评定表填表说明.doc │ │ │ 表7.12 垫层工程单元工程质量评定表(例表).xls │ │ │ 表7.13 护坡工程单元工程质量评定表.xlt │ │ │ 表7.13 护坡工程单元工程质量评定表填表说明.doc │ │ │ 表7.13 护坡工程单元工程质量评定表(例表).xls │ │ │ 表7.14 排水工程单元工程质量评定表.xlt │ │ │ 表7.14 排水工程单元工程质量评定表填表说明.doc │ │ │ 表7.14 排水工程单元工程质量评定表(例表).xls │ │ │ 表7.15 浆砌石体基岩连接工程单元工程质量评定表.xlt │ │ │ 表7.15 浆砌石体基岩连接工程单元工程质量评定表填表说明.doc │ │ │ 表7.15 浆砌石体基岩连接工程单元工程质量评定表(例表).xls │ │ │ 表7.16 水泥砂浆浆砌石体单元工程质量评定表.xlt │ │ │ 表7.16 水泥砂浆浆砌石体单元工程质量评定表填表说明.doc │ │ │ 表7.16 水泥砂浆浆砌石体单元工程质量评定表(例表).xls │ │ │ 表7.16-1 水泥砂浆砌石体浆砌石体层面处理工序质量评定表.xlt │ │ │ 表7.16-1 水泥砂浆砌石体浆砌石体层面处理工序质量评定表填表说明.doc │ │ │ 表7.16-1 水泥砂浆砌石体浆砌石体层面处理工序质量评定表(例表).xls │ │ │ 表7.16-2 水泥砂浆砌石体砌筑工序质量评定表.xlt │ │ │ 表7.16-2 水泥砂浆砌石体砌筑工序质量评定表填表说明.doc │ │ │ 表7.16-2 水泥砂浆砌石体砌筑工序质量评定表(例表).xls │ │ │ 表7.17 混凝土砌石体单元工程质量评定表.xlt │ │ │ 表7.17 混凝土砌石体单元工程质量评定表填表说明.doc │ │ │ 表7.17 混凝土砌石体单元工程质量评定表(例表).xls │ │ │ 表7.18 浆砌石坝混凝土面板单元工程质量评定表.xlt │ │ │ 表7.18 浆砌石坝混凝土面板单元工程质量评定表填表说明.doc │ │ │ 表7.18 浆砌石坝混凝土面板单元工程质量评定表(例表).xls │ │ │ 表7.18-1 面板与浆砌石接触面处理工序质量评定表.xlt │ │ │ 表7.18-1 面板与浆砌石接触面处理工序质量评定表填表说明.doc │ │ │ 表7.18-1 面板与浆砌石接触面处理工序质量评定表(例表).xls │ │ │ 表7.18-2 混凝土施工缝处理工序质量评定表.xlt │ │ │ 表7.18-2 混凝土施工缝处理工序质量评定表填表说明.doc │ │ │ 表7.18-2 混凝土施工缝处理工序质量评定表(例表).xls │ │ │ 表7.18-3 模板工序质量评定表.xlt │ │ │ 表7.18-3 模板工序质量评定表填表说明.doc │ │ │ 表7.18-3 模板工序质量评定表(例表).xls │ │ │ 表7.18-4 浆砌石坝面板混凝土浇筑工序质量评定表.xlt │ │ │ 表7.18-4 浆砌石坝面板混凝土浇筑工序质量评定表填表说明.doc │ │ │ 表7.18-4 浆砌石坝面板混凝土浇筑工序质量评定表(例表).xls │ │ │ 表7.19 浆砌石坝混凝土心墙单元工程质量评定表.xlt │ │ │ 表7.19 浆砌石坝混凝土心墙单元工程质量评定表填表说明.doc │ │ │ 表7.19 浆砌石坝混凝土心墙单元工程质量评定表(例表).xls │ │ │ 表7.2 土质防渗体填筑单元工程质量评定表.xlt │ │ │ 表7.2 土质防渗体填筑单元工程质量评定表填表说明.doc │ │ │ 表7.2 土质防渗体填筑单元工程质量评定表(例表).xls │ │ │ 表7.2-1 土石坝土质防渗体结合面处理工序质量评定表.xlt │ │ │ 表7.2-1 土石坝土质防渗体结合面处理工序质量评定表填表说明.doc │ │ │ 表7.2-1 土石坝土质防渗体结合面处理工序质量评定表(例表).xls │ │ │ 表7.2-2 土石坝土质防渗体卸料及铺填工序质量评定表.xlt │ │ │ 表7.2-2 土石坝土质防渗体卸料及铺填工序质量评定表填表说明.doc │ │ │ 表7.2-2 土石坝土质防渗体卸料及铺填工序质量评定表(例表).xls │ │ │ 表7.2-3 土石坝土质防渗体压实工序质量评定表.xlt │ │ │ 表7.2-3 土石坝土质防渗体压实工序质量评定表填表说明.doc │ │ │ 表7.2-3 土石坝土质防渗体压实工序质量评定表(例表).xls │ │ │ 表7.2-4 土石坝土质防渗体接缝处理工序质量评定表.xlt │ │ │ 表7.2-4 土石坝土质防渗体接缝处理工序质量评定表填表说明.doc │ │ │ 表7.2-4 土石坝土质防渗体接缝处理工序质量评定表(例表).xls │ │ │ 表7.20 浆砌石坝水泥砂浆勾缝单元工程质量评定表.xlt │ │ │ 表7.20 浆砌石坝水泥砂浆勾缝单元工程质量评定表填表说明.doc │ │ │ 表7.20 浆砌石坝水泥砂浆勾缝单元工程质量评定表(例表).xls │ │ │ 表7.21 浆砌石溢洪道溢流面单元工程质量评定表.xlt │ │ │ 表7.21 浆砌石溢洪道溢流面单元工程质量评定表填表说明.doc │ │ │ 表7.21 浆砌石溢洪道溢流面单元工程质量评定表(例表).xls │ │ │ 表7.21-1 浆砌石溢洪道溢流面砌筑工序质量评定表.xlt │ │ │ 表7.21-1 浆砌石溢洪道溢流面砌筑工序质量评定表填表说明.doc │ │ │ 表7.21-1 浆砌石溢洪道溢流面砌筑工序质量评定表(例表).xls │ │ │ 表7.22 浆砌石墩(墙)单元工程质量评定表(例表).xls │ │ │ 表7.22 浆砌石墩(墙)单元工程质量评定表.xlt │ │ │ 表7.22 浆砌石墩(墙)单元工程质量评定表填表说明.doc │ │ │ 表7.22-1 浆砌石墩(墙)砌筑工序质量评定表.xlt │ │ │ 表7.22-1 浆砌石墩(墙)砌筑工序质量评定表填表说明.doc │ │ │ 表7.22-1 浆砌石墩(墙)砌筑工序质量评定表(例表).xls │ │ │ 表7.23 石料质量评定表.xlt │ │ │ 表7.23 石料质量评定表填表说明.doc │ │ │ 表7.23 石料质量评定表(例表).xls │ │ │ 表7.24 水泥砂浆质量评定表.xlt │ │ │ 表7.24 水泥砂浆质量评定表填表说明.doc │ │ │ 表7.24 水泥砂浆质量评定表(例表).xls │ │ │ 表7.25 混凝土预制块质量评定表.xlt │ │ │ 表7.25 混凝土预制块质量评定表填表说明.doc │ │ │ 表7.25 混凝土预制块质量评定表(例表).xls │ │ │ 表7.26 砂料质量评定表.xlt │ │ │ 表7.26 砂料质量评定表填表说明.doc │ │ │ 表7.26 砂料质量评定表(例表).xls │ │ │ 表7.27 粗骨料质量评定表.xlt │ │ │ 表7.27 粗骨料质量评定表填表说明.doc │ │ │ 表7.27 粗骨料质量评定表(例表).xls │ │ │ 表7.28 混凝土拌和质量评定表.xlt │ │ │ 表7.28 混凝土拌和质量评定表填表说明.doc │ │ │ 表7.28 混凝土拌和质量评定表(例表).xls │ │ │ 表7.3 土石坝混凝土面板单元工程质量评定表.xlt │ │ │ 表7.3 土石坝混凝土面板单元工程质量评定表填表说明.doc │ │ │ 表7.3 土石坝混凝土面板单元工程质量评定表(例表).xls │ │ │ 表7.3-1 土石坝混凝土面板基面清理工序质量评定表.xlt │ │ │ 表7.3-1 土石坝混凝土面板基面清理工序质量评定表填表说明.doc │ │ │ 表7.3-1 土石坝混凝土面板基面清理工序质量评定表(例表).xls │ │ │ 表7.3-2 土石坝混凝土面板滑模制作及安装、滑模轨道安装工序质量评定表.doc │ │ │ 表7.3-2 土石坝混凝土面板滑模制作及安装、滑模轨道安装工序质量评定表.xlt │ │ │ 表7.3-2 土石坝混凝土面板滑模制作及安装、滑模轨道安装工序质量评定表(例表).xls │ │ │ 表7.3-3 土石坝混凝土面板止水片(带)制作及安装工序质量评定表.xlt │ │ │ 表7.3-3 土石坝混凝土面板止水片(带)制作及安装工序质量评定表填表说明.doc │ │ │ 表7.3-3 土石坝混凝土面板止水片(带)制作及安装工序质量评定表(例表).xls │ │ │ 表7.3-4 土石坝混凝土面板浇筑工序质量评定表.xlt │ │ │ 表7.3-4 土石坝混凝土面板浇筑工序质量评定表填表说明.doc │ │ │ 表7.3-4 土石坝混凝土面板浇筑工序质量评定表(例表).xls │ │ │ 表7.4 沥青混凝土心墙单元工程质量评定表.xlt │ │ │ 表7.4 沥青混凝土心墙单元工程质量评定表填表说明.doc │ │ │ 表7.4 沥青混凝土心墙单元工程质量评定表(例表).xls │ │ │ 表7.4-1 基础面处理与沥青混凝土结合层面处理工序质量评定表.xlt │ │ │ 表7.4-1 基础面处理与沥青混凝土结合层面处理工序质量评定表填表说明.doc │ │ │ 表7.4-1 基础面处理与沥青混凝土结合层面处理工序质量评定表(例表).xls │ │ │ 表7.4-2 沥青混凝土心墙模板工序质量评定表.xlt │ │ │ 表7.4-2 沥青混凝土心墙模板工序质量评定表填表说明.doc │ │ │ 表7.4-2 沥青混凝土心墙模板工序质量评定表(例表).xls │ │ │ 表7.4-3 沥青混凝土制备工序质量评定表.xlt │ │ │ 表7.4-3 沥青混凝土制备工序质量评定表填表说明.doc │ │ │ 表7.4-3 沥青混凝土制备工序质量评定表(例表).xls │ │ │ 表7.4-4 心墙沥青混凝土的摊铺与碾压工序质量评定表.xlt │ │ │ 表7.4-4 心墙沥青混凝土的摊铺与碾压工序质量评定表填表说明.doc │ │ │ 表7.4-4 心墙沥青混凝土的摊铺与碾压工序质量评定表(例表).xls │ │ │ 表7.5 沥青混凝土面板整平层(含排水层)单元工程质量评定表.xlt │ │ │ 表7.5 沥青混凝土面板整平层(含排水层)单元工程质量评定表填表说明.doc │ │ │ 表7.5 沥青混凝土面板整平层(含排水层)单元工程质量评定表(例表).xls │ │ │ 表7.6 沥青混凝土面板防渗层单元工程质量评定表.xlt │ │ │ 表7.6 沥青混凝土面板防渗层单元工程质量评定表填表说明.doc │ │ │ 表7.6 沥青混凝土面板防渗层单元工程质量评定表(例表).xls │ │ │ 表7.7 沥青混凝土面板封闭层单元工程质量评定表.xlt │ │ │ 表7.7 沥青混凝土面板封闭层单元工程质量评定表(例表).xls │ │ │ 表7.7 沥青混凝土面板封闭层单元工程质量评定表(例表)填表说明.doc │ │ │ 表7.8 沥青混凝土面板与刚性建筑物连接单元工程质量评定表.xlt │ │ │ 表7.8 沥青混凝土面板与刚性建筑物连接单元工程质量评定表填表说明.doc │ │ │ 表7.8 沥青混凝土面板与刚性建筑物连接单元工程质量评定表(例表).xls │ │ │ 表7.9 砂砾坝体填筑单元工程质量评定表.xlt │ │ │ 表7.9 砂砾坝体填筑单元工程质量评定表填表说明.doc │ │ │ 表7.9 砂砾坝体填筑单元工程质量评定表(例表).xls │ │ │ │ │ ├─第六部分发电电气设备安装工程单元工程质量评定表│ │ │ 表5.1 20KV及以下油断路器安装单元工程质量评定表.xlt │ │ │ 表5.1 20KV及以下油断路器安装单元工程质量评定表填表说明.doc │ │ │ 表5.1 20KV及以下油断路器安装单元工程质量评定表(例表).xls │ │ │ 表5.10 35KV及以下电缆线路安装单元工程质量评定表.xlt │ │ │ 表5.10 35KV及以下电缆线路安装单元工程质量评定表填表说明.doc │ │ │ 表5.10 35KV及以下电缆线路安装单元工程质量评定表(例表1).xls │ │ │ 表5.10 35KV及以下电缆线路安装单元工程质量评定表(例表2).xls │ │ │ 表5.11 硬母线装置安装单元工程质量评定表.xlt │ │ │ 表5.11 硬母线装置安装单元工程质量评定表填表说明.doc │ │ │ 表5.11 硬母线装置安装单元工程质量评定表(例表).xls │ │ │ 表5.12 电气接地装置单元工程质量评定表.xlt │ │ │ 表5.12 电气接地装置单元工程质量评定表填表说明.doc │ │ │ 表5.12 电气接地装置单元工程质量评定表(例表).xls │ │ │ 表5.13 保护网安装单元工程质量评定表.xlt │ │ │ 表5.13 保护网安装单元工程质量评定表填表说明.doc │ │ │ 表5.13 保护网安装单元工程质量评定表(例表).xls │ │ │ 表5.14 控制保护装置安装单元工程质量评定表.xlt │ │ │ 表5.14 控制保护装置安装单元工程质量评定表填表说明.doc │ │ │ 表5.14 控制保护装置安装单元工程质量评定表(例表1).xls │ │ │ 表5.14 控制保护装置安装单元工程质量评定表(例表2).xls │ │ │ 表5.15 铅蓄电池安装单元工程质量评定表.xlt │ │ │ 表5.15 铅蓄电池安装单元工程质量评定表填表说明.doc │ │ │ 表5.15 铅蓄电池安装单元工程质量评定表(例表).xls │ │ │ 表5.16 起重机电气设备安装单元工程质量评定表.xlt │ │ │ 表5.16 起重机电气设备安装单元工程质量评定表填表说明.doc │ │ │ 表5.16 起重机电气设备安装单元工程质量评定表(例表).xls │ │ │ 表5.17 电气照明装置安装单元工程质量评定表.xlt │ │ │ 表5.17 电气照明装置安装单元工程质量评定表填表说明.doc │ │ │ 表5.17电气照明装置安装单元工程质量评定表(例表).xls │ │ │ 表5.2 户内式隔离开关安装单元工程质量评定表.xlt │ │ │ 表5.2 户内式隔离开关安装单元工程质量评定表填表说明.doc │ │ │ 表5.2 户内式隔离开关安装单元工程质量评定表(例表).xls │ │ │ 表5.3 3~20KV负荷开关或高压熔断器安装单元工程质量评定表.xlt │ │ │ 表5.3 3~20KV负荷开关或高压熔断器安装单元工程质量评定表填表说明.doc │ │ │ 表5.3 3~20KV负荷开关或高压熔断器安装单元工程质量评定表(例表1).xls │ │ │ 表5.3 3~20KV负荷开关或高压熔断器安装单元工程质量评定表(例表2).xls │ │ │ 表5.4 20KV及以下互感器安装单元工程质量评定表.xlt │ │ │ 表5.4 20KV及以下互感器安装单元工程质量评定表填表说明.doc │ │ │ 表5.4 20KV及以下互感器安装单元工程质量评定表(例表1).xls │ │ │ 表5.4 20KV及以下互感器安装单元工程质量评定表(例表2).xls │ │ │ 表5.5 20KV及以下干式电抗器安装单元工程质量评定表.xlt │ │ │ 表5.5 20KV及以下干式电抗器安装单元工程质量评定表填表说明.doc │ │ │ 表5.5 20KV及以下干式电抗器安装单元工程质量评定表(例表).xls │ │ │ 表5.6 避雷器安装单元工程质量评定表.xlt │ │ │ 表5.6 避雷器安装单元工程质量评定表填表说明.doc │ │ │ 表5.6 避雷器安装单元工程质量评定表(例表).xls │ │ │ 表5.7 固定式手车式高压开关柜安装单元工程质量评定表.xlt │ │ │ 表5.7 固定式手车式高压开关柜安装单元工程质量评定表填表说明.doc │ │ │ 表5.7 固定式手车式高压开关柜安装单元工程质量评定表(例表).xls │ │ │ 表5.8 油浸式厂用变压器安装单元工程质量评定表.xlt │ │ │ 表5.8 油浸式厂用变压器安装单元工程质量评定表填表说明.doc │ │ │ 表5.8 油浸式厂用变压器安装单元工程质量评定表(例表).xls │ │ │ 表5.9 低压配电盘及低压电器安装单元工程质量评定表.xlt │ │ │ 表5.9 低压配电盘及低压电器安装单元工程质量评定表填表说明.doc │ │ │ 表5.9 低压配电盘及低压电器安装单元工程质量评定表(例表).xls │ │ │ │ │ └─第四部分水轮发电机组安装工程单元工程质量评定表│ │ 表3.1 立式反击式水轮机吸出管里衬安装单元工程质量评定表.xlt │ │ 表3.1 立式反击式水轮机吸出管里衬安装单元工程质量评定表填表说明.doc │ │ 表3.1 立式反击式水轮机吸出管里衬安装单元工程质量评定表(例表).xls │ │ 表3.10 立式反击式水轮机附件安装单元工程质量评定表.xlt │ │ 表3.10 立式反击式水轮机附件安装单元工程质量评定表填表说明.doc │ │ 表3.10 立式反击式水轮机附件安装单元工程质量评定表(例表).xls │ │ 表3.11 灯泡贯流式水轮机尾水管安装单元工程质量评定表.xlt │ │ 表3.11 灯泡贯流式水轮机尾水管安装单元工程质量评定表填表说明.doc │ │ 表3.11 灯泡贯流式水轮机尾水管安装单元工程质量评定表(例表).xls │ │ 表3.12 灯泡贯流式水轮机座环安装单元工程质量评定表.xlt │ │ 表3.12 灯泡贯流式水轮机座环安装单元工程质量评定表填表说明.doc │ │ 表3.12 灯泡贯流式水轮机座环安装单元工程质量评定表(例表).xls │ │ 表3.13 灯泡贯流式水轮机导水机构安装单元工程质量评定表.xlt │ │ 表3.13 灯泡贯流式水轮机导水机构安装单元工程质量评定表填表说明.doc │ │ 表3.13 灯泡贯流式水轮机导水机构安装单元工程质量评定表(例表).xls │ │ 表3.14 灯泡贯流式水轮机轴承安装单元工程质量评定表.xlt │ │ 表3.14 灯泡贯流式水轮机轴承安装单元工程质量评定表填表说明.doc │ │ 表3.14 灯泡贯流式水轮机轴承安装单元工程质量评定表(例表).xls │ │ 表3.15 灯泡贯流式水轮机主轴及转轮安装单元工程质量评定表.xlt │ │ 表3.15 灯泡贯流式水轮机主轴及转轮安装单元工程质量评定表填表说明.doc │ │ 表3.15 灯泡贯流式水轮机主轴及转轮安装单元工程质量评定表(例表).xls │ │ 表3.16 冲击式水轮机机壳安装单元工程质量评定表.xlt │ │ 表3.16 冲击式水轮机机壳安装单元工程质量评定表填表说明.doc │ │ 表3.16 冲击式水轮机机壳安装单元工程质量评定表(例表).xls │ │ 表3.17 冲击式水轮机喷嘴及接力器安装单元工程质量评定表.xlt │ │ 表3.17 冲击式水轮机喷嘴及接力器安装单元工程质量评定表填表说明.doc │ │ 表3.17 冲击式水轮机喷嘴及接力器安装单元工程质量评定表(例表).xls │ │ 表3.18 冲击式水轮机转轮安装单元工程质量评定表.xlt │ │ 表3.18 冲击式水轮机转轮安装单元工程质量评定表填表说明.doc │ │ 表3.18 冲击式水轮机转轮安装单元工程质量评定表(例表).xls │ │ 表3.19 冲击式水轮机控制机构安装单元工程质量评定表.xlt │ │ 表3.19 冲击式水轮机控制机构安装单元工程质量评定表填表说明.doc │ │ 表3.19 冲击式水轮机控制机构安装单元工程质量评定表(例表).xls │ │ 表3.2 立式反击式水轮机基础环、座环安装单元工程质量评定表.xlt │ │ 表3.2 立式反击式水轮机基础环、座环安装单元工程质量评定表填表说明.doc │ │ 表3.2 立式反击式水轮机基础环、座环安装单元工程质量评定表(例表).xls │ │ 表3.20 油压装置安装单元工程质量评定表.xlt │ │ 表3.20 油压装置安装单元工程质量评定表填表说明.doc │ │ 表3.20 油压装置安装单元工程质量评定表(例表).xls │ │ 表3.21 调速器安装及调试单元工程质量评定表.xlt │ │ 表3.21 调速器安装及调试单元工程质量评定表填表说明.doc │ │ 表3.21 调速器安装及调试单元工程质量评定表(例表).xls │ │ 表3.22 调速系统整体调试及模拟试验单元工程质量评定表.xlt │ │ 表3.22 调速系统整体调试及模拟试验单元工程质量评定表填表说明.doc │ │ 表3.22 调速系统整体调试及模拟试验单元工程质量评定表(例表).xls │ │ 表3.23 立式水轮发电机上、下机架组装及安装单元工程质量评定表.xlt │ │ 表3.23 立式水轮发电机上、下机架组装及安装单元工程质量评定表填表说明.doc │ │ 表3.23 立式水轮发电机上、下机架组装及安装单元工程质量评定表(例表).xls │ │ 表3.24 立式水轮发电机定子组装及安装单元工程质量评定表.xlt │ │ 表3.24 立式水轮发电机定子组装及安装单元工程质量评定表填表说明.doc │ │ 表3.24 立式水轮发电机定子组装及安装单元工程质量评定表(例表).xls │ │ 表3.25 立式水轮发电机转子组装单元工程质量评定表.xlt │ │ 表3.25 立式水轮发电机转子组装单元工程质量评定表填表说明.doc │ │ 表3.25 立式水轮发电机转子组装单元工程质量评定表(例表).xls │ │ 表3.26 立式水轮发电机制动器安装单元工程质量评定表.xlt │ │ 表3.26 立式水轮发电机制动器安装单元工程质量评定表填表说明.doc │ │ 表3.26 立式水轮发电机制动器安装单元工程质量评定表(例表).xls │ │ 表3.27 立式水轮发电机转子安装单元工程质量评定表.xlt │ │ 表3.27 立式水轮发电机转子安装单元工程质量评定表填表说明.doc │ │ 表3.27 立式水轮发电机转子安装单元工程质量评定表(例表).xls │ │ 表3.28 立式水轮发电机推力轴承及导轴承安装单元工程质量评定表.xlt │ │ 表3.28 立式水轮发电机推力轴承及导轴承安装单元工程质量评定表填表说明.doc │ │ 表3.28 立式水轮发电机推力轴承及导轴承安装单元工程质量评定表(例表).xls │ │ 表3.29 立式水轮发电机组轴线调整单元工程质量评定表.xlt │ │ 表3.29 立式水轮发电机组轴线调整单元工程质量评定表填表说明.doc │ │ 表3.29 立式水轮发电机组轴线调整单元工程质量评定表(例表).xls │ │ 表3.3 立式反击式水轮机蜗壳安装单元工程质量评定表.xlt │ │ 表3.3 立式反击式水轮机蜗壳安装单元工程质量评定表填表说明.doc │ │ 表3.3 立式反击式水轮机蜗壳安装单元工程质量评定表(例表).xls │ │ 表3.30 立式水轮发电机励磁机及永磁机安装单元工程质量评定表.xlt │ │ 表3.30 立式水轮发电机励磁机及永磁机安装单元工程质量评定表填表说明.doc │ │ 表3.30 立式水轮发电机励磁机及永磁机安装单元工程质量评定表(例表).xls │ │ 表3.31 水轮机发电机电气部分检查和试验单元工程质量评定表.xlt │ │ 表3.31 水轮机发电机电气部分检查和试验单元工程质量评定表填表说明.doc │ │ 表3.31 水轮机发电机电气部分检查和试验单元工程质量评定表(例表).xls │ │ 表3.32 卧式水轮发电机轴瓦及轴承安装单元工程质量评定表.xlt │ │ 表3.32 卧式水轮发电机轴瓦及轴承安装单元工程质量评定表填表说明.doc │ │ 表3.32 卧式水轮发电机轴瓦及轴承安装单元工程质量评定表(例表).xls │ │ 表3.33 卧式水轮发电机转子及定子安装单元工程质量评定表.xlt │ │ 表3.33 卧式水轮发电机转子及定子安装单元工程质量评定表填表说明.doc │ │ 表3.33 卧式水轮发电机转子及定子安装单元工程质量评定表(例表).xls │ │ 表3.34 灯泡式水轮发电机主要部件组装单元工程质量评定表.xlt │ │ 表3.34 灯泡式水轮发电机主要部件组装单元工程质量评定表填表说明.doc │ │ 表3.34 灯泡式水轮发电机主要部件组装单元工程质量评定表(例表).xls │ │ 表3.35 灯泡式水轮发电机总体安装单元工程质量评定表.xlt │ │ 表3.35 灯泡式水轮发电机总体安装单元工程质量评定表填表说明.doc │ │ 表3.35 灯泡式水轮发电机总体安装单元工程质量评定表(例表).xls │ │ 表3.36 蝴蝶阀安装单元工程质量评定表.xlt │ │ 表3.36 蝴蝶阀安装单元工程质量评定表填表说明.doc │ │ 表3.36 蝴蝶阀安装单元工程质量评定表(例表).xls │ │ 表3.37 球阀安装单元工程质量评定表.xlt │ │ 表3.37 球阀安装单元工程质量评定表填表说明.doc │ │ 表3.37 球阀安装单元工程质量评定表(例表).xls │ │ 表3.38 伸缩节安装单元工程质量评定表.xlt │ │ 表3.38 伸缩节安装单元工程质量评定表填表说明.doc │ │ 表3.38 伸缩节安装单元工程质量评定表(例表).xls │ │ 表3.39 附件及操作机构安装单元工程质量评定表.xlt │ │ 表3.39 附件及操作机构安装单元工程质量评定表填表说明.doc │ │ 表3.39 附件及操作机构安装单元工程质量评定表(例表).xls │ │ 表3.4 立式反击式水轮机机坑里衬及接力器基础安装单元工程质量评定表.xlt │ │ 表3.4 立式反击式水轮机机坑里衬及接力器基础安装单元工程质量评定表填表说明.doc │ │ 表3.4 立式反击式水轮机机坑里衬及接力器基础安装单元工程质量评定表(例表).xls │ │ 表3.40 机组管路安装单元工程质量评定表.xlt │ │ 表3.40 机组管路安装单元工程质量评定表填表说明.doc │ │ 表3.40 机组管路安装单元工程质量评定表(例表).xls │ │ 表3.40-1 机组管路管件制作质量评定表.xlt │ │ 表3.40-1 机组管路管件制作质量评定表填表说明.doc │ │ 表3.40-1 机组管路管件制作质量评定表(例表).xls │ │ 表3.40-2 机组管路管道安装质量评定表.xlt │ │ 表3.40-2 机组管路管道安装质量评定表填表说明.doc │ │ 表3.40-2 机组管路管道安装质量评定表(例表).xls │ │ 表3.40-3 管道焊接质量评定表.xlt │ │ 表3.40-3 管道焊接质量评定表填表说明.doc │ │ 表3.40-3 管道焊接质量评定表(例表).xls │ │ 表3.40-4 管道试验评定表.xlt │ │ 表3.40-4 管道试验评定表填表说明.doc │ │ 表3.40-4 管道试验评定表(例表).xls │ │ 表3.41 机组充水试验单元工程质量评定表.xlt │ │ 表3.41 机组充水试验单元工程质量评定表填表说明.doc │ │ 表3.41 机组充水试验单元工程质量评定表(例表).xls │ │ 表3.42 机组空载试验单元工程质量评定表.xlt │ │ 表3.42 机组空载试验单元工程质量评定表填表说明.doc │ │ 表3.42 机组空载试验单元工程质量评定表(例表).xls │ │ 表3.43 机组并列及负荷试验单元工程质量评定表.xlt │ │ 表3.43 机组并列及负荷试验单元工程质量评定表填表说明.doc │ │ 表3.43 机组并列及负荷试验单元工程质量评定表(例表).xls │ │ 表3.5 立式反击式水轮机转轮装配单元工程质量评定表.xlt │ │ 表3.5 立式反击式水轮机转轮装配单元工程质量评定表填表说明.doc │ │ 表3.5 立式反击式水轮机转轮装配单元工程质量评定表(例表).xls │ │ 表3.6 立式反击式水轮机导水机构安装单元工程质量评定表.xlt │ │ 表3.6 立式反击式水轮机导水机构安装单元工程质量评定表填表说明.doc │ │ 表3.6 立式反击式水轮机导水机构安装单元工程质量评定表(例表).xls │ │ 表3.7 立式反击式水轮机接力器安装单元工程质量评定表.xlt │ │ 表3.7 立式反击式水轮机接力器安装单元工程质量评定表填表说明.doc │ │ 表3.7 立式反击式水轮机接力器安装单元工程质量评定表(例表).xls │ │ 表3.8 立式反击式水轮机转动部件安装单元工程质量评定表.xlt │ │ 表3.8 立式反击式水轮机转动部件安装单元工程质量评定表填表说明.doc │ │ 表3.8 立式反击式水轮机转动部件安装单元工程质量评定表(例表).xls │ │ 表3.9 立式反击式水轮机水导轴承及主轴密封安装单元工程质量评定表.xlt │ │ 表3.9 立式反击式水轮机水导轴承及主轴密封安装单元工程质量评定表填表说明.doc │ │ 表3.9 立式反击式水轮机水导轴承及主轴密封安装单元工程质量评定表(例表).xls │ │ │ ├─水电站工程第Ⅴ标(ZZCⅤ)施工组织设计│ │ 7.2压力管道混凝土工程施工.doc │ │ 7.3压力管道(含调压井、引水隧洞)灌浆工程施工.doc │ │ 8.1厂房及尾水渠基础土石方开挖工程施工.doc │ │ 8.2厂房混凝土工程施工.doc │ │ 8.4厂房砌体工程施工.doc │ │ 8.5厂房建筑工程施工.doc │ │ 8.7、8.8尾水渠土石方回填、砌体工程施工.doc │ │ MFM1992 │ │ 施工组织设计分工表(9-19).doc │ │ 目录(中).doc │ │ 第10章升压站工程施工说明书.doc │ │ 第11章拟投入本合同工程的主要施工设备汇总表.doc │ │ 第12章进厂公路大桥施工方法说明书.doc │ │ 第13章劳动力计划表.doc │ │ 第14章拟投入本合同工作的施工组织机构.doc │ │ 第14章施工进度保证措施.doc │ │ 第15章施工质量保证措施.doc │ │ 第16章施工安全及文明施工保证措施.doc │ │ 第17章环境保护措施.doc │ │ 第1章施工总说明(Z).doc │ │ 第2章施工总进度表和网络图说明.doc │ │ 第3章施工总体布置说明.doc │ │ 第4章施工用地计划表.doc │ │ 第5章施工期水流控制.doc │ │ 第6章混凝土拌和系统平面布置及工艺流程说明书.doc │ │ 第7章压力管道(含调压井、引水隧洞)工程施工说明书(7.1).doc │ │ 答疑 1.doc │ │ │ ├─Construction organization design document of the underground power station, spillway tunnel and metal structure installation project on the left bank of the hydropower station │ │ Construction organization design summary.doc │ │ Table 14-3.doc │ │ │ ├─Hydropower station expansion project construction organization design │ │ Construction technical measures.doc │ │ Construction progress network diagram 2.xls │ │ bar chart 2.xls │ │ │ ├─Hydropower station steel structure │ │ Switch station outlet frame ordering list. │ Table of Contents 0.doc │ │ Chapter 1.2.3.doc │ │ Chapter 10.doc │ │ Chapter 11.doc │ │ Chapter 12.doc │ │ Chapter 13.doc │ │ Chapter 14.doc │ │ Chapter 15.doc │ │ Chapter 16.doc │ │ Chapter 17.doc │ │ Chapter 18.doc │ │ Chapter 19.doc │ │ Chapter 4.doc │ │ Chapter 5.doc │ │ Chapter 6.doc │ │ Chapter 7.doc │ │ Chapter 8.doc │ │ Chapter 9.doc │ │ │ ├─Zipingpu Hydropower Station Diversion Tunnel Construction Organization Design│ │ │ 2 │ │ │ 3 │ │ │ First│ │ │ │ │ ├─Zipingpu Construction Organization Design│ │ │ Chapter 01 Overview.doc │ │ │ Chapter 02 General Layout of Construction.doc │ │ │ Chapter 06 Construction Measurement.doc │ │ │ Chapter 08 Spillway Excavation and Support.doc │ │ │ Chapter 09 Foundation Treatment.doc │ │ │ Chapter 10 Dam material processing.doc │ │ │ Chapter 12 Ballast body filling.doc │ │ │ Chapter 14 Spillway concrete construction and stone backfill.doc │ │ │ Chapter 15 Spillway tunnel entrance excavation and support.doc │ │ │ Chapter 16 Drainage hole, grouting hole, excavation and concrete construction.doc │ │ │ Chapter 17 Observation Instrument Burial and Construction Period Observation.doc │ │ │ Chapter 20 Environmental Protection and Soil and Water Conservation.doc │ │ │ Chapter 21 Safety Construction Measures.doc │ │ │ Chapter 21 Table 21-1.doc │ │ │ Chapter 22 Information Management.doc │ │ │ Chapter 23-1.xls │ │ │ Chapter 23-2.xls │ │ │ Chapter 24 Construction Organization, Labor Organization.doc │ │ │ Table 19-1.doc │ │ │ │ │ └─Yellow River Shapotou Water Conservancy Project Flood Release Gate and Nanqian Power Station Civil Engineering Construction │ │ ├─C1 Standard │ │ │ │ C1 Drawing.rar │ │ │ │ C1 Construction Organization Design.doc │ │ │ │ │ │ │ └─C1 drawing│ │ │ C1-08.dwg │ │ │ C1 standard--horizontal diagram.dwg │ │ │ C1 standard--concrete pouring progress image diagram.dwg │ │ │ C1 standard--network diagram.dwg │ │ │ gxg29.dwg │ │ │ gxg30.dwg │ │ │ SDSJ-TB-SPTC1-01.dwg │ │ │ SDSJ-TB-SPTC1-02.dwg │ │ │ SDSJ-TB-SPTC1-03.dwg │ │ │ SDSJ-TB-SPTC1-04.dwg │ │ │ Beigan Power Station Concrete Layered Block Layout.dwg │ │ │ Drawing Catalog c1.doc │ │ │ Concrete layering diagram of the dam section between installation.dwg │ │ │ Shapotou excavation road layout C1R14.dwg │ │ │ Shapotou cast-in-place pile construction sequence diagram.dwg │ │ │ Shapotou blasting design diagram C1-2.dwg │ │ │ Shapotou blasting design drawing C1.dwg │ │ │ Riverbed power station layering diagram.dwg │ │ │ Corbel formwork diagram.dwg │ │ │ Concrete layering diagram of pier dam section.dwg │ │ │ │ │ └─C2 mark│ │ │ C2-Construction Organization Design 0226.doc │ │ │ │ │ └─C2 drawing │ │ C2-080.dwg │ │ C2-10 excavation layering diagram.dwg │ │ C2-11 large-area excavation and protective layer blasting design drawing-C2 standard.dwg │ │ C2-12 slope blasting design drawing.dwg │ │ C2-13 Adit excavation diagram.dwg │ │ C2-14 Shapotou excavation and filling balance diagram.dwg │ │ C2-9 excavation road.dwg │ │ C2-Concrete progress image diagram.dwg │ │ C2 standard gold knot drawing (25_27).dwg │ │ MQ1000 door operator elevation (17).dwg │ │ MQ600 door operator elevation (16).dwg │ │ SDSJ-TB-SPTC2-01.dwg │ │ SDSJ-TB-SPTC2-02.dwg │ │ SDSJ-TB-SPTC2-03.dwg │ │ SDSJ-TB-SPTC2-04.dwg │ │ Nagan corbel formwork drawing (21).dwg │ │ Nagan power station concrete layering (19).dwg │ │ Nagan breast wall formwork drawing (20).dwg │ │ Column formwork (24).dwg │ │ Shapotou progress c2.xls │ │ Concrete layering in the flood gate and dam section (18).dwg │ │ Sliding form diagram of the flood gate overflow surface (22).dwg │ │ Template for the gradient section of the flow channel (23).dwg │ │ Network diagram c2.dwg │ │ Door machine plan (No. 2 and No. 3) (15).dwg │ │ Door machine elevation (supernumerary drawing No. 2) (17).dwg │ │ │ ├─ Myanmar Hydropower Station 2nd bid construction organization design plan │ │ │ Table of contents.doc │ │ │ Chapter 10 Diversion Tunnel Concrete Construction.doc │ │ │ Chapter 11 Factory hub earthwork project.doc │ │ │ Chapter 12 Factory construction drainage and flood control project.doc │ │ │ Chapter 13 Factory hub concrete project.doc │ │ │ Chapter 14 Concrete temperature control measures.doc │ │ │ Chapter 15 Grouting project.doc │ │ │ Chapter 16.doc │ │ │ Chapter 17 Water machine, electrical appliance installation and pipeline embedded parts construction.doc │ │ │ Chapter 18, 19, 20, 21, 22.doc │ │ │ Chapter 1 Project Overview (Defined).doc │ │ │ Chapter 2 Overall Construction Layout (Defined).doc │ │ │ Chapter 3 Project Construction Characteristics (Defined).doc │ │ │ Chapter 4 Overall Construction Progress Plan.doc │ │ │ Chapter 5 Construction General Layout.doc │ │ │ Chapter 6 Artificial Sand and Stone Processing System (Defined).doc │ │ │ Chapters 7 and 8.doc │ │ │ Chapter 9 Construction of branch tunnels, diversion tunnels and pressure pipes, earthwork excavation and support.doc │ │ │ │ │ ├─General layout plan │ │ │ 1.wmf │ │ │ 12.bmp │ │ │ 13.bmp │ │ │ 2.wmf │ │ │ yfaj.prt │ │ │ Final construction floor plan.dwg │ │ │ Unnamed 1.bmp │ │ │ Unnamed 2.bmp │ │ │ │ │ └─Overall progress crosswalk and network diagram │ │ Crosswalk and network.doc │ │ │ ├─Jinlongtan Hydropower Station Diversion Tunnel Construction Organization Design │ │ Project Progress Schedule - Branch Tunnel.xls │ │ Diversion Tunnel Main Construction Equipment List.doc │ │ Jinlongtan Hydropower Station Diversion Tunnel Construction Organization Design.doc │ │ │ ├─Construction organization design for the second bid section of the transportation project of Lianghekou Hydropower Station in Yalong River│ │ Implementation construction organization design.doc │ │ Cover.doc │ │ Cement concrete mixing station floor plan.dwg │ │ Network diagram.doc │ │ Table 4 General construction floor plan.dwg │ │ Table 6 Sub-project productivity and construction periodicity table. │ │ Chapter 1 Overview.doc │ │ Chapter 7 Construction of Anchor Cable and Anchor Bolt Spray Protection Project.doc │ │ Chapter 3 General Construction Layout.doc │ │ Chapter 9 Grouting Project Construction.doc │ │ Chapter 2 Overall Construction Progress and Network Plan.doc │ │ Chapter 5 Construction Period Water Flow Control Methods and Instructions.doc │ │ Chapter 8 Concrete Project Construction.doc │ │ Chapter 6 Earthwork Excavation Project Construction.doc │ │ Chapter 11 Prototype Observation Project Construction.doc │ │ Chapter 13 Main Machinery and Equipment Put into Project Construction.doc │ │ Chapter 12 Gate and Hoist Engineering.doc │ │ Chapter 15 Technical Measures and Organizational Measures to Ensure Construction Safety.doc │ │ Chapter 16 Environmental Protection and Civilized Construction Measures.doc │ │ Chapter 14 Quality Assurance System Documents.doc │ │ Chapter 10 Mortar Masonry Engineering Construction.doc │ │ Chapter 4 Sand and Gravel Aggregate Production.doc │ │ │ ├─Construction Organization Design Plan for Xiaoxia Hydropower Station on the Yellow River│ │ │ II Standard Construction Organization Design.doc │ │ │ │ │ └─Drawings│ │ 03. Construction progress network diagram.dwg │ │ 07 Cofferdam filling construction.dwg │ │ │ └─ Construction organization design of outdoor hardening, greening and enclosure engineering for the new apartment building of the Yellow River Laxiwa Hydropower Station │ j Progress schedule.xls │ Temporary facility layout drawing.doc │ Construction organization design of outdoor hardening, greening and enclosure engineering for new apartment buildings at Laxiwa Hydropower Station on the Yellow River.doc │ └─4. Hydropower Station Paper 100 Application of t-level upward prestressed anchor cables in the Jishixia Hydropower Station tunnel project Design and application practice of 35kV rural hydropower transmission lines 400V low-voltage unit hydropower station completely unmanned remote automation system 798 hydropower station water diversion channel right landslide stability analysis and evaluation 8000m3/d mine hydropower adsorption treatment project application AIM software in the three-dimensional design of water conservancy and hydropower projects Discussion on the application of Autodesk Application of Revit in the design of the crane beam family of the hydropower station building. Application of the BMC multi-point displacement meter in the spillway tunnel of the Jishixia Hydropower Station. Application study of the BOT project concession period decision-making model in a hydropower station in Laos. Application study of C25 low-strength self-compacting concrete in hydropower station engineering. Analysis of greenhouse gas emission reduction benefits of CDM grid-connected small hydropower projects. Application of CSG damming technology in the construction of the downstream cofferdam of the Mamaya Level 1 Hydropower Station. EH4 A brief analysis of hydropower construction management under the EPC general contracting model in detecting the deep overburden at a hydropower station dam site in Tibet FLAC 3D stability analysis of the slope in the Huangjiaoshu Hydropower Station engineering area. Application research of GC in the three-dimensional parametric modeling design of the hydropower station powerhouse volute. GD Application of GIS technology in the layout of electrical equipment of the hydropower station in the investigation of soil and water loss in the hydropower station project. G The application of IS intelligent control cabinet in hydropower stations. The application of GPS global satellite positioning system in the engineering survey of Beilei Hydropower Station in Congjiang County. The application of GPS in the construction control network of Kunjiang 2 Hydropower Project in Vietnam. The application of GPS technology in the reservoir area control of Manman Hydropower Station. Application of system measurement GPS monitoring technology in the construction of Nuozhadu Hydropower Station Dam Design and optimization of HDBT hydropower station long power generation water diversion system Application of HF impact-resistant and wear-resistant concrete in ceiling hydropower station engineering Design and development of HM9000ES hydropower unit fault diagnosis expert system Design of J2 hydropower station surge tank Design discussion on KST hydropower station spillway hydraulic model test optimization Lomaum hydropower dam bridge deck beam, plate system formwork support rigid frame structure design Memetic Application of algorithm in optimal load distribution of hydropower station Brief analysis of Naltar-V hydropower station regulation guarantee calculation Analysis of shear failure of the left side slope of booster station and gate shaft of Nam Ngum 5 hydropower station Engineering construction diversion design of Nam Ngum 5 hydropower station NEELUM The feasibility of applying the NGA attenuation relationship to the seismic design of major hydropower projects by changing the diversion scheme and optimizing the barrage construction of the JHELUM hydropower station. The application of NMGCOSR in water conservancy and hydropower surveying and mapping. The application of P3 software in the preparation of plans for the bidding stage of hydropower projects. The application of PCCP pipes in the water diversion project of Dahe Yanhe Hydropower Station. The application of PLC in the hydraulic hoist control system of hydropower projects. The application of PLC technology in the hydropower station control system. Power Research on the application of InRoads in road design of water conservancy and hydropower projects. Application of PS-200 waterproof coating in Shuanghekou Hydropower Station. RVA method to evaluate the impact of hydropower stations in the Mengjiang River Basin on the hydrological situation of the river. Development and production practice of S-135 (00Cr13Ni5Mo) hydropower steel in Lingang. Application of Sap2000 in tunnel design of Khanhua Hydropower Station in Pakistan. SCS The application of G2004 in the calculation of earthwork quantities of the Three Gorges Hydropower Station. The application of Simplorer software in the hydropower and wind energy complementary system. Research on the application of SM plant glue in the geological drilling of the Duobu Hydropower Station. The application of TOFD technology in the volute detection of the Xiangjiaba Hydropower Station. The application of TOFD technology in the quality detection of the volute welds of the Pugou Hydropower Station. Application of TPY class current transformer in Bando Hydropower Station Application of Vpstudio in water conservancy and hydropower construction drawings Architectural design of main and auxiliary workshops of ZONGOⅡ hydropower station project Water fire protection system design of ZONGOⅡ hydropower station Application of "IEA system" in the transformation of grounding grid of Taipingjiang I hydropower station in Myanmar "Belt and Road" energy cooperation: Opportunities and Challenges of Small Hydropower Exploration and Practice of "One River, Two Systems" Mixed Ownership Economy in Hydropower Development in the Middle Reaches of Jinsha River "Internet +" Rural Hydropower Intelligent Management Direction Discussion on the Construction and Management System of Hydropower New Rural Electrification County in the "Thirteenth Five-Year Plan" Discussion on the operating mechanism of the "integration of construction and management, seamless handover" construction participation model in the application of the "micro-reading" trend of Xiluodu Hydropower Station to promote the study of paper book reading - taking Zhejiang Water Conservancy and Hydropower College as an example, the "Dragon Head Head" program was implemented in a diversion tunnel of a hydropower station Application in unblocking blockages. Preparation and application of "Design Code for Reasonable Service Life and Durability of Water Conservancy and Hydropower Projects". Application of the linear regression model in predicting annual power supply in hydropower self-supply areas. A new hydropower station leakage and drainage control method. Analysis of accidents caused by demagnetization protection action of small hydropower station Wanjiakouzi Hydropower Station SF6 fully enclosed combined electrical design experience GIS Switch Station Characteristics and Renovation Treatment and Reason Analysis of Insulation Breakdown of 220kV Dry Cable in Wanjiazhai Hydropower Station Troubleshooting and cause analysis of the shaft-sliding rotor on the upper end of the hydroelectric generator of the Wanjiazhai Hydropower Station. The overflow of the stator core of the hydroelectric generator of the Wanjiazhai Hydropower Station and the necessity of modification. Analysis of the heat dissipation of the electromechanical equipment of the three hydropower stations. On-site testing and analysis of the Three Gorges Project and the Analysis of structural design comparison and quality control difficulties of the ship lift compartment of Jiaba Hydropower Station Baiyangping Hydropower Station in the Three Gorges Reservoir Area Project risk analysis in the decision-making stage of the Baiyangping Hydropower Station Research on the design and application of equipment in the final stage of the Three Gorges Hydropower Station project. A brief description of the supervision and management work in the final stage of the Three Gorges Hydropower Station. The layout and construction of the concrete production system on the left bank of the Three Gorges Hydropower Station. An analysis of the peak-shaving application of the Three Gorges Hydropower Station. The application of the three-standard management system in the water conservancy and hydropower industry. Sanhekou Hydropower Station Design of underground forebay. Discussion on foundation pit excavation technology of Sanshenggong Phase II Hydropower Station project. Discussion on computer monitoring system scheme of Sanshenggong Hydropower Station. Application of 3D CAD technology in water conservancy and hydropower engineering design. 3D geological modeling in the underground cavern enclosure of Yabiluo Hydropower Station. Application of three-dimensional finite element software in rock stability analysis Application of three-dimensional laser scanning technology in the design of pressure steel manifolds of Dubohua Hydropower Station in Pakistan Application of three-dimensional laser scanning technology in large-scale hydropower topographic survey Application research of three-dimensional design in Longkai Hydropower Station Application of three-axis deep mixing cement pile vertical anti-seepage wall in hydropower station engineering Optimization analysis of pressure pipeline lining support scheme of Sandaowan Hydropower Station Overall layout design of Sandaowan Hydropower Station Stress analysis of steel bifurcated pipes and lining structures of Bay Hydropower Station Sanliping Hydropower Station power generation optimization dispatch study Sanliping Hydropower Station generator stator core magnetization test Sanjianfang Hydropower Station light bulb tubular unit workshop design Superscript hydropower station turbine generator unit renovation upstream water Study on the impact of electrical engineering on flood forecasting of Maolgai Hydropower Station Overall model test of Shangmati Hydropower Station Review of the start-up and trial operation of Unit 1 of Bandi Hydropower Station Research on the claims management of owners of large-scale water conservancy and hydropower projects under the asymmetric information of observation design Exploration and practice of safety management of specialized hydropower maintenance companies Optimization and structural design of the arch dam of Dongkenling Hydropower Station Selection of main parameters of the turbine of Dongchuan Hydropower Station Research and evaluation of landslide stability of Dongchuan Hydropower Station Problems arising during unit installation and treatment in Dongwushi Hydropower Station efficiency expansion and capacity expansion project engineering design of Dongshuixia Hydropower Station Metal structure design of Dongshuixia Hydropower Station Lianghekou Hydropower Station 3^# Tunnel exit open line section conversion tunnel design optimization Earth construction Prediction analysis and countermeasures for construction difficulties of Lianghekou Hydropower Station Lianghekou Hydropower Station Qingdahe Barrage Curtain grouting test Lianghekou Hydropower Station Qingdahe Barrage Dam filling and rolling test Lianghekou Hydropower Station core wall anti-seepage material gravel mixing test Lianghekou Hydropower Station Seismic response of the high earth-rock dam of Kouikou Hydropower Station Seismic simulation Shaking table model test study Research on the joint regulation operation mode of two-stage series hydropower stations Analysis of the decoupling of China's rural hydropower and economic development Clean development mechanism of China's small hydropower China's hydropower development plan Objectives and safeguard measures Analysis of the greenhouse gas emission reduction effect of China's hydropower stations Experimental study on the shape of the surface hole flood discharge and energy dissipation building of Zhongbazi Hydropower Station Application of neutron non-destructive testing method in the volute detachment detection of Luding Hydropower Station Feasibility of saving power in small and medium-sized hydropower plants Measures: Several thoughts on the calculation of short-circuit current of the three-phase AC system of small and medium-sized hydropower stations. Risk analysis of temperature control of large-volume concrete in small and medium-sized hydropower stations. Application of completely unattended automation system in small and medium-sized hydropower stations in Zhaojiaya Hydropower Station. Completely unattended in small and medium-sized hydropower stations. Research on the manned automation system of small and medium-sized hydropower stations. Discussion on the completely unmanned auxiliary system of small and medium-sized hydropower stations. Analysis of the impact of hydrology and kinetic energy design of small and medium-sized hydropower stations on power generation. Research on the efficiency expansion and transformation of turbines in small and medium-sized hydropower stations. Electric power remote control of small and medium-sized hydropower stations. Existing problems and countermeasures in off-gas transmission The development direction of automation for small and medium-sized hydropower stations Calculation of lining reinforcement for non-circular pressurized tunnels in small and medium-sized hydropower stations Comprehensive strategies for small and medium-sized hydropower units to cope with grid primary frequency regulation and power generation plan assessment Equivalent model of small and medium-sized hydropower units Effectiveness quantitative evaluation method Structural characteristics of hollow jet discharge valve and its application in hydropower stations Application of hollow grouting soil anchor support in the reinforcement and management of high slopes of Xiluodu Hydropower Station Current status of small hydropower technical renovation project in Fengning County Analysis of the left bank slope stability of the comprehensive management (reconstruction) project of Fengman Hydropower Station Eco-environmental protection research Thoughts on coordinated development of operation management of Fengman Hydropower Station and surrounding environmentally sensitive areas Optimization of dam area monitoring reference network for Fengman Hydropower Station reconstruction project Soil and water conservation scheme design of Fengman Hydropower Station reconstruction project Environmental assessment work Key technology research and innovation of Fengtan Hydropower Station unit Efficiency testing and analysis of the current situation of the small hydropower industry in Lin'an City Investigation and development Exploration of the impact of the upstream river bank slope of Danba Hydropower Station on the hydraulic parameters of the intercepting dragon mouth Analysis of excavation of the diversion tunnel of Danba Hydropower Station Rheological analysis of surrounding rock during the period. Effect of covering layer treatment of Danba Hydropower Station on the settlement of the gate floor. Wudongde Hydropower Station’s “Relocation first, then construction” work plan. Technological transformation of Xiabaitan sand and gravel processing system of Wudongde Hydropower Station. Synchronization and positioning of the two-way gantry crane of Wudongde Hydropower Station. Position control technology Wudongde Hydropower Station feasibility study stage physical index investigation key points analysis Wudongde Hydropower Station right bank diversion tunnel deep hole full hole non-segmented consolidation grouting production test Wudongde Hydropower Station diversion tunnel poor geological tunnel section excavation support construction technology Wunonlong Hydropower Station Analysis of problems related to the installation of cylindrical valves in hydraulic turbines Wujiang Dongfeng Hydropower Station Spillway High Slope Stability Review Wujiang Shatuo Hydropower Station Turbine Selection Analysis Wujiang Yinpan Hydropower Station Factory Building Concrete Construction Temperature Control and Crack Prevention Wujiang Yinpan Hydropower Station Axial Flow Paddle Turbine Installation supervision and quality control of the power unit Analysis on the efficiency improvement of the hydraulic turbine of the Wujintang Hydropower Station Analysis of water leakage treatment measures in the expansion joint of the Wujinxia Hydropower Station Simulation calculation and prototype monitoring of the temperature of the concrete in the powerhouse building during the construction period of the Wujinxia Hydropower Station Bulb tubular unit of the Wujinxia Hydropower Station Analysis of initial operation problems, operating characteristics of the heavy hammer shut-down device of Wujin Gorge Hydropower Station, and design and implementation of an automatic water regime monitoring and reporting system in a watershed with insufficient test data - Taking the Nanou River Cascade Hydropower Project as an example, Letan Hydropower Station completion safety assessment, dam deformation monitoring data Analysis of Jiugong Cascade Hydropower Station Efficiency Expansion and Renovation of Jiugong Cascade Hydropower Station Turbine Generator Pressure Reduction Renovation of Jiugong Cascade Hydropower Station Brief Introduction to the Dispatching System of Jiugong Cascade Hydropower Station Optimization Design of Diversion Tunnel of Jiutiaoling Hydropower Station Design of Pressure Room of Jiutiaoling Hydropower Station Jiudianxia Hydropower Station 363kV GIS equipment installation and testing Jiudianxia Hydropower Station pressure steel pipe installation and welding Jiudianxia Hydropower Station computer monitoring system Tunnel excavation and initial support under the geological conditions of the ancient river bed of Xiangcheng Hydropower Station Application of the accident tree analysis method in the ecological risk assessment of water conservancy and hydropower project construction Selection of development plans and policy treatment of Ertan Hydropower Station Research on the coordination relationship between low excitation limit and loss of excitation protection of Ertan Hydropower Station Analysis and treatment of station generator thrust/down-cooler failure analysis and treatment of Ertan Hydropower Station generator transverse difference protection configuration and fixed value setting analysis of Ertan Hydropower Station electromechanical equipment installation and debugging technology Ertan Hydropower Station water cushion pond anti-scouring repair study Application of second-class leveling in Heihe Baoping Hydropower Station Yunnan Rural Hydropower has achieved outstanding results and has a long way to go and has a long way to go Yunnan Longdi Hydropower Station rear slope support reinforcement design Yunnan Toba Hydropower Station bridge arch The role of testing in box girder construction Stability analysis of surrounding rock in an underground cavern of a hydropower station in Yunnan Yunnan hydropower investment risk analysis Yunnan Lancang River Miaowei hydropower project soil yard comprehensive termite management Yunnan power grid cross-basin hydropower station group short-term optimal dispatch system design and implementation Yunnan Province SNJ hydropower station face rockfill dam main rockfill rolling test study Yunnan Province Lixianjiang Golantan Hydropower Station project fire protection water supply and ventilation design Yunnan Investigation and study on termite species in the earth material field of Miaowei Hydropower Project in Yunnan Province Analysis of economic benefits of Huangjioshu Hydropower Station project in Yunnan Province Study on the correlation between deformation modulus and wave speed of dam foundation rock mass of Yunnan Honghe Nansha Hydropower Station Technical transformation to systematically reduce oil temperature. Looking at the century-old development of my country's hydropower from the international hydropower development situation. Looking at the role of third-party quality inspection agencies from the current situation of my country's hydropower equipment quality. Optimizing the design of hydropower station waste slag sites from the perspective of soil and water conservation. A preliminary study on the sustainable development of the Genda Hydropower Station dam. Discussing the technical transformation of the generator excitation system of the Xubian Xianrenyan Hydropower Station with deep covering layer. Taking the lead in hydropower development to accelerate the low-carbon economic development of our province. The exhibition takes the construction of Pubugou Hydropower Station as the leader to realize the sustainable development of hydropower construction in the Dadu River Basin. Improved calculation method of small hydropower hydropower mainly for irrigation. Analysis and discussion of complete set of electromechanical equipment for hydropower stations with the design institute as the core. Development of hydropower in the main stream of Jinsha River to promote terrestrial ecological restoration of dry and hot valleys in the Jinsha River Basin. Application of invert slip form in the C3 standard project of Jinping Secondary Hydropower Station. Iran CHAMSHIR Water Design of the accident gate of the bottom hole of the power station and the spillway tunnel. Optimization analysis of the technical plan of Morasadra Hydropower Station in Iran. Study on the installation method of composite bend pipe of Rudbalo Restan Hydropower Station in Iran. Study on the causes and prevention measures of rock bursts in the diversion tunnel of the hydropower project in the upper reaches of the Yijiang River. Prioritizing the work focus and suggestions for hydropower development under optimized gate scheduling conditions. Exploration and estimation of the impact of hydropower projects on ecosystem productivity. Methods Application of low-voltage unit integrated control panel in rural hydropower Research on safety automation technology of low-voltage units and hydropower stations Selection and design of low-head small hydropower station units Selection of rated water heads of low-head hydropower stations Strategies for China's hydropower development from the perspective of low-carbon development Current status and suggestions of hydropower development in Yunnan under the background of low-carbon economy Analysis of causes and solutions to quality problems in hydropower installation in residential buildings Promoting emergency rescue“ * * "Team" construction to strengthen the operation and management of the hydropower force. Treatment measures and stability analysis of the collapse area of the pressure regulating shaft wall of the Egongbao Hydropower Station. Analysis of the stress field of a toppled deformation body of the Omi Hydropower Station. Historical lessons from the major safety accidents at the Sayang-Shushensk Hydropower Station in Russia. Practice and reflections on the efficiency expansion and transformation of rural hydropower in Baoding City. Application of information technology in Guangxi Research and Implementation Concept of Local Hydropower Management Application of Information Technology in Progress Control of Hydropower and Water Conservancy Exploration Project Hydraulic Machinery Design of Luoma Hydropower Station Shaft Broken Accident Analysis of Pianyan Hydropower Station Design and Optimization of Diversion Tunnel Lining Structural Design and Optimization of Pianqiao Hydropower Station First Hub Design of Pianqiao Hydropower Station Do a good job in small hydropower VAT reform Promote the development of rural electricity supply and use Do a good job in hydropower facilities Several thoughts on project cost management of industrial enterprises Simulation study of photovoltaic power station-hydropower station complementary power generation system Rapid economic construction technology of 200m high dam of Guangzhao Hydropower Station Discussion on dam foundation treatment design of Guangzhao Hydropower Station Dam concrete crack treatment of Guangzhao Hydropower Station RCC dam quality supervision Assembly and installation of barrel valve of Guangzhao Hydropower Station Application of process optical wireless broadband access technology in hydropower automation control Hub layout of Kyzyltas Hydropower Station Design of air-cushion pressure regulating chamber of Ketunnam Hydropower Station Concrete arch dam design of Kelin Hydropower Station Unit roof vibration analysis of the third-level hydropower station unit in the country Analysis of landslide treatment plan Application of year-round joint grouting technology in Laxiwa Hydropower Project Application of fully digital image monitoring system in Xiangjiaba Hydropower Station Application of whole-process investment control theory in Kushtayi Hydropower Station Thin-walled concrete construction technology of right bank cyclonic spillway tunnel of Gongboxia Hydropower Station Gongboxia Hydropower Station right bank anti-seepage panel test block concrete construction Gongbo Construction technology of diversion tunnel support of Gongboxia Hydropower Station Stability analysis of the installation foundation of the elevated gantry machine at the water inlet of the left bank spillway tunnel of Gongboxia Hydropower Station Comparative analysis of the cavitation characteristics of the cyclonic flow spillway tunnel of Gongboxia Hydropower Station Comparative analysis of the cavitation characteristics of the horizontal cyclonic flow spillway tunnel of Gongboxia Hydropower Station Thin-walled concrete construction of the horizontal cyclonic spillway tunnel of Gongboxia Hydropower Station Analysis of the causes of abnormal measurement values of the Gongboxia Hydropower Station face rockfill dam in the water level fluctuation area. Analysis of the causes of face cracks in the water level fluctuation area of the Gonger Hydropower Station. Manufacturing and welding of B780CF high-strength steel bifurcated pipes. Renovation of the hydroelectric generator set of Lanxiqiao Hydropower Station. About the impact of building a run-of-river hydropower station on the TSKEG River on the hydrological situation. About the hydropower new rural electrification county during the "Twelfth Five-Year Plan" period. Some suggestions on the construction and reconstruction of rural hydropower supporting power grids. Some thoughts on the design scheme of electromechanical equipment for rural hydropower efficiency enhancement and capacity expansion reconstruction projects. Discussions on the automation of Jilin hydropower distribution network. On the structural design technology and effects of the generators of Tiangongtang Hydropower Station. Thoughts on the post-environmental impact assessment of my country's hydropower cascade development. Thoughts on water conservancy and hydroelectric engineering. Discussion on grouting construction technology during project construction Discussion on water section measurement of water conservancy and hydropower projects Discussion on temporary transitional issues in land acquisition for hydropower project construction Discussion on several issues regarding the identification of liquefaction of saturated sandy soil in hydropower projects Discussion on the implementation of agency construction system in hydropower construction resettlement projects Regarding the application of cushioning measures for hydropower station reservoir area protection projects and related issues Discussion - Taking the Niyang River Duobu Hydropower Station Protection Project as an Example Regarding the Construction Cost Management of Oilfield Hydropower Engineering Projects Discussion on the Excitation Transformer Protection Configuration Plan for Extra Large Hydropower Stations Some Thoughts on Determining the Development Plan of Small Hydropower Stations - Taking the Keriya River Layi Cascade Power Station as an Example Guanshan Hydropower Station Efficiency Expansion and Renovation Guanzhou Hydropower Station Diversion Engineering Construction The project plan explores the application of the data flow mining method of association rule classification in hydropower unit fault diagnosis. Inner Mongolia Datang International Keshiketeng Dashimen Hydropower Station project metal structure design and layout internal control. The establishment and improvement of the Jinsha River Middle Reaches Hydropower Development Company. Re-analysis of the investment benefit factors of marine hydropower tidal power stations - project site selection and energy increase and consumption reduction technology. Discussion on the route and talk about rock bursts during the construction of hydropower projects. Research on the current situation of rural small and medium-sized water conservancy and hydropower facilities. Analysis and design of integrated automation system for rural small hydropower stations. Fuzzy comprehensive evaluation of the safety of rural small hydropower earth-rock dams. Long-term mechanism for rural hydropower to increase farmers' income. Research on rural hydropower power generation dispatching. Research on rural hydropower efficiency enhancement and capacity expansion. The reconstruction and construction has achieved initial results—— Taking the Yanjingkou Reservoir Power Station as an example, the technical work practice of rural hydropower efficiency enhancement and capacity expansion, a discussion on issues related to rural hydropower efficiency enhancement, capacity expansion, and transformation, a brief discussion on the scale design of rural hydropower efficiency enhancement, capacity expansion, and renovation, the early stage of pilot design work for rural hydropower efficiency enhancement, capacity expansion, and the implementation of rural hydropower efficiency enhancement and capacity expansion, relevant applicable technical standards, analysis of existing rural hydropower safety supervision Problems and Countermeasures - Taking the rural area of Kaihua County in western Zhejiang as an example. The impact of rural hydropower development on the river ecosystem and countermeasures. Performance evaluation method of rural hydropower transformation project. Research on rural hydropower ecological dispatch model and simulation study. Energy efficiency analysis of rural hydropower. Research and development of remote fault diagnosis system for low-voltage generators of rural hydropower stations. Transformation of excitation system of rural hydropower stations. Discussion on key technical issues for efficiency enhancement and capacity expansion of rural hydropower stations. Improvement of safety production standardization level of rural hydropower stations. Review practice and suggestions for safety production standardization of rural hydropower stations. Research on performance evaluation system of rural hydropower station reconstruction projects based on safety risk assessment and guarantee technology of rural hydropower stations - based on improved tomographic analysis method. Minimum discharge flow of rural hydropower stations. Study and explore the remanufacturing of electromechanical equipment in rural hydropower stations. Calculation of the probability of accidents of hydraulic buildings in rural hydropower stations. Comprehensive evaluation model of the operating status of hydraulic buildings in rural hydropower stations. Research on the four links that cannot be ignored in the economic operation of rural hydropower stations. Development and application of real-time monitoring and information management systems for rural hydropower operations. Rural hydropower (small hydropower) technical standards (1) Rural Hydropower (Small Hydropower) Technical Standards (2) Opportunities and benefits faced by rural green hydropower development Chonghuer Hydropower Station tailrace pipe structure calculation Chonghuer Hydropower Station factory roof outlet frame structure design Chonghuer Hydropower Station factory building design Experimental study of Chonghuer Hydropower Station flood discharge building Design of overflow surface hole of Chonghuer Hydropower Station Design of Chonghuer Hydropower Station roller compacted concrete gravity dam Chonghuer Hydropower Station Design scheme and implementation of the fish container transportation system The application of the impact echo wave energy method in the detection of hollow defects in steel pipes of a hydropower station The application of impact drilling in the construction of the gate well guide shaft of the Nuozhadu Hydropower Station Comparison and selection of hub layout plans of the Liangfengke Hydropower Station Spindle seal leakage failure analysis and technical renovation of the Phoenix Valley Hydropower Station Generator design of the Kailai Hydropower Station Turbine selection analysis Discussion on the daily optimal dispatching model of cascade hydropower stations under time-of-use electricity prices Discussion on the excavation construction technology of guide tunnels and medicine chambers in the rock plug section of Liujiaxia Hydropower Station Construction technology of rock plug blasting model test of Liujiaxia Hydropower Station Construction technology of anti-impact and wear-resistant concrete for sand drainage tunnels of Liujiaxia Hydropower Station Durability analysis of concrete buildings of Liujiaxia Hydropower Station Design and research on adding maintenance gates to the floodway Safety inspection and appraisal of the working gates of the spillway of the Liujiaxia Hydropower Station Safety inspection and appraisal of the ZONGOⅡ hydropower station in the Democratic Republic of the Congo ⅡSelection of dam site plan for hydropower station project ZONGO, Congo (DRC) Ⅱ Numerical calculation of hydraulic transition process of hydropower station project Construction diversion hydraulic calculation of Busuanga hydropower project in Congo (DRC) Innovative Nu River hydropower development resettlement method Discussion of main engineering geological issues and countermeasures of Gongguoqiao Hydropower Station Earth-rock cofferdam design of Gongguoqiao Hydropower Station diversion tunnel entrance concrete cofferdam demolition construction Gongguoqiao Hydropower Station project reservoir area resettlement Site planning Gongguoqiao Hydropower Station water diversion and power generation system construction channel layout Gongguoqiao Hydropower Station electromechanical equipment fire protection system design Gongguoqiao Hydropower Station unit model comparison and selection Gongguoqiao Hydropower Station flood discharge and energy dissipation building design Gongguoqiao Hydropower Station roller compacted concrete gravity dam design Increase the efficiency of small hydropower, expand capacity and renovation efforts to promote the construction of ecological civilization in Guangxi Strengthen the standardized management of small hydropower to improve water resource efficiency Yi strengthens the quality management of water conservancy and hydropower projects. A brief discussion on the important ways to strengthen the comprehensive supervision and design agency of hydropower projects. Strengthen the development and utilization of hydropower. Efforts to promote energy conservation and emission reduction. Thoughts on accelerating the development of small hydropower in Jiangshan City. Thoughts on accelerating hydropower development in the Tibet section of Lancang River. Application of reinforced gabion high retaining walls in the protection of ballast fields in hydropower projects. Design of pressure steel pipes of Buwei Hydropower Station in Ghana. Buwei Water in Ghana. Power station technology Water supply system selection and design Fuzzy comprehensive evaluation forecast of flood discharge atomization rainfall intensity of Ghana's Bouwe Hydropower Station Brief introduction to the design of phase modulation operation system of Bouwe Hydropower Station in Ghana Accelerating hydropower development in the Yalong River Basin Promoting the coordinated development of regional environment and economy Application of chemical grouting in anti-seepage and leakage plugging of hydraulic buildings of Baichuan Hydropower Station Application of chemical grouting technology in fault treatment of Laxiwa Hydropower Station Application of chemical grouting technology in Huanghuangping Hydropower Station Installation process of tailrace pipe of a hydropower station in Beijiang Research on permanent slope freezing damage control measures of a hydropower station in Beijiang Station Expansion Project Pressure Shaft Excavation and Initial Support Construction Technology Huaneng Gongguoqiao Hydropower Station Dam Corridor Leakage Treatment Construction Technology Application of the Minimum Electric Energy Investment Method in Determining the Installed Capacity of Northern Small Hydropower Stations Nanwei Hydropower Station Design Comments and Defect Treatment Design and Construction of the Main Structure of Nanwan River Level 2 Hydropower Station Nanshan Level 1 Hydropower Station High Head Thick Wall Pressure Steel Pipe Installation Technology Southern Europe Design and study of large-scale flat working gates for the flood discharge and scouring gate of Jiang II Hydropower Station Design of water diversion and power generation system of Nan Ou River V Hydropower Station Foundation grouting construction of Nanli 1-2 Hydropower Station clay core rockfill auxiliary dam Construction of Bozhou rural hydropower efficiency expansion and reconstruction problems and solutions Calculation and analysis of turbine installation elevation of Cachuela Hydropower Station Cachuela Hydropower Station diversion tunnel entrance slope stability analysis and treatment of Caldara Hydropower Station deadening pier Experimental study of Kara Hydropower Station upper dam site flat tunnel Seismic wave CT Detection of Kapuslang II Hydropower Station Power System Design Numerical Analysis of Surrounding Rock Stability of Underground Powerhouse for Kariba South Bank Hydropower Station Expansion Project Kamaya Hydropower Station Powerhouse Layout Optimization Design Indonesia ASAHAN Design Features of No.1 Hydropower Station Cleaner Application of Differential Tension Method in Lianghekou Hydropower Station Project Impact of Penstock Burst on Transient Flow in Parallel Surge Chamber Hydropower Station Study on Hydraulic Characteristics of Selection of Bottom Slope of Flood Release Tunnel of Hydropower Station Planning and Design of Shuanggou Hydropower Station Artificial Aggregate Gravel Screening System Hydropower station plant layout design Study on the construction diversion scheme of Cheng water inlet. Crack treatment design of the concrete dam of Shuanghe II Hydropower Station. Application of double-runner hydraulic generator unit in hydropower station. Application of raise drilling construction technology in deep shaft of hydropower project. Raise drilling rig in Mayina Water, Kazakhstan. Application of raise drilling rigs in power stations in the excavation of ultra-deep cable shafts at Sopradola Hydropower Station Research on the failure mechanism of reverse-dip layered rock slopes - taking the left bank slope of Jinping I Hydropower Station as an example to develop rural hydropower to serve people in mountainous areas - rural areas of Handan City Documentation on the development of hydropower construction, giving full play to the leading and core role of owners, building the Kushtayi Hydropower Station, dams and hydropower development in a changing world, application of frequency converters in rural hydropower stations, pressure forebay design of Gurtu River IV hydropower station, right bank plant of Mayari Hydropower Station in Cuba Fang Electric's one-time design and analysis of the turbine selection of the Mayari Hydropower Station in Cuba. The blasting and demolition of the second phase longitudinal cofferdam of the Jujiaba Hydropower Station. The application of reusable grouting pipes in the backfilling and contact grouting of the underground powerhouse on the right bank of the Xiangjiaba Hydropower Station. The development of electric power and hydropower in Taiwan. And its inspiration is the practice and exploration of three-dimensional finite element analysis of the upstream and downstream walls of the installation room of Yemao Hydropower Station in the project management of Ganzai Hydropower Station. Optimal design and equipment selection of hydraulic machinery for Geely Hydropower Station. Ji'an City's rural hydropower efficiency expansion and transformation work. Some understandings of Ji'an City Luotan Water Conservancy and Hydropower Management Bureau's institutional reform practice and reflections Analysis of Kyrgyzstan's foreign resources and hydropower cooperative development prospects Analysis of bifurcated pipe manufacturing technology of Gibb III Hydropower Station Design of unit automation control system of Gibulo Hydropower Station Gibulo Hydropower Overall layout of the station hub. Preparation and analysis of the in-plant economic operation plan of Jilin Taiwan I Hydropower Station. Technical design of diversion cofferdam for dam construction of Jilin Tai I Hydropower Station. Analysis of dam seepage observation data of Jilin Tai I Hydropower Station. Safety monitoring of Jilin Tai I Hydropower Station. Design and practice of automated system According to analysis, safety monitoring and design of concrete face gravel and rockfill dam of Jilin Tai Hydropower Station Problem study Analysis of surrounding rock geological conditions of low-pressure diversion tunnel of Jisha Hydropower Station Survey, design and experience of Jisha Hydropower Station safety monitoring design and data analysis of Jisha Hydropower Station plant area Layout and design of power generation system layout and design of Jisha Hydropower Station Water diversion power generation system layout Construction and design of Jisha Hydropower Station water diversion and surge tank design of Jisha Hydropower Station construction general layout design of Jisha Hydropower Station unit type and main parameter selection of Jisha Hydropower Station metal structure layout and design of Jisha Hydropower Station first hub barrage design of Jisha Hydropower Station first Diversion design for the construction of the central hub. Design and construction of the high-pressure pipelines of the Jisha Hydropower Station. Stress study on the concrete cladding of the high-voltage steel branch pipes of the Jisha Hydropower Station. Optimal design of the dam deformation monitoring scheme of the Jiniu Hydropower Station. Optimal design of the anti-seepage wall of the overlay foundation of the Diaojiangyan Hydropower Station. Design of Luohe secondary hydropower station hub, design of pressure forebay of Tumuxiuke Hydropower Station, flood control layout of water diversion channel of Tumuxiuke Hydropower Station, design of technical water supply system of Tumuxiuke Hydropower Station, unit regulation guarantee analysis and study of Tumuxiuke Hydropower Station, Xiangjiaba Hydropower Station 10 KV plant power system preparation and self-investment design optimization Xiangjiaba Hydropower Station 800MW unit rotor yoke thermal pad technology study Xiangjiaba Hydropower Station 800MW hydroelectric generator unit begins installation Supervision of the RCC construction technology test study of the second phase project of the Xiangjiaba Hydropower Station. Concrete blasting and demolition construction of the longitudinal cofferdam of the second phase of the Xiangjiaba Hydropower Station. Analysis of the reasons for the failure of the pressure build-up of the excitation system of the Xiangjiaba Hydropower Station. Cost control research in the procurement stage of electromechanical equipment for the ship lift of the Xiangjiaba Hydropower Station. Selection and installation of expansion joints of pressure steel pipes of the Xiangjiaba Hydropower Station. Xiangjiaba Hydropower Station generator rotor yoke stacking process. Technological improvement of the quality control of pre-split blasting on the right abutment slope of Xiangjiaba Hydropower Station. Drainage system of underground powerhouse on the right bank of Xiangjiaba Hydropower Station. Platform curtain grouting construction of underground powerhouse on the right bank of Xiangjiaba Hydropower Station. Elevation of 384m platform. Safety risk control of excavation construction of underground powerhouse of Xiangjiaba Hydropower Station. Shear test study on drilling and shearing test of rock mass of Xiangjiaba Hydropower Station dam foundation. Main problems in curtain grouting construction of dam foundation of Xiangjiaba Hydropower Station. and solution measures Fluid-solid coupling analysis of the deep anti-sliding stability of the dam foundation of Xiangjiaba Hydropower Station A brief analysis of the rock mass reinforcing grouting construction technology in the broken zone of the dam foundation of Xiangjiaba Hydropower Station Preliminary experimental study on the prestressed anchor cable technology for slope protection at the downstream of the canal. Concrete construction technology for the main body and diversion works of the left bank of the Xiangjiaba Hydropower Station. Rapid concrete construction of the left bank dam of the Xiangjiaba Hydropower Station. Stability performance analysis of the trial operation of the giant unit of the Xiangjiaba Hydropower Station. An abnormal analysis of the guide vane closing pattern in the low head overspeed test of the power station unit. Optimal design and analysis of the hydraulic device of the speed control system of the unit of the Xiangjiaba Hydropower Station. Analysis of the stator offline technology of the turbine generator of the Xiangjiaba Hydropower Station. Control of the end gap of the turbine movable guide vane of the Xiangjiaba Hydropower Station. Design and application of the template for the long and steep overflow surface of the release dam section of the Xiangjiaba Hydropower Station. Construction technology of the dam foundation anti-seepage wall in the release dam section of the Xiangjiaba Hydropower Station. Xiangjiaba Hydropower Station Flood Release and Energy Dissipation Building Maintenance Method after Floods Xiangjiaba Hydropower Station Flood Release Facilities Maintenance and Navigation Safety Analysis of Xiangjiaba Hydropower Station Monitoring System Design Characteristics of Xiangjiaba Hydropower Station Comprehensive Benefits and Key Technologies Operation and Maintenance of Xiangjiaba Hydropower Station Equipment and Facilities Structural Design of Xiangjiaba Hydropower Station Speed Regulator Pressure Oil Pump Outlet Combination Valve Structural Design of Xiangjiaba Hydropower Station Operation Duimapibao River Section Navigation Analysis of operational impact of Xiangjiaba Hydropower Station Limitation analysis of Xiangjiaba Hydropower Station operation management Exploration and research on the operation management of Xiangjiaba Hydropower Station Xiangjiaba Hydropower Station portal hoist hydraulic grab beam sealing modification Xiangjiaba Hydropower Station Mayanpo slope landslide early warning study Xiangjiaba Hydropower Station Mayanpo slope field test and stability study Wujun Hydropower Station masonry hyperbolic arch dam masonry construction technology Peripheral regulation of the main flood of the through-flow hydropower station Dynamic control of water level during flood season and comprehensive management of water and soil loss in Kekewusu Hydropower Station project in Jing County Preliminary study on the design characteristics of the underground powerhouse of Hadbut Hydropower Station Earthwork balance planning and design of Halajun Hydropower Station Model selection and structural design features of Halajun Hydropower Station Parameter selection and structural characteristics of hydraulic turbine parameter selection and structural characteristics of Xiangshui Hydropower Station expansion project of Xiangshui Hydropower Station Powerhouse and pressure regulating well blasting safety Controlling turbine selection for Xiangshui Hydropower Station expansion project A brief analysis of the feasibility of Xiangge Hydropower Station expansion Design of water conveyance open channel of Mailon Manvelay Hydropower Station Cameroon Manwelay Hydropower Station clay core rockfill dam design of filter material, transition material and rockfill material Shannipo Hydropower Station dam abutment cave-style excavation construction technology Shannipo Hydropower Station water cofferdam design and application Structural design of hydropower station turbine in the upper reaches of the Jialing River in Sichuan A study on the hydropower planning scheme for the section from the Sichuan-Shaanxi province boundary to Guangyuan Treatment and installation should be adapted to local conditions to promote the coordinated development of hydropower construction and shipping. Design of pressure steel manifolds of Tuanjie Hydropower Station. Application of consolidation grouting in high slope control of spillway of Miaowei Hydropower Station. Comparative study on the core competitiveness of domestic and foreign hydropower contractors. Comparison of domestic and foreign hydropower environment and sustainability evaluation standards. Comparison of domestic and foreign hydropower station surface hole arc gate manufacturing technology. Comparison of foreign small hydropower projects. International settlement. Selection and combination of methods, update and optimization of the construction plan of a foreign hydropower station, demonstration of LCU design of hydroelectric generator units of a foreign hydropower station, management experience of ecological flow of foreign hydropower stations, mechanical and electrical design issues of foreign hydropower station projects, discussion of the advantages of state-owned enterprise groups investing in small and medium-sized hydropower development and relevant suggestions, analysis of the loss situation and countermeasures of college graduates of state-owned hydropower construction enterprises, international EPC water Process Management of Equipment Supply for Power Projects Mechanical and Electrical Design and Engineering Management of International Hydropower Projects A Brief Discussion on Risk Management of International Hydropower Projects Key Risk Identification of International Hydropower General Contracting Projects Case Analysis Application of Image Fire Alarm System in Xiangjiaba Hydropower Station Construction Measurement and Setout Accuracy of the Double Curved Arch Dam of Yuanmanguan Hydropower Station Analysis of Geosynthetic Materials in the Construction of Core Wall Rockfill Dam of Guanyinyan Hydropower Station Application of geogrid reinforced soil slope construction technology in the Lianghekou Hydropower Station project Turning problems and processing of Pina Hydropower Station in Turkey Application of soil anchor nails in the slope support of the incoming road of Guanyinyan Hydropower Station Discussion on how to solve the problem of UTM projection deformation in water conservancy and hydropower projects Analysis of underground powerhouse rock wall crane beam structure design--Study of "Hydropower Station Powerhouse Design Code" * Xinde Dehumidification effect and effective dehumidification radius of underground diaphragm wall dehumidifiers Application of dewatering in foundation pit construction with underground diaphragm walls - taking the tail water power station of Xiangfan Power Plant as an example Application of ground beam piers in the pressure pipeline of Luoma Hydropower Station Application of geological radar in the diversion tunnel of Changheba Hydropower Station Application of geological radar detection method in the detection of voids in the extrusion side wall of Liyuan Hydropower Station Adhering to scientific development and advancement Enterprise transformation accelerates the pace of hydropower development in the Dadu River Basin. Current situation and development of small hydropower in Tanzania. Application of vertical line system in monitoring the deformation of the arch dam of Laxiwa Hydropower Station. Overview of concrete construction technology of Tekeze Hydropower Station in Ethiopia. Study on the sealing performance of three-eccentric hydropower main control butterfly valve based on Abaqus. Small hydropower information management system based on Android platform based on ANP-FCE model. Environmental impact assessment of hydropower projects based on the ANSYS-FLAC^3D platform. Complex hydropower project modeling technology based on ANSYS. Analysis of external insulation and heat transfer characteristics of hydropower station factory building exterior walls based on ANSYS. Design and improvement of lining steel lining of Wudongde Hydropower Station based on ANSYS. Analysis of torsional vibration of a certain hydropower deep hole drill pipe column based on ANSYS. Based on ARM embedded hydropower station monitoring system. Design of measurement and control unit based on CATIA three-dimensional platform Design of hydropower engineering plan monitoring network Application of three-dimensional bifurcated pipe design in hydropower stations based on CATIA Research on flow characteristics of pressure forebay of hydropower station based on CFD Stability analysis of high slope of stilling tank of a hydropower station based on DDA Stability evaluation of open channel slope of a certain hydropower station based on FLAC-(3D) strength reduction method Based on GE VersaMax Example analysis of PLC hydropower station control system GIS-based spatial simulation method of air temperature in reservoir area of large-scale hydropower projects GIS-based hydropower planning terrestrial ecological environment assessment scope division Application of geological 3D modeling technology in hydropower projects based on GoCAD platform Nonlinear stability analysis of hydropower stations with surge chambers based on hopf bifurcation theory Energy-saving and consumption reduction methods for aggregate production in hydropower projects based on HSM MATLAB-based air gap data analysis and processing of hydropower units based on Pro/ Engineer's hydropower unit simulation technology research based on PULSE analysis system hydropower unit vibration monitoring system calibration RFID-based personnel positioning management system in Xiangjiaba Hydropower Station SOA-based water conservancy and hydropower digital library architecture research based on SWOT analysis hydropower project immigrant urbanization resettlement design based on VRML and CAXA virtual hydropower station water supply system design and implementation of hydropower station virtual gas supply system based on VRML based on the Web Design and implementation of provincial, prefecture and county integrated small hydropower management system based on GIS Hydropower project progress risk assessment based on WSR-gray clustering comprehensive method Research on hydropower station comprehensive testing system based on Ethernet Ethernet-based hydropower station gate automatic control system Discussion on the organizational transformation model of hydropower design unit based on design as the leader EPC - taking a certain hydropower plant An example of the organization transformation of the Institute of Engineering Engineering through EPC. Analysis of the deflection and deformation law of the dam panel of Shuibuya Hydropower Station based on fiber optic gyroscope. Three-dimensional finite element analysis of the slope engineering of a water diversion system of a hydropower station based on unloading theory. Fault diagnosis of hydropower units based on a combination of multiple classifiers. Identification of dynamic loads of hydropower stations based on wavelet analysis. Water conservancy and hydropower engineering based on the analytic hierarchy process. A. D. Research on risk assessment method of HALL system. Substation of hydropower station power rapid control system based on embedded devices to realize performance evaluation of hydropower construction enterprises based on balanced scorecard. Status identification of hydropower units based on support vector machine method. Research on scheduling rules of cascade hydropower station group based on improved artificial neural network. Research on coordination control strategy between cascade hydropower station groups based on improved synchronization time method. Research on optimal dispatch model and algorithm of hydropower station based on improved genetic algorithm. Data-driven integrated management and operation platform of hydropower station. Small and medium-sized hydropower stations based on intelligent instruments. Auxiliary equipment monitoring GIS protection and monitoring integrated system of Xiangjiaba Hydropower Station based on intelligent control Research on joint power generation model of cascade hydropower station based on minimum water consumption Research on unit load distribution of Shuibuya Hydropower Station based on unit operation safety Based on on-campus productive CNC machining training Exploration on teaching reform - taking Zhejiang Water Conservancy and Hydropower College as an example. Hydropower station automatic control system design based on root locus method. Research on online fault diagnosis of hydropower units based on fuzzy theory and multi-agent. Research on LCU power regulation of hydropower station based on fuzzy adaptive PID. Construction and implementation of a differentiated assessment and management system for optimal hydropower dispatching based on position control coefficients. Overlay creep based on measured displacement data of water conservancy and hydropower projects. Analysis of economic benefits of Gezhouba Hydropower Station based on head deviation. Short-term optimal dispatching of cascade hydropower stations based on mixed integer linear programming. Hydropower project construction quality evaluation based on entropy weighted extension matter element Mid- and long-term optimized operation of hydropower stations based on power system costs Research on outsourcing compensation of hydropower resources in Sichuan based on carbon trading market Research on the deformation evolution of the inverted slope of a hydropower station bank based on discrete elements Based on Xixia Institute of Reaction Research on short-term peak-shaving operation of Xiaolangdi Hydropower Station based on adjustment compensation. Research on data processing method of hydropower unit cranking based on genetic algorithm. Research on optimized in-plant operation of Manwan Hydropower Station based on genetic algorithm. Research on compilation of resettlement implementation plan for hydropower projects based on long-term compensation. Analysis of the seismic performance of hydropower station buildings using the static elastic-plastic method Preliminary study on ecological dispatch of hydropower stations based on fish protection Application of rockfill concrete in the diversion cofferdam of Wudongde Hydropower Station Application of rockfill concrete in the Geely Hydropower Station project Before the cooperative development of water resources and hydropower in Tajikistan Scenario analysis of Tarilega Hydropower Station dam anti-seepage wall impact drilling and pouring test plan Impact of value-added tax transformation on hydropower stations, wind farms, and photovoltaic power stations The important role of efficiency expansion and transformation in rural small hydropower The application of acoustic emission technology in condition monitoring and fault diagnosis of hydropower units Research review: Application of acoustic wave testing in rock mass quality evaluation of Baoping Hydropower Station. Application of composite geomembrane in anti-seepage system of hydropower station cofferdam. Electrical primary design of Charlotte Hydropower Station. Application of magnesium oxide roller compacted concrete technology in Huanghuazhai Hydropower Station. Joint pouring of multiple cable cranes. Application of art in the concrete pouring of the dam of Xiaowan Hydropower Station Design and research on the reconstruction of National Highway 318 in the reservoir area of Duobu Hydropower Station Three-dimensional numerical simulation of the impedance coefficient of the pressure regulating chamber of a multi-unit hydropower station Enlightenment of turbine capacity expansion and reconstruction of hydropower stations in sediment-rich rivers Relocation of large and medium-sized water conservancy and hydropower projects Thoughts on the comprehensive supervision of support for the later stage of the civil society. Thoughts on the definition of population for off-line expansion of large and medium-sized water conservancy and hydropower projects. Discussion on land ownership issues in land acquisition for construction of large and medium-sized hydropower projects. Discussion on design changes in the implementation of resettlement of large and medium-sized hydropower projects. Discussion on the selection of rated water heads for large and medium-sized hydropower stations. Construction of concrete anti-seepage wall of Cangshui Power Station Defining the scope of flooding treatment in the reservoir area of Daxingchuan Hydropower Station Vigorously developing small hydropower resources in Jilin Province to serve the construction of new socialist countryside Safety monitoring and design of Dahua Hydropower Station expansion project Causes of abnormal horizontal displacement of the overflow dam section of Dahua Hydropower Station Analysis of Dahuaqiao Hydropower Station concrete artificial aggregate source selection and application of large-diameter drilling in soil survey for hydropower projects in Tibet. Datang Jicun Hydropower Station axial flow propeller hydraulic unit prototype test and analysis of large-scale water conservancy and hydropower project construction management mechanism. Exploration of large-scale hydropower- Prediction of casting defects in upper crown castings of Francis units and prevention of high-variation protection configuration and setting calculation related issues in large hydropower plants Research on the design and process optimization of sector-shaped compound die for large hydropower stator Water Influence Factors and Countermeasures Thoughts on Selection of Concrete Aggregate Sources for Large Hydropower Projects Joint Bearing Analysis of Water-Filled and Pressure-Preserving Volute Structures of Large Hydropower Stations Research Review on Vibration Issues of Large Hydropower Stations’ Power Buildings Research Review of Joint Unit Wiring Main Protection Configuration Scheme of Generator-Transformer Groups of Large Hydropower Stations Numerical analysis of hydraulic vibration of underground powerhouses of power stations Three-dimensional seismic response time domain analysis of underground cavern groups of large hydropower stations Discussion on grounding technology of large hydropower stations Grounding resistance test of large hydropower stations Three-dimensional numerical simulation study of tunnel excavation construction of large hydropower stations Large water inlet butterfly valve Application in hydropower stations Application of large-scale steel formwork trolleys in the tailwater project of Xiangjiaba Hydropower Station Application of intelligent assembly and welding machines for large-scale steel pipes in on-site installation of pressure steel pipes in Huanghuangping Hydropower Station Problems and countermeasures in the development of small hydropower in the Linxia section of the Daxia River Basin Transformer protection device renovation of the unit hydraulic device control system of the Daxia Hydropower Station. Construction of the roller compacted concrete gravity dam of the Daxia Hydropower Station. Research on the efficiency improvement and capacity increase of the water turbine of the Daguangba Hydropower Station. Smooth blasting technology of the diversion tunnel of the Dasangyuan Hydropower Station. Analysis of the dynamic characteristics of the powerhouse structure of the Daqiao Hydropower Station. Liangzi Hydropower Station Safety Production Management Review and Summary of Mechanical and Electrical Design of Dashaba Reservoir Hydropower Station Behind Dashaba Hydropower Station Construction of Dashaba Hydropower Station Flood Season Diversion Dam Surface Water Crossing Design Research on the Adjustment Guarantee Measures Plan of Daheyan River Head Hydropower Station Study on the Hydraulic Transition Process of the Water Diversion System of Daheyan River Head Hydropower Station Analysis and study on the model test of water diversion and power generation system of large flow and medium-low head hydropower stations. Application of large flow water inrush sealing combined with uncovered heavy-duty high-pressure anti-seepage consolidation grouting in Jinping II Hydropower Station. Hydraulic study on the upstream surge chamber of Dadu River Danba Hydropower Station. Deep coverage of Dadu River Anning Hydropower Station. Overview of layer exploration technology and methods Design study of fish passages at the first-level hydropower station of Dadu River Zhenba Research and practice of construction environment management of hydropower development in Dadu River Basin. Practical analysis of scientific development of hydropower in Dadu River Basin. Application and practice of lean maintenance of hydropower stations in Dadu River Basin. Three-dimensional finite element seepage analysis of earth-rock cofferdam of Dadu River Jinchuan Hydropower Station. Diversion tunnel of Dadu River Huanghuangping Hydropower Station. Inlet cofferdam removal and blasting design Analysis of anti-sand wear measures for turbines of Dayingjiang IV Hydropower Station Analysis of black start scheme of Dayingjiang IV Hydropower Station Application of large-diameter hydraulic steel formwork trolley in the spillway tunnel project of Nanli 1-2 Hydropower Station Overall design and shaft type spillway of Dashimen Hydropower Station Application of roller-compacted asphalt concrete mix proportion test and application in Dashimen Hydropower Station Crack treatment of powerhouse of Dazhu Hydropower Station Anti-seepage treatment of powerhouse foundation pit cofferdam of Dahuashui Hydropower Station construction of anti-seepage curtain grouting construction on the left bank of Dahuashui Hydropower Station Construction optimization of water diversion and power generation system of Dahuashui Hydropower Station Program overview Analysis of weak interlayers of Datangxia Hydropower Station Key issues in sediment design of Datonghe Tianwanggou Hydropower Station Discussion on the application of natural sand and gravel aggregate roller compacted concrete in the dam of Lianhuatai Hydropower Station Tianshengqiao-level Hydropower Station TSQ-1/C3 contract award delay cost compensation case analysis Analysis of the stress and strain of the dam panel of Tianshengqiao I Hydropower Station. Analysis of the causes of oil rejection in the water guide bearings of Tianshengqiao II Hydropower Station and its treatment. Analysis of surrounding rock deformation in the No. 3 construction branch tunnel of the Ceiling Hydropower Station. Analysis of water seepage sources in the No. 4 construction branch tunnel of the Ceiling Hydropower Station. GPS of the Ceiling Hydropower Station. Planar construction control network construction design Ceiling hydropower station upstream cofferdam design and construction Ceiling hydropower station artificial sand and gravel processing system design and renovation Geological analysis of emergency treatment measures for excavation of the slope behind the ceiling hydropower station factory building Stability analysis and support of the slope behind the ceiling hydropower station building Design Ceiling Hydropower Station Plant Layout and Structural Design Ceiling Hydropower Station Dam Site Engineering Geological Conditions Evaluation Ceiling Hydropower Station Dam Foundation Fault Zone Shallow Hole Controlled Blasting Construction Ceiling Hydropower Station Diversion Tunnel Design Ceiling Hydropower Station Diversion Tunnel Construction Technology Ceiling Hydropower Station Diversion Tunnel Design Ceiling Hydropower Station Arch Dam Foundation Surface Selection and Optimization Adjustment Study Ceiling Hydropower Station Arch Dam Concrete Mix Ratio Design and Application Ceiling Hydropower Station Hub Layout Research Ceiling Hydropower Station Water and Soil Conservation Measures Design Ceiling Hydropower Station Water Resources Analysis and Research Ceiling Hydropower Station Water Resources Analysis and Research Design of ceiling hydropower station flood discharge and energy dissipation building Ceiling hydropower station electrical primary design Key technical issues of ceiling hydropower station Monitoring system design of ceiling hydropower station Research on temperature control technology of roller compacted concrete hyperbolic arch dam of ceiling hydropower station Stable cross-section analysis and analysis of pressure regulating shaft of ceiling hydropower station Optimizing research on the layout and design of metal structures of ceiling hydropower stations. Quality control of RCC construction of dams in high temperature seasons of ceiling hydropower stations. Analysis of dam foundation pressure rise of Taipingshao Hydropower Station. Research on construction of water regulation automation system of Taipingwan Hydropower Station. Laying solid foundation. Innovative management. Efforts to build a world-class company.: Design of the pressure forebay of the Kuitun River tenth-level hydropower station in hydropower projects. Analysis and treatment of the causes of burning of the water guide bearings of the Olujie Hydropower Station. Study on the evolution dynamics of high and steep slopes in the Rumei Hydropower Station work area. Treatment of the collapse of the diversion tunnel of the Niangyong Hydropower Station. Research on the current situation and countermeasures of the development of small hydropower in Wucheng District. Xiaofeng Water Renovation of the computer monitoring system of the power station. Selection of concrete aggregate materials for the Mendigou Hydropower Station project. Design of the debris flow protection project in the hot water ditch of the Mendigou Hydropower Station. Application of safety monitoring in the emergency rescue and rescue of landslides in the Jinping II Hydropower Station. Communication Department of Mabubas Hydropower Station in Angola. Introduction to system design Feasibility analysis of Ancheng Hydropower Station using control gates for diversion canal regulation and storage operation Anhui Liubo Hydropower Station roller compacted concrete arch dam crack treatment Anmin Hydropower Station dam safety monitoring data analysis Improving the safety system of the Kushtayi Hydropower Project Establishing a green environmental protection demonstration New Image of the Power Station Research and Application of Underflow Energy Dissipation Technology for Guandi Hydropower Station RCC Dam Flood Release Experimental study on layer construction technology Research on the driving effect of Guandi Hydropower Station on the economy of Sichuan Province Study on the construction period claim analysis of the Sanduiyan contract section of the external transportation highway of Guandi Hydropower Station Analysis on the consolidation grouting results of the tailwater outlet of Guandi Hydropower Station Steel form trolley concrete lining construction of the tailrace tunnel of Guandi Hydropower Station Technology Guandi Hydropower Station Rock Anchor Beam Excavation Construction Quality Control Guandi Hydropower Station Left Bank Dam Shoulder Excavation Supervision Quality Control Guandi Hydropower Station Left Bank Diversion Tunnel Gradient Section Excavation Construction Guandi Hydropower Station Overflow Surface Hole Long Gate Pier Jack-up Sliding Form Design and Construction Guandi Hydropower Station Roller Compacted Concrete Warehousing Brief description of the construction quality control of roller compacted concrete in Guandi Hydropower Station. Experimental study on the mix ratio of roller compacted concrete in Guandi Hydropower Station. Treatment measures for collapse at the entrance section of the Heishui River Tunnel in Guandi Hydropower Station. Comparison of construction methods of pressure pipes in Baoxing Hydropower Station. Treatment plan for the 5# open channel landslide in Baotan Hydropower Station. Comparison of the cranking of Unit 2 of Baoshan Hydropower Station Application of governor modification of Baoshan Hydropower Station Comparison of generators and ancillary equipment of Baolingsi Hydropower Station Capacity expansion and reconstruction analysis An example of analysis of local settlement and displacement data. An analysis of the changes and characteristics of old and new quotas and regulations for water conservancy and hydropower projects in Gansu Province. Risks and control countermeasures faced by the implementation of the Beiben hydropower project. A method to realize computer monitoring and remote diagnosis and maintenance of hydropower stations. Implementing "same network, same price" is a way for farmers to implement "same network, same price". Key measures to develop village hydropower and increase farmers' income. Practice and experience of technical transformation of Xuanpingxi II Hydropower Station. Application and research of wide-tail pier in Badi Hydropower Station. Research on voltage regulation strategy of distribution network in mountainous areas rich in small hydropower. Research on anti-scouring and abrasion protection of concrete on the overflow surface of Fuchunjiang Hydropower Station. Test construction quality analysis of the concrete face rockfill dam of Chahan Wusu Hydropower Station Analysis of settlement and deformation patterns of the concrete face rockfill dam of Chahan Wusu Hydropower Station Understanding of the revision of Article 51 of the "Regulations on Land Acquisition Compensation and Resettlement for the Construction of Large and Medium-sized Water Conservancy and Hydropower Projects" Understanding of the "Gansu Province Water Conservancy" Analysis of the changes in "Regulations on Preparation of Hydropower Engineering Design Estimates (2013 Edition)" Thoughts on the development of Wufeng Hydropower Industry Understanding of seismic geology and engineering anti-seismic issues in Nujiang hydropower development Understanding of promoting the main design unit to carry out general contracting of hydropower resettlement projects The application of bid management in the project management of Kushtayi Hydropower Station. Understanding of cost management and control of water conservancy and hydropower project construction projects. Discussion on the construction design of the large corbel formwork system of hydropower projects. Discussion on the acceptance of land acquisition and resettlement for hydropower project construction. Design files of hydropower projects. Understanding and thinking of editors and researchers Thoughts on the safety production evaluation of hydropower project construction Re-understanding of the three major compensation mechanisms in hydropower development Analysis of several issues in hydropower development Thoughts on the construction contract management of hydropower construction enterprises Thoughts on prevention and control measures for occupational hazards in hydropower construction Several thoughts on the management of science and technology projects in hydropower research institutes. Analysis on the technical and economic comparison of hydropower station buildings. Discussion on the design of shallow-buried beam-type buttresses for pressure exposed pipes of hydropower stations. Implementing long-term compensation for immigrants year by year is a major measure for hydropower development and construction of people's livelihood projects. Optimization of Siping Hydropower Station Scheduling model of Siping Hydropower Station concrete face rockfill dam extrusion side wall construction technology Design of detonation tube detonation network and its application in the excavation of Laxiwa Hydropower Station Technical transformation of Shouning County Kengdou Hydropower Station to improve power generation output Xiaoyunfeng Hydropower Station right bank auxiliary dam water seepage treatment Xiaoguanzi Hydropower Station Unit Technology Solution to the Easy-to-Clog Problem of Water Filters in the Water Supply System of Xiaonanhai Hydropower Station Impact of Daily Adjustment of Unsteady Flow on Navigation Application of Miniature Indoor Metal Armored Removable Switchgear in Hydropower Station Renovation Special Issues in the Design of Small Isolated Hydropower Stations Small Water Conservancy and Hydropower Projects Tunnel collapse treatment Small hydropower project EPC mode unified supply material write-off management analysis Small hydropower station A new excitation method Small hydropower station cooling system renovation How to safely handle floods in small hydropower stations Several issues that should be paid attention to in the technical renovation of small hydropower stations Discussion on applicable technologies for renewal and renovation Thoughts on the design of electromechanical parts of small hydropower stations Design and application of key technologies for overflow and drop shafts of small hydropower stations Discussion on the ecological flow determination method of small hydropower stations Application of comprehensive automated management of small hydropower stations Reasonable setting of pressure regulating wells of small hydropower stations Technical transformation and selection of governors for small hydropower stations. Exploration and research on black-start emergency plans for small hydropower stations. Adjustment and maintenance calculations in the early working stages of small riverbed hydropower stations. Discussion on the primary electrical design of Xiaoshankou secondary hydropower station. Problems and solutions that occurred during the debugging of the governor of the first unit of Xiaoxia Hydropower Station. Solution: Efficiency enhancement and capacity expansion of the Xiaofeng Hydropower Station. Research on key technologies for measuring ecological benefits of small hydropower for fuel generation project. Research on environmental impact and policy mechanism of small hydropower for fuel generation project. Research on small hydropower's promotion of rural economic development in Sichuan. The necessity and economics of small hydropower's participation in power grid peak-shaving operations. Sexual analysis of overvoltage problems existing in the co-line of small hydropower generation and supply Analysis and solutions to the promotion and application of small hydropower in tapping potential in the energy field Small hydropower efficiency enhancement and capacity expansion to benefit the power grid Analysis of the impact of small hydropower on the utilization rate of 35kV transformer equipment Assessment of small hydropower construction investment control Small hydropower construction Application of project economic evaluation procedures Impact of small hydropower development on river environment Several key issues that should be paid attention to in small hydropower investment Improvement of small hydropower water energy calculation methods Key issues and protection strategies for small hydropower environmental impact Discussion of data preprocessing methods for small hydropower ecological runoff calculation A preliminary study on the energy-saving transformation technology of small hydropower grids. Historical achievements and modernization of small hydropower. Criteria for the output capacity of small hydropower lines. Research on the economics of small hydropower and safety of electrical equipment. Research on the comprehensive benefits of small hydropower. Design and application of integrated automation systems for small hydropower. Design and application of small hydropower flood control early warning systems. Cultivation and development of strategic emerging industries in the field of small hydropower. Analysis of similarities, differences and characteristics of turbine speed regulators of Xiaolangdi and Xixiayuan Hydropower Stations. Prototype efficiency test of hydraulic turbine generator units of Xiaolangdi Hydropower Station. Application and management of automatic power generation control of Xiaolangdi Hydropower Station after Xiaowan and Nuozhadu are put into operation. Research on Yunnan Hydropower Operation Mode Xiaowan Hydropower Plant Exploration and Practice of Creating a World-class Hydropower Plant Xiaowan Hydropower Project Dam Diversion Bottom Hole Sealing Construction Technology Xiaowan Hydropower Project Construction Subcontracting Management Analysis and Prevention of Environmental Fire Faults of the 30t Cable Hoist Motor of Xiaowan Hydropower Station Measures Xiaowan Hydropower Station 30t cable generator group operation management Xiaowan Hydropower Station downstream cofferdam controllable curtain grouting productive test technology Xiaowan Hydropower Station mid-bottom hoist hoist chamber cast-in-place beam construction Xiaowan Hydropower Station typical electrical accident hidden danger analysis and solutions Xiaowan Hydropower Station hyperbolic arch dam construction Engineering Measurement Control Overview of chemical grouting technology for crack treatment of Xiaowan Hydropower Station hyperbolic arch dam Construction review of Xiaowan Hydropower Station right bank dam bank section Hole concrete construction Xiaowan Hydropower Station dam foundation consolidation and grouting construction Quality control Xiaowan Hydropower Station dam foundation excavation construction Quality management Xiaowan Hydropower Station dam abutment resistance body Consolidation grouting construction Xiaowan Hydropower Station dam abutment resistance body Geological defect treatment and reinforcement construction Xiaowan Hydropower Station dam abutment resistance body development Excavation and blasting test Xiaowan Hydropower Station dam top gantry prestressed girder construction Xiaowan Hydropower Station vertical line automatic monitoring system application and analysis of Xiaowan Hydropower Station accumulation slope support and anchor cable technology application Xiaowan Hydropower Station dam chamber surface insulation measures effect analysis of Xiaowan Hydropower Station dam arc gate Hydraulic hoist installation and commissioning Xiaowan Hydropower Station dam construction quality management Xiaowan Hydropower Station dam construction progress management Xiaowan Hydropower Station dam concrete outlet temperature control measures Xiaowan Hydropower Station diversion bottom hole sealing concrete construction Xiaowan Hydropower Station tailrace tunnel exit gradient section lining Challenges and considerations in concrete construction of the Xiaowan Hydropower Station project Equipment management and quality control of the mixing system on the left bank of the Xiaowan Hydropower Station Concrete crack treatment for the diversion and power generation system of the Xiaowan Hydropower Station Gate moving water closed door test Xiaowan Hydropower Station vent bottom hole inspection door integral door slot installation technology research and application Xiaowan Hydropower Station civilized engineering project creation Xiaowan Hydropower Station unit start-up conditions optimization measures Discussion of Xiaowan Hydropower Station reservoir bank management Discussion of Xiaowan Hydropower Station reservoir water storage and Summary of turbine performance testing and technical transformation of Kuku Stabilization Xiaowan Hydropower Station. Some experiences in management of completion data of Xiaowan Hydropower Station spillway tunnel project. Excavation and construction of Longtou section of Xiaowan Hydropower Station spillway tunnel project. Summary of anti-shock and wear-resistant concrete construction of Xiaowan Hydropower Station spillway tunnel. Xiaowan Water Power station deep hole curtain grouting hole inclination control technology Xiaowan Hydropower Station concrete production and transportation system refined management Xiaowan Hydropower Station extra-high arch dam joint grouting construction technology Xiaowan Hydropower Station extra-high arch dam construction technology Xiaowan Hydropower Station extra-high arch dam concrete water cooling technology Xiaowan Hydropower Station Analysis and research on the water content of the sand silo of the shaft type structure of the hydropower station. Xiaowan Hydropower Station unified supply material write-off management. Xiaowan Hydropower Station cable hoist intrinsic safety protection system application. Xiaowan Hydropower Station super large sprocket door installation. Xiaowan Hydropower Station slope anchor cable construction. Xiaowan Hydropower Station water inlet vertical slope excavation. Support construction technology Xiaowan Hydropower Station gate pier Prestressed anchor cable construction Xiaowan Hydropower Station high arch dam post-dam construction Traffic planning design and application Xiaowan Hydropower Station arch dam and dam abutment slope stability analysis under high water level operation Xiaoshixia Hydropower Station upstream cofferdam design Xiaoshixia Hydropower Station diversion Simultaneous deep hole spillway energy dissipation engineering optimization test Xiaoshixia Hydropower Station spillway energy dissipation engineering optimization test Xiaoshixia Hydropower Station surface hole spillway model test study Xiaoshixia Hydropower Station face rockfill dam extrusion side wall low temperature seasonal construction Nilek Level 1 Hydropower Station channel asphalt concrete anti-seepage panel lining Masonry construction technology Nielji Hydropower Station generator stator iron loss test Neelam-Jilam Hydropower Station project air conditioning system design parameter selection Practice and exploration of general contract management of a hydropower station project in Nepal Rainy season construction safety management Tailwater power station connection well dam Water diversion technology transformation and energy saving analysis Application of analytic hierarchy process in selecting hydropower station installed capacity under the condition of tail water overlapping changes in the study of the international impact of cross-border river hydropower development Simulation study of lightning protection measures for 10kV lines and equipment in mountainous hydropower stations Shankou hydropower station factory building design Shankou Analysis and solution of overheating failure of the isolating switch of the hydropower station generator outlet Dam safety monitoring design of the Shankou Hydropower Station Design of the diversion tunnel of the Shankou Hydropower Station Roughness selection and flow capacity analysis Grouting treatment of concrete gravity dam foundation, dam body temperature monitoring data analysis of roller compacted concrete dam section of Shankou Hydropower Station, analysis of initial seepage data of clay core dam section of Shankou Hydropower Station, Shanxiu Hydropower Station plant layout design, Shanmei Hydropower Station 3^# unit excitation system renovation, Shanmei Hydropower Station Dynamic balancing test of No. 3 turbine generator unit Shanmei Hydropower Station underground powerhouse turbine main valve technical renovation Chaxi River I Hydropower Station dam site comparison design Gangqu River I Hydropower Station diversion tunnel excavation and support construction Yantan Hydropower Station three-dimensional geological modeling technology research Yantan Hydropower Station transformer Protection hazard analysis and improvement plan Yantan Hydropower Station expansion project 500kV side access switch station mode selection Yantan Hydropower Station expansion project drainage system design Yantan Hydropower Station expansion project turbine runner characteristic parameters optimization and on-site manufacturing Yuejiahe Secondary Hydropower Station spandrel trough edge Slope Stability Analysis Minxian Small Hydropower Development Brief Analysis of Xiajiang Hydropower Station Large Bulb Tubular Turbine Technology Brief Analysis of Current Situation of Rural Hydropower Stations in Shengzhou City Application of Industrial Digital Close-up Photogrammetry System in Installation and Inspection of Ship Lift Nut Column at Xiangjiaba Hydropower Station Engineering Consulting Enterprises in the International Several issues worth paying attention to in the development of hydropower projects. Exploration and practice of the quantity method in construction claims cases of water conservancy and hydropower projects. The impact of the diversion tunnel of the Xi'an Hydropower Station in Zuoquan County on the proximity construction of the existing railway tunnel. The construction diversion design of the Zuojiang Shanxiu Hydropower Station project. The giant cascade hydropower station. Design and implementation of cluster remote centralized monitoring system Innovation in operation and maintenance management of turbine generators of giant hydropower stations Design and construction technology of sliding formwork for pressure regulating shafts of NJ Hydropower Project in Pakistan Analysis of erosion and siltation balance of tailrace canal of Tangsa Hydropower Station in Pakistan Neelam-Ghilam Hydropower Design of primary support for TBM installation hole in the project, design of weir dam and water inlet curtain grouting of Dubohua Hydropower Station in Pakistan, design of underground sedimentation tank for Dubohua Hydropower Station in Pakistan, design of weir (dam) foundation treatment of Dubohua Hydropower Station in Pakistan Station engineering dam design Overview of Pakistan's Dubohua Hydropower Station Tunnel and penstock connection section Finite element structural analysis of Pakistan's Dubohua Hydropower Station's generator guide bearing tile burning accident analysis of Pakistan's hydropower construction market Investment risk prevention Brief discussion on Pakistan's Khanhua Hydropower Station project Dam design Pakistan's Khanhua Hydropower Station project Discharge building design Pakistan's Khanhua Hydropower Station project shaft semi-underground factory design Pakistan's Gao Mozan Hydropower Station Electrical primary design Barota Hydropower Station's tailrace pipe temporary plug design and Construction of Bazang Hydropower Station Project Hub Diversion Tunnel Sectional Form Comparison and Selection of 5# Landslide Stability Evaluation in the Reservoir Area of Bazang Hydropower Station Planning Method of Stone Allocation for Rockfill Dam Construction of Bagong Hydropower Project Overview of the bridge construction Coordination strategy of mining and dam body filling Construction of emulsified asphalt spray protection on the extrusion side wall surface of the Bakun Hydropower Station Dam production and installation of large pressure steel pipes of the Bakun Hydropower Station Engineering factory building slope F8 fault stability analysis Optimization of engineering design and innovative technology application of the Bakun Hydropower Station Summary of Bagong Hydropower Station Engineering Design Slope Anchor Construction of Bagong Hydropower Station Engineering Project Labor Management Practice Summary Summary of Bagong Hydropower Station Water Diversion and Power Generation Tunnel Excavation Construction Quality Control of Excavation Construction of Bagong Hydropower Station Diversion Tunnel Concrete Lined Side Roof Arch Trolley Transfer Method Bagong Hydropower Station Diversion Tunnel Shaft Sliding Form Construction Technology Bagong Hydropower Station Construction Safety Production Management Summary Observation and Analysis of Settlement Deformation of the Concrete Face Rockfill Dam of Bagong Hydropower Station Bagong Water Design optimization and construction of the top cover of the water inlet area I of the power station Analysis and prevention of concrete cracks in the water inlet and spillway of the Bakun Hydropower Station Study on the short-term optimal dispatching of cascade hydropower stations under the market environment of panel concrete construction. The role of municipal water administrative departments in the supervision of rural hydropower efficiency and capacity expansion projects. Bulenkou-Gongger Hydropower Station site and factory buildings. Bulunkou-Gongger Hydropower Station power tunnel high temperature. Cooling measures for construction of the tunnel section Winter construction measures for diversion tunnel lining of Blenkou-Gongger Hydropower Station Comparison and implementation effect analysis of black water ditch diversion schemes of Blenkou-Gongger Hydropower Station Diversion tunnel collapse treatment and discussion of cofferdam type of Burqin Shankou Hydropower Station Selection and Risk Analysis Engineering Geology of the Busuanga Hydropower Station Dam Site Area Busi Hydropower Station Dam Face Concrete Trackless Sliding Form Construction Curtain Controlled Grouting Technology in the Leakage Stopping of the Exit Cofferdam of Jin'anqiao Hydropower Station Energy Conversion Analysis and Calculation of Conventional Hydropower Station Energy Saving Assessment in Plain Areas Study on the ventilation equipment planning during the construction period of the underground cavern group of the hydropower project Construction and application of automatic water regime monitoring and reporting system of Pingban Hydropower Station Comparison of project site selection and hub overall layout plan of Pingfu Hydropower Station Preliminary analysis of the impact of dam break of Meifeng Hydropower Station in Guangdong Province Guangxi small hydropower fuel replacement project Problems and solutions existing in the implementation process Guangxi Zuojiang Shanxiu Hydropower Station hub overall design Guangxi Power Grid Hydropower Station Group Online Forecasting Dispatch Early Warning System Research and Development of Guangxi Power Grid Hydropower Station Group Water Flow Forecasting System Development of Guangxi Power Grid Hydropower Economic Operation Evaluation and Statistics System and Numerical simulation of Kushtayi Hydropower Station's diversion and flood discharge tunnel bottom flow energy dissipation design A brief analysis of the plan for the design of the asphalt concrete core dam of the Kushtayi Hydropower Station project A brief analysis of the supervision work during the construction of the Kushtayi Hydropower Station The filling construction technology of the asphalt concrete core dam body of the Kushtayi Hydropower Station. Experimental study on the steep groove stepped energy dissipation of the spillway of the Kushtayi Hydropower Station. The design of the electrical main wiring of the Kushtayi Hydropower Station. The winter construction field test of the roller-compacted asphalt concrete core wall of the Kushtayi Hydropower Station under emergency rescue conditions. * * Evaluation of the use efficiency of financial resources of the hydropower force. Internet of Things architecture safety monitoring and management system applied to hydropower station hoisting equipment. Application of bottom fence dam in Pakistan hydropower station. Excavation and construction of long-span pressure regulating well of Miaolin Hydropower Station. Brief description of the significance and role of constructing Imbru Hydropower Station in Congo. Carry out rural hydropower renovation and take the road of sustainable development. Expand your thinking and promote the vigorous development of the Sanshenggong Phase II Hydropower Station. Experimental analysis of iron loss of the stator of the 1-# generator of the Longtai Hydropower Station. Research and application of roller compacted concrete admixtures for the Longtai Hydropower Station dam. Diversion tunnel sealing gate. Analysis of Menxia Gate Scheme Design of Diversion Tunnel of Nongtai Hydropower Station and Flood Control Quality Supervision and Effect Evaluation of RCC Dam Project Construction of Nongtai Hydropower Station Research and Application of Structural Form Design of Retaining Sand Sill at Tailwater Exit of Diversion Hydropower Station and Application of Treatment Measures for Intractable Problems in Concrete Pouring of Diversion Tunnel in Hunan Discussion on the technical scheme of the head hydropower station of the main canal of the Hehot Pumped Storage Hydropower Station and the main canal of the Tao Project. Analysis of the defects and faults of power generation equipment that cause abnormalities in the hydropower unit. Design of the installed capacity of the downstream Motan Hydropower Station after the construction of the Zhangfeng Reservoir. Enhancement of the efficiency expansion and transformation design of the Zhangwangmiao Hydropower Station. * * The application of the thinking intensity reduction method for supply promotion of rural hydropower development in the analysis of the slope stability of the 13-# slag yard of Jinping Hydropower Station’s external road. The current problems and policy suggestions faced in accelerating the construction of hydropower in my country. The main powerhouse of Pengshui Hydropower Station and the tailrace tunnel are not connected. Construction of bonded prestressed anchor cables for the underground powerhouse of Pengshui Hydropower Station, rock wall crane beam, secondary tensioning construction technology of high-strength prestressed anchor rods, concrete sealing construction of the diversion tunnel of Pengshui Hydropower Station, Pengshui Hydropower Station ship lock, 6th-span aqueduct box beam construction method, review of large-scale load-bearing racking construction method of Pengshui Hydropower Station Numerical simulation of the entire process of excavation and support of the underground powerhouse of the station. Roller compacted concrete construction technology and supervision quality control measures of Peng Hydropower Station. Black start emergency operation drill of Zhangwu Hydropower Station. Factors affecting the quality of environmental supervision of hydropower projects and improvement measures. Circulating cooler in Application of microcomputer automatic quasi-synchronous device in hydropower stations Application of microcomputer automatic quasi-synchronous device in Dongshuixia Hydropower Station Calculation of reservoir sedimentation of Delxi Hydropower Station Discussing the output line management plans of Huaiji Hydropower stations Study on the influence of power development on water temperature and countermeasures. Control and protection design of Silin Hydropower Station. Application of suspended support platform in the renovation project of the floodway tunnel of Yunpeng Hydropower Station. Three-dimensional seepage analysis of Golantan Hydropower Station dam foundation. Determination of dam foundation surface and dam foundation treatment of Golantan Hydropower Station. Monitoring of surface deformation of the dam at Golantan Hydropower Station. Treatment of collapse of the road around the dam on the left bank of Golantan Hydropower Station. Analysis of the impact of floodwater mist from the discharge of Golantan Hydropower Station on electrical equipment. Structural design of the floodgate piers of the discharge surface of the Golantan Hydropower Station. Safety monitoring data of high slopes of the Golantan Hydropower Station. Analysis of the high slope management of the Golantan Hydropower Station. Overview of the construction of underground power stations in my country. Development and environmental protection of small hydropower in my country. Current status of small hydropower in my country and prospects for alternative fuels. Current status of hydropower construction in my country and future development, current situation and thoughts on environmental protection of hydropower in my country. Examine the innovation and progress of my country's hydropower science and technology. Overview of the development of underground powerhouses of my country's hydropower stations. Discussion of life risk standards for dam breaches of my country's hydropower stations. Discussion of the situation and tasks faced by my country's hydropower. Social evaluation methods and experiences of my country's hydropower projects. my country's overseas hydropower project investment and * * Guided Countermeasures Study the organizational system of my country's green hydropower certification Discuss the application of combined energy dissipation engineering of diversion and diversion in hydropower projects in narrow curved river sections Strategize the treatment measures for large collapses in the construction of diversion tunnels for level 4 hydropower stations Create a professional team to strive to promote the technological process of the hydropower industry Tuohongtai Hydropower Station Analysis of the causes of differential action of the 1# main transformer. Application of grab slotted and perforated concrete anti-seepage wall technology in the reservoir area protection project of Bingling Hydropower Station. Application of tensile unbonded prestressed anchor cables in the high slope support project of Nuozhadu Hydropower Station. Project investment management of Laqi Hydropower Station. Anti-arch water in Laxiwa Hydropower Station. Analysis and application of pad pond structure Flat copper construction and welding technology for the grounding grid of the main dam of the Laxiwa Hydropower Station Crack treatment technology and evaluation of the main dam of the Laxiwa Hydropower Station Clear faced concrete construction technical measures for the underground powerhouse of the Laxiwa Hydropower Station Optimization design of the concrete mix ratio of the dam body of the Laxiwa Hydropower Station Dam concrete crack chemical grouting construction technology Laxiwa Hydropower Station safety monitoring automation system design review Laxiwa Hydropower Station tailrace gate well concrete slip form construction Laxiwa Hydropower Station project experimental study to maintain concrete air content and improve concrete durability 250m grouting hole curtain grouting test High stress unloading high slope excavation technology on the left bank of Laxiwa Hydropower Station Manufacturing and installation plan of pressure steel pipe for diversion tunnel of Laxiwa Hydropower Station and implementation of new concrete pouring for Laxiwa Hydropower Station arch dam Peripheral bedrock control Blasting and blasting Laxiwa Hydropower Station joint grouting construction technology optimization Pressure section steel lining installation technology Laxiwa Hydropower Station monitoring automation system structure and characteristics Laxiwa Hydropower Station communication system design Laxiwa Hydropower Station high arch dam arch sealing grouting technology study Laxiwa Hydropower Station high slope safety protection comprehensive management construction Dahei Hydropower Station surge tank hydraulic sliding form construction technology Vibration method in water conservancy and hydropower projects Application of oil discharge and nitrogen filling fire extinguishing in the main transformer firefighting of Ganze PH1 Hydropower Station in Cambodia Analysis of the selection of project management models for water conservancy and hydropower projects in my country Reference elements Analysis of the main influence of water level and flow relationship on hydropower project design Analysis of human resource management innovation in water conservancy and hydropower survey and design enterprises Discussion of water conservancy and hydropower projects under the concept of sustainable development Discussion of the feasibility of refining the naming of electrical secondary cables for hydropower stations Promoting the development of small hydropower in my country Promoting the adjustment and transformation of hydropower forces Strengthening the financial management of projects under construction Application of fee claims in the excavation of water conservancy and hydropower projects Discussion of relevant measures to improve the economic operation of hydropower stations Measures to improve the power market competitiveness of Longtou Hydropower Station. Analysis of investment preparation characteristics and cost analysis of foreign aid water conservancy and hydropower projects. Application of modified polypropylene fiber concrete in the ship lock of Qiaogong Hydropower Station. Application of numerical prediction technology in Fengman Hydropower Station. Application of mathematical model in mid- and long-term forecasting of Manwan Hydropower Station. Application of rectification feedback in the hoist of hydropower station. Design of hydraulic machinery of Wenzhen Hydropower Station. SCADA system characteristics of Fiji Nandrewatu Hydropower Station. Design of building roof support for the main plant of the station. Design and practice of GIN grouting for Fiji's South Derewatu Hydropower Station project. Analysis of the causes of tunnel leakage and floor cracks for Fiji's South Derewatu Hydropower Station's spillway side wall structure. Calculation and analysis of the structural stress of the working arc door of the surface hole of Fiji's South Derivatu Hydropower Station. Finite element calculation and analysis of the structural stress of the accident gate of the tunnel entrance accident gate of the Fiji South Derivatu Hydropower Station's water distribution ring pipe insulation and pressure casting. Finite element calculation and analysis Structural design of non-load-bearing partition walls of the Riwatu Hydropower Station in South Fiji Design of mechanical auxiliary system Application of new microcomputer automation equipment in technical transformation of hydropower stations Application of new fire alarm system in Xiangjiaba Hydropower Station Application of new electro-hydraulic speed regulator in Shankou Hydropower Station in Xinjiang Application of hydroelectric power generation in Xin'anjiang Hydropower Station Improvement of unit water filling method Preliminary study on the impact of water conservancy and hydropower construction on the ecological environment in the new era New bill to promote new development of small hydropower in the United States Application of new concrete production and lifting technology in the construction of Dagangtu Hydropower Station Hydraulic unit of Xinyuan County third-level hydropower station Analysis and study on capacity expansion and reconstruction of key issues in the hub layout of Xintian Hydropower Station Analysis and selection of Xinjiang Haxionggou Hydropower Station Sediment erosion and sedimentation analysis Engineering Technology Xinjiang Xiaoshankou Secondary Hydropower Station Control Gate Design Pipe construction plan study on the slope design of the diversion tunnel of a Xinjiang hydropower station diversion hub layout of a Xinjiang hydropower station project diversion hub construction of a Xinjiang hydropower station water diversion and power generation tunnel construction branch hole plug design of a Xinjiang hydropower station construction diversion design of a Xinjiang hydropower station shallow buried pressure Pipeline design, high-strength concrete mix design test for a deep hole spillway tunnel of a hydropower station in Xinjiang, hydraulic model test study on the spillway stage of a hydropower station in Xinjiang, roof collapse treatment of the diversion tunnel of the Liushugou Hydropower Station project in Xinjiang, diversion and Design of spillway tunnels, problems and countermeasures in land acquisition and resettlement of Xinjiang water conservancy and hydropower projects, insurance management practice of Xinjiang Bobona Hydropower Station, stability analysis of arch dam abutment of Fangzhu Hydropower Station, construction bidding stage, water conservancy and hydropower project cost control, construction stage surrounding rock classification method. Trial application of non-cap heavy consolidation grouting in Chengzigou Hydropower Station in Mayina Hydropower Station in Kazakhstan Application of alkali-free accelerating agent in Xiluodu Hydropower Station Application of alkali-free accelerating agent in Xiluodu Hydropower Station Wireless monitoring system in grouting construction of Luding Hydropower Station Application of unbonded prestressed anchor cables in Laxiwa Hydropower Station Unit model selection of Xunyang Hydropower Station Concrete mix ratio and performance test of Xunyang Hydropower Station Fish passage design of Xunyang Hydropower Station Excavation and lining of diversion tunnel of Kunjiang 2 Hydropower Station Changma Cascade Hydropower Station Comprehensive Design research and application of integrated automation system Problems and countermeasures in the operation and management of small hydropower in Mingxi County Stability analysis of Yingxiuwan Hydropower Station gate after the first earthquake Analysis of current situation of dispatching and management of small and medium-sized hydropower in Zhaotong City Analysis and countermeasures of small hydropower industry in Jingning County Intelligent compaction process Experimental application of process control system in water conservancy and hydropower projects Study on the comparison and selection of swamp channel foundation treatment plans for Manville Hydropower Station Design of video surveillance system for Manville Hydropower Station Application of finite element analysis in 363kVGIS seismic analysis of Jishixia Hydropower Station Construction technology of the underground powerhouse of the Muzuo Hydropower Station Optimization design and construction of the No. 2 branch tunnel of the Jupiter Hydropower Station Optimization design and construction of the turbine selection design of the Jupiter Hydropower Station Shaft gold lining of large pressure steel pipes Installation technology and scheme design Unit start-up trial operation procedures (hydropower) Study on the importance of unit selection for the renovation of small hydropower stations. Construction and quality control of underground channels of Zamusi Level 1 Hydropower Station. Metal structure design of flood discharge system of Lixianjiang Golantan Hydropower Station project. Suggestions for improvement of generator 3ω stator grounding protection of Lijiaxia Hydropower Station. Quicksand phenomenon in foundation treatment of Lijiaxia Hydropower Station and treatment measures. Causes and treatment of unit vibration of Yangjiaba Hydropower Station and its treatment. Flood discharge and energy dissipation design of Yangfanggou Hydropower Station. Earth and rock upstream of Songta Hydropower Station. Cofferdam Duncan EB, E-μ model parameters experimental study on Songta Hydropower Station water supply pipeline energy dissipation well design Impact of Songta Hydropower Station project construction on regional environment Songta Hydropower Station hub project dam foundation and dam soil penetration stability analysis and evaluation Songjiang River Cascade Hydropower Station toe plate grouting experimental study Songgaoluo Hydropower Station butterfly valve chamber excavation construction technology Goupitan Hydropower Station No. 1 turbine high load zone solution to abnormal vibration and on-site test analysis Goupitan Hydropower Station 600MW generator internal fault main protection configuration scheme Goupitan Hydropower Station upstream RCC cofferdam construction Goupitan Hydropower Station downstream RCC cofferdam warehouse surface quality control Goupitan Hydropower Station hyperbolic arch dam construction control network measurement Goupitan Hydropower Station hyperbolic arch dam concrete temperature control construction Goupitan Hydropower Station generator stator assembly construction technology Goupitan Hydropower Station generator set installation characteristics Goupitan Hydropower Station right dam abutment K280 solution tank excavation construction Goupitan Hydropower Station right bank abutment excavation construction technology Goupitan Hydropower Station right bank abutment anchor shotcrete support construction and quality control Goupitan Hydropower Station dam joint grouting construction technology Goupitan Hydropower Station Goupitan Water Power station dam joint grouting construction technology Goupitan Hydropower Station tailwater outlet high slope excavation and support Goupitan Hydropower Station tailwater pressure regulating chamber excavation and support Goupitan Hydropower Station seat ring installation technology Goupitan Hydropower Station arch dam engineering construction Overview of engineering and technical management Temperature stress analysis and control measures for the concrete of the arch dam of the Goupitan Hydropower Station Application of power-saving and consumption-reducing technologies in the construction of the Goupitan Hydropower Station Anti-scouring and wear-resistant concrete construction technology for the side walls of the water cushion pond of the Goupitan Hydropower Station "Five Controls" Management Practice of Zhenziba I Hydropower Station Phase II Upstream Cofferdam Foundation Leak Channel Plugging Treatment Station stator core assembly process Analysis of the impact of the Zhenziba I Hydropower Station on the visual landscape of the canyon Planning and design of the diversion project of the Zhenba I Hydropower Station RCC construction of the longitudinal cofferdam of the diversion open channel of the Zhenba I Hydropower Station Research on the entrance and exit cofferdam removal plan of the diversion open channel of the Zhenba I Hydropower Station Comparative selection of anti-seepage methods for the diversion open channel of the Zhenba I Hydropower Station Exploration and practice of optimization management of the construction environment of the Zhenba I Hydropower Station Mining and utilization of excavated materials of the Touba I Hydropower Station. Tendering and construction stage design optimization management of the Zhenba I Hydropower Station. Overview of the pivot layout design of the Zhenba I Hydropower Station. Magnetization test of the turbine generator stator of the Zhenba I Hydropower Station. Assembly and welding process of the turbine generator rotor bracket of the Zhiwba I Hydropower Station. Relay protection configuration of the Zhenba I Hydropower Station. Optimization of the design and corresponding investment control risks of the Zhenba I Hydropower Station. Research on the application of chromium ferroalloy slag aggregate concrete in the first-level hydropower station. Research on the anti-seepage curtain grouting of the first-level hydropower station. Experimental study on the anti-seepage curtain grouting of the first-level hydropower station. Underwater blasting construction of the reserved rock ridge at the entrance of the diversion open channel of the first-level hydropower station. Automated control of the sand and gravel processing system of the pillowba hydropower station. Causes and treatment measures of the runner cracks in the Fengshuba hydropower station. Application research of the bridge erecting machine in the Shatuo Hydropower Station. Design optimization of C600 high-resistant concrete for a foreign hydropower project gate dam. A brief analysis of the feasibility of lining type design and construction optimization of the vertical shaft section of pressure pipes in a small hydropower station. Optimization of the river crossing scheme of pressure steel pipes in a small hydropower station. Optimization of the water diversion system of a small hydropower station. Optimization of the water diversion system of a small hydropower station. Technical water supply system renovation of a certain hydropower project. Finite element method calculation and analysis of the diversion tunnel collapse treatment of a certain hydropower station. Analysis of the seismic response of the 750kV outlet building of a certain hydropower station. Research on the stability of the No. Ⅰ landslide of a certain hydropower station. Study on the upstream enclosure of a certain hydropower station. Optimal arrangement of weir anti-seepage body Steel tube concrete composite structure design of the main powerhouse of a hydropower station Research on the mix proportion of roller-compressed asphalt concrete at low temperature of a certain hydropower station Detection and cause analysis of corbel leg cracks in a certain hydropower station powerhouse A brief analysis of the stability of the semi-deterministic block in the pressure regulating room of a certain hydropower station A brief analysis of the construction stability of faults on the right bank of a certain hydropower station A study on the unstable movement characteristics of dangerous rock mass on the slope of the right bank gate site of a certain hydropower station An experimental study on the elastic resistance coefficient of the surrounding rock of a certain hydropower station Preliminary analysis of stability during excavation of a certain hydropower station's underground powerhouse. Analysis of the adaptability of a certain hydropower station's dam type to geological conditions. Analysis of a certain hydropower station's dam foundation precipitates. Design of a certain hydropower station's dam foundation anti-seepage treatment. Experiment and analysis of a certain hydropower station's dam curtain grouting test and analysis. A certain hydropower station's large orifice deep hole arc gate design. A certain hydropower station's periodic flushing sedimentation tank design. A certain hydropower station's diversion tunnel's treatment of extremely large landslides. A certain hydropower station's diversion tunnel entrance edge. Analysis of the cause of slope collapse. Analysis of the collapse of the entrance slope of the diversion tunnel of a certain hydropower station and its treatment. Analysis of the cause mechanism of the No. 1 toppling deformation body of a certain hydropower station project. Analysis of the water pressure test and results of the rock mass drilling of the dam foundation of a certain hydropower station project. Determination of the dam plan of a certain hydropower station project. Pyrite treatment design of the deck dam toe plate foundation of a certain hydropower station project. Analysis and repair measures of the erosion and damage causes of the bottom hole drain channel of a certain hydropower station. Analysis and design experience of geological disaster risk assessment of a certain hydropower station construction project Analysis of stability calculation of a certain hydropower station's waste slag field and its impact on debris flow Analysis of a certain hydropower station's diversion canal burst accident technology analysis of a certain hydropower station's diversion tunnel exit high slope deformation mechanism Study of a certain hydropower station's diversion tunnel excavation support numerical simulation study of a certain hydropower station's construction period optimization of the foundation surface of the riverbed dam section and verification of the treatment measures for turbine blade cracks of a certain hydropower station Design comparison and selection of desilting tank solutions for a certain hydropower station Optimization design of a certain hydropower station's discharge steep slope Optimization design of a certain hydropower station's discharge steep slope Hydraulic model test A certain hydropower station's flood gate stilling tank foundation seepage zone mud cause inspection and analysis of a certain hydropower station's flood discharge tunnel collapse cause analysis and lessons learned A certain hydropower station's cave blasting's impact on slope safety Analysis and treatment of tile accidents Engineering geological characteristics of loose sandstone of a certain hydropower station and engineering treatment Comparison of dam design plans of a certain hydropower station Composition and automatic control technology of the DC system of a certain hydropower station Problems and solutions in the sliding form construction of the shaft of a certain hydropower station Detection and analysis of collapse accidents of steel poles in the network wires of a certain hydropower station Selection of the concrete structure layout of the volute casing of a certain hydropower station Comparative inversion study on the macro-mechanical parameters of the unloading rock mass Analysis and treatment of local collapse of the water inlet slope of a hydropower station Three-dimensional finite element structural analysis of reinforced concrete branch pipes of a hydropower station Design and optimization of the power diversion system of a hydropower station Application in station engineering Concrete test research on the project of Charikou Hydropower Station Engineering against sliding stability calculation and treatment measures of double sliding surfaces in the deep foundation of Stenwodai Hydropower Station in the Kingdom of Cambodia Safety management practice and exploration of BOT project of Kamchai Hydropower Station in Cambodia Experience in progress management of BOT project of Kamchai Hydropower Station in Cambodia Layout design of PH1 plant of Kamchai Hydropower Station in Cambodia Problems with corrosion of silicon steel sheets in the stator core of Ganchai Hydropower Station PH1 power station Problems and treatment methods Practice and exploration of dam foundation consolidation grouting of Kamchay Hydropower Station in Cambodia Practice and experience of installation project management of Kamchay Hydropower Station in Cambodia Summary and exploration of file management work of Kamchay Hydropower Station in Cambodia Characteristics of electrical design of Kamchay Hydropower Station in Cambodia Research and practice on temperature control of roller compacted concrete dam of Kamchay Hydropower Station in Cambodia Practice of design optimization of Kamchay Hydropower Station in Cambodia Overview of station engineering design Standardized work flow in the investigation of physical indicators of hydropower projects Application of gabion technology in the Huangxikou revetment retaining wall reinforcement project of Qingshuitang Hydropower Station Treatment and analysis of the bearing lubricating oil system of Unit 4 of Taoyuan Hydropower Station It is a technical reform plan for the generator cooling water pump of Taoyuan Hydropower Station. Safety management of Taoyuan Hydropower Station project construction during the construction period. Flood risk management and control during the construction period of Taoyuan Hydropower Station. Construction management practice of Taoyuan Hydropower Station project. Discussion on the general contracting management model of Taoyuan Hydropower Station. Study on construction diversion and temporary navigation plan of Taoyuan Hydropower Station. Design and practice of Taoyuan Hydropower Station construction diversion. Ce Taoyuan Hydropower Station hub layout design review Taoyuan Hydropower Station reservoir operation mode and return water research Taoyuan Hydropower Station turbine generator design Taoyuan Hydropower Station floodgate arc door manufacturing Taoyuan Hydropower Station concrete construction supervision practice Taoyuan Hydropower Station bulb tubular unit unloading of large equipment Taoyuan Hydropower Station bulb tubular turbine runner blade number selection Taoyuan Hydropower Station immigration investment supervision practice and inspiration downstream of Taoyuan Hydropower Station ship lock Research on the structure type of the main navigation wall of the pilot channel. Optimization of the hydraulic device of the speed control system of the Taoyuan Hydropower Station. Optimization of the installation process of the flow channel cover of the tubular unit of the Taoyuan Hydropower Station. Design and operation of the ultra-hard gravel sand making process of the Taoyuan Hydropower Station. Research on the anchor chain suspension and sewage discharge of the Taoyuan Hydropower Station. Application of the frame-format underground diaphragm wall in Tongzilin Hydropower Station. Safety monitoring of the underground diaphragm wall of the Tongzilin Hydropower Station. Mass concrete temperature monitoring of the diversion open channel of the Tongzilin Hydropower Station. Control measures Optimization study of the open channel diversion scheme of Tongzilin Hydropower Station Tongzilin Hydropower Station frame format concrete continuous wall construction technology Tongzilin Hydropower Station landslide treatment related measures Tongzilin Hydropower Station high-jet grouting anti-seepage construction technology Qiaotouhe first-level hydropower station improvement regulation and guarantee technical measures Qiaogong Hydropower Station excitation regulator communication problems and treatment of Qiaogong Hydropower Station generator third harmonic 3W stator protection and reconstruction Construction of Qiaogong Hydropower Station Analysis of the problem of periodic interruption of navigation Application of designed pile foundations for enclosing weirs in the deep overburden foundation of the Duobu Hydropower Station building. Measures to deal with the collapse of the lower bend section of the No. 4 diversion channel of Liyuan Hydropower Station. "Combined office" under the "small owner, big supervisor" system of Liyuan Hydropower Station Management model practice Liyuan Hydropower Station ice water accumulation body excavation and drilling machinery selection Liyuan Hydropower Station generator thrust bearing design Liyuan Hydropower Station generator ventilation cooling system design description Liyuan Hydropower Station earth and stone allocation plan study Liyuan Hydropower Station dam cofferdam filling construction technology Liyuan Hydropower Station dam concrete construction and crack treatment technology Liyuan Hydropower Station large power plant rapid construction technology Liyuan Hydropower Station diversion tunnel poor geological cave section support Protection and treatment measures Liyuan Hydropower Station diversion tunnel exit cofferdam demolition blasting Liyuan Hydropower Station diversion tunnel sealing grouting construction technology Liyuan Hydropower Station diversion tunnel local concrete low strength cause analysis and treatment experience Liyuan Hydropower Station diversion tunnel face slope safety monitoring analysis Liyuan Hydropower Station diversion tunnel huge collapse construction technology Liyuan Hydropower Station diversion tunnel entrance face slope deformation and cracking area construction technology Liyuan Hydropower Station engineering construction investment control and management Safety design and calculation of high slope support racks for the concrete production site leveling system on the left bank of Liyuan Hydropower Station. Experimental study on excavation and blasting of ice water accumulation on the toe plate on the left bank of Liyuan Hydropower Station. Review of the coordination process of large accumulation in Niansheng Trench of Liyuan Hydropower Station. Landslide control of extremely large accumulation in Niansheng Trench of Liyuan Hydropower Station. Application analysis of digital dam filling quality monitoring system of Liyuan Hydropower Station. Study on hub layout of Liyuan Hydropower Station. Research on reservoir resettlement of Liyuan Hydropower Station. Social risk analysis On-site assembly and welding of the turbine runner of the Liyuan Hydropower Station Rapid excavation and construction technology of the flood discharge and scour gate well of the Liyuan Hydropower Station Liyuan Hydropower Station Concrete Face Rockfill Dam Filling Quality Control Liyuan Hydropower Station Concrete Face Rockfill Dam Technical optimization and quality control measures Liyuan Hydropower Station Spillway Arc Working Gate Installation technology Liyuan Hydropower Station Resettlement Production and Living Standard Restoration Analysis and Evaluation Liyuan Hydropower Station Resettlement Work Summary Liyuan Hydropower Station Completion Final Account Compilation and Audit Thoughts Liyuan Hydropower Station Toe Plate Consolidation Grouting Test Cascade Hydropower Station Optimized Scheduling Plan Benefit Analysis and Distribution Research Cascade Hydropower Station Power Generation Optimization Scheduling Study Cascade Hydropower Station Impact on Reservoir Area and River Water Temperature Prediction Cascade Hydropower Station Reservoir Flood Compensation Scheduling Method Application Research Cascade Hydropower Station Short-term Optimal Scheduling Algorithm Research Cascade Hydropower Station Short-term Optimal Scheduling Algorithm Research and Software Development Research and application of joint optimal dispatch of cascade hydropower station group Joint dispatch of cascade hydropower station multi-objective risk decision-making model cascade hydropower station energy-saving power generation multi-objective optimal dispatch model study of the bank slope stability of Lenggu hydropower station during rainy days Analysis and treatment of reasons why unit 2 of Loufang hydropower station cannot increase active power Analysis and treatment of efficiency enhancement and capacity expansion renovation of Hengjiang Reservoir dam-back hydropower station Comprehensive automation system design of Chengzigou Hydropower Station large-diameter surge shaft construction technology Key construction technology for super-large diameter surge wells in Shu Chengzigou Hydropower Station. Application of rubber dam technology in hydropower projects. Three-dimensional finite element analysis of Outian Hydropower Station's mortar masonry main dam. Application of orthogonal method in pumping concrete mix design for Shaping Hydropower Station project. Selection analysis of hydraulic turbine generator units for Zhengkong Hydropower Station project. Construction organization design of Zhengdou Hydropower Station. Correct handling of problems that arise during trial operation of hydropower station units. Operation management and development of small hydropower in Wushan County. * * Environmental strategies to support the informatization construction of hydropower troops * * A brief discussion on the practices of hydropower troops in emergency rescue construction * * A brief introduction to the dam emergency construction technology of the Hydropower Corps * * Analysis and response discussion on emergency rescue mission situation of hydropower troops * * Thoughts on emergency rescue equipment support for hydropower troops * * The Hydropower Corps carries out emergency rescue fund guarantee and management. Structural design of units of the Mauergai Hydropower Station. Impact of climate change on local hydropower in Changbai Mountain area and response strategies. Application of concrete pouring technology using underwater conduit method in underwater repair of Gongzui Hydropower Station. Analysis of vibration effects of demolition blasting of the auxiliary dam of Shuifeng Hydropower Station. Collaborative working model of AutoCAD illustration processing for water conservancy and hydropower publications. Water conservancy and hydropower survey. Discussion on the construction technology and technology of water conservancy and hydropower basic projects implemented by design enterprises to implement comprehensive budget management. Analysis of the impact of the "closure order" of water conservancy and hydropower projects on local economic development. Analysis of the construction and application of three-dimensional digital design platform for water conservancy and hydropower projects. Comparison of land acquisition for construction of water conservancy and hydropower projects and highway and railway projects. Risk analysis of owner construction contracts of water conservancy and hydropower projects and prevention of clay paving in water conservancy and hydropower projects. Application of construction method in water conservancy and hydropower engineering pressure steel pipe manufacturing technology Water conservancy and hydropower engineering foundation soil liquefaction review method Determine the problem - Taking Xihua and Shaliang hydropower stations in Jinshui River, Foping County, Shaanxi Province as an example. Research on architectural design strategies of water conservancy and hydropower projects. Study on safety management of water conservancy and hydropower project construction. Discussion on related issues of land acquisition and resettlement planning for water conservancy and hydropower project construction. Discussion on water conservancy and hydropower project construction project management. Discussion on the relationship between cost and safety of water conservancy and hydropower projects. Research and analysis of landscape ecological corridors in disturbed areas of water conservancy and hydropower projects. Construction method Research on the application of diversion technology in water conservancy and hydropower project construction Introduction to quality management methods in water conservancy and hydropower project construction Analysis and control management of risk factors in water conservancy and hydropower project construction Discuss the difficult issues in water conservancy and hydropower project construction contracts Discuss earthwork allocation methods and their applications in water conservancy and hydropower project construction Preparation and management of water conservancy and hydropower project construction safety technical measures Control of engineering machinery maintenance costs Water conservancy and hydropower project construction cost control methods A brief analysis of water conservancy and hydropower project construction cost control Discussion on water conservancy and hydropower project construction bidding and implementation stages Risk prevention in water conservancy and hydropower project construction site safety management Water conservancy and hydropower project construction major hazard source identification Quantitative analysis and application of water conservancy and hydropower project construction project cost management──Kekeya Reservoir removal in Shanshan County, Xinjiang Risk Reinforcement Project Case Analysis Water Conservancy and Hydropower Project Rack Bridge Column Node Construction Quality Control Water Conservancy and Hydropower Project Mechanical and Electrical Installation Project Cost Control Analysis Water Conservancy and Hydropower Project Flood Release Gate Diesel Generator Capacity Selection Water Conservancy and Hydropower Project Flood Risk and Insurance System Development of Water Conservancy and Hydropower Project Measurement Technology Development of Water Conservancy and Hydropower Project Grouting Construction Control Process Research on Water Conservancy and Hydropower Project Environmental Protection Guarantee mechanism for the implementation of protective measures. Environmental impact and countermeasures of water conservancy and hydropower projects. Exploring the social evaluation of water conservancy and hydropower projects. Discussion of several issues regarding the principal-agent relationship in the water conservancy and hydropower project supervision system. Water conservancy and hydropower project supervision work content and existing problems. Research on the impact of changes in land acquisition policies for water conservancy and hydropower projects on the adjustment of resettlement budgets. Practice and reflections on the resettlement supervision of water conservancy and hydropower projects. Water conservancy and hydropower projects. Discuss related issues of project management and construction quality control. Design of video surveillance system for water conservancy and hydropower projects. Discuss some thoughts on environmental protection in water conservancy and hydropower project design. Analysis of water conservancy and hydropower project cost claims and construction period claims. Determination of technical standard system for slope levels of water conservancy and hydropower projects. Construction of technical standard system for the classification of slope operating conditions for water conservancy and hydropower projects. Development of navigation technology research progress for water conservancy and hydropower projects. Water conservancy and water. Existing problems and development direction of electrical engineering cost management Major changes in water conservancy and hydropower engineering Environmental impact management related issues Discussion on water conservancy and hydropower engineering risk elimination technology Research on water conservancy and hydropower engineering project investment management and cost control Water conservancy and hydropower engineering project management model Research on water conservancy and hydropower engineering risks and their response ideas Discussion on hazard source identification and risk assessment of high slopes in water conservancy and hydropower engineering Water conservancy and hydropower construction Discussion on enterprise project management model in water conservancy and hydropower construction earth-rock dam engineering construction album Mix design of anti-impact and wear-resistant concrete in water conservancy and hydropower hubs Research on mix proportion design of water conservancy and hydropower hub panel concrete Research on digital query platform of water conservancy and hydropower science and technology literature Application and research of 3D visualization in 3D collaborative design in water conservancy and hydropower industry Environmental impact of water conservancy and hydropower projects Economic profit and loss analysis Water conservancy and hydropower Project Resettlement Project General Contracting Construction Discussion on the Application and Renovation of Hydraulic Automatic Flap Dam in Yangdun Hydropower Station Application of Hydraulic Automatic Flap Gate in Water Conservancy and Hydropower Project Application of Hydraulic Automatic Flap Gate in Zhuqiao Hydropower Station Impact of Water on Slope Stability of Water Conservancy and Hydropower Project and Solutions Analysis of Shuibuya Hydropower Station Face Rockfill Dam Construction Technology and Application Shuibuya Hydropower Station Face Deflection Monitoring Method Comparing the construction technology of horizontal broken rock tunnels - Documentary construction management of the diversion tunnel of Ganzai Hydropower Station in Cambodia. Application of automatic water regime reporting system in hydropower projects. Stability analysis and treatment plan of No. 7 landslide in Shuiboxia Hydropower Station. Application of cement-based penetrating crystalline waterproof coating in the core wall of the dam of Nuozhadu Hydropower Station. Application of cement-based anchoring agent inverted wedge anchor in the diversion tunnel project of Gongboxia Hydropower Station. Application of the cement-based waterproof slurry coating protection system in Fengman Hydropower Station Three-dimensional finite element calculation and analysis of the pollution barrier frame of the water inlet of the Shuijinguan Hydropower Station project plant Water inlet barrier frame of the Buffalo Hydropower Station Dam gravel soil core wall winter construction study Hydropower BOT construction project pricing method and strategy study Decision-making study on the concession period of hydropower BOT project Study on tax burden issues of hydropower enterprises Analysis of hydropower full life cycle engineering data center and its key technologies Hydropower Survey and Design Institute Engineering Archive Document Integration System Hydropower Plant Application of Power Plant Identification System Unified Code Practice of Hydropower Sustainability Assessment Tool Brief Analysis of Hydropower Underground Engineering Disease Analysis and Risk Prevention and Control The Practice and Understanding of "Relocation First, Construction Later" of Hydropower Projects Application of Three-dimensional Reinforcement in Hydropower Projects and Thoughts on the Role of Hydropower Project Owners' Laboratory Discussion of Occupational Hazards in the Operating Environment of Hydropower Projects Evaluation model study of hydropower project survey and design quality management Discussion of hydropower project changes and claims Discussion of hydropower project feasibility study stage Energy saving and consumption reduction analysis and calculation of hydropower project geological information management system Study of hydropower project safe and civilized construction management and incentive mechanism Brief analysis of hydropower project safety monitoring data management software development and development of hydropower project safety monitoring system special investment preparation rules (trial implementation) Hydropower project safety evaluation standards Discussion of the impact of hydropower projects on aquatic ecology Preliminary study of hydropower project construction and ecological environment reconstruction Hydropower project construction and resettlement exploration and practice Hydropower project construction land acquisition Rural resettlement system research on hydropower project construction land acquisition and resettlement physical indicators Survey issues Discussion of project cost management in the construction stage of hydropower project construction Ecological risk assessment conceptual model of hydropower project construction Research on group management of hydropower project construction Exploration and practice of hydropower project construction Management of materials supplied in the project Supervision work practice under the general contracting model of hydropower projects Hydropower project technical standards "Going global" strategy Management analysis principles and framework models Study of calculation of one-time formwork costs in hydropower project construction On-site management of equipment in hydropower project construction Quality monitoring technology of the whole process of hydropower project construction Study of difficult issues in hydropower project construction contracts Discussion of difficult issues in hydropower project construction drawing stage Geological three-dimensional modeling and analysis Analysis and analysis of causes of multiple accidents in hydropower project construction Strategies to explore the environmental monitoring plan and design during the construction period of hydropower projects Collect and sort out the bidding and procurement of electromechanical equipment for hydropower projects Frequently asked questions and suggestions for bidding and procurement of electromechanical equipment for hydropower projects Slope concept and its engineering geological classification. Hydropower project ecological environment impact assessment indicators and standards. Discussion on hydropower project social stability risk analysis model. Research on hydropower project resettlement professional project road and bridge reconstruction management model. Discussion and practice of hydropower project resettlement pre-design work management. Discussion on hydropower project resettlement site planning and design. Hydropower project resettlement environmental capacity evaluation. Hydropower project resettlement environment capacity evaluation. Hydropower project resettlement planting industry development model. Research on hydropower project resettlement management information system development and implementation. Research on economic production adaptability of hydropower project immigration Hydropower project immigration issues and countermeasures Discussion on emergency response effectiveness of hydropower projects Petri net simulation model Analysis and research on energy saving and consumption reduction of hydropower projects Issues that should be paid attention to in engineering flood control during water storage safety appraisal of hydropower projects Thoughts on collection and archiving of scientific and technological files in hydropower project design Thoughts and suggestions on representative work management of hydropower project design Discussion of electronic file management in hydropower project design files Simulation exploration of hydropower project design system Discuss the real-time monitoring system for roadbed compaction quality of hydropower project approach roads. Development and application of hydropower project tunnel surrounding rock classification expert system. Analysis of hydropower project construction claims. Brief discussion on material procurement in hydropower project project management. New flat-hole anchor block structural design technology for prestressed gate piers in hydropower projects. Discuss international experience in watershed management of fish protection in hydropower projects and learn from the technology of fish breeding and releasing stations in hydropower projects. Design of fish breeding and releasing stations in hydropower projects. Design A brief analysis of several issues in the design of fish proliferation and release in hydropower projects Discussing the deployment and practice of VPN network construction in hydropower construction enterprises and legal management of on-site visas for hydropower construction units Analysis of issues and countermeasures for tracking and auditing throughout the entire process of hydropower construction projects Research on contract price adjustment of hydropower construction projects Public participation issues in environmental impact assessment of hydropower construction projects Discussing the practice and analysis of financial evaluation of hydropower construction projects The impact of hydropower development on fish and its protective measures Ecological supplementation of hydropower development Compensation methods Discuss the ecological compensation mechanism of hydropower development projects Study the measures and methods for hydropower construction enterprises to strengthen the training of equipment on-site repairmen The necessity of hydropower construction enterprises to establish fund settlement centers Common problems and countermeasures in material management of hydropower construction enterprises Problems and improvement methods in scientific and technological innovation of hydropower construction enterprises A brief discussion on the project safety management of hydropower construction enterprises Overview of the information management method of project clusters of hydropower construction enterprises Research and application of hydropower construction safety hazard investigation technology Identification of hazard sources and safety assessment at electric construction sites. Design of wireless video monitoring system at hydropower construction sites. Discussion on the roundness analysis method of generator rotor of hydropower units. Research on vibration signal characteristics of hydropower units. Hydraulic optimization design of thrust bearing mirror plate pump and oil circulation cooling system of hydropower units. Practical technology established for online monitoring system of hydropower unit efficiency. Discussion and practice of key technologies of intelligent turning system of hydropower units. Discussion and practice of hydropower unit status maintenance development ideas. Discussion of operating equipment of hydropower units. Detection and diagnosis of HEC concrete road construction design of hydropower hubs Research on special acceptance practices of hydropower hub projects and exploration of the impact of hydropower cascade development on the landscape ecosystem of the Wujiang River Basin Discussion of geological parameters of hydropower and water conservancy projects Several issues on slopes of hydropower and water conservancy projects Discussion of hydropower resettlement compensation "16118" policy practice analysis of investment control methods of hydropower resettlement project construction projects Research on the hazards of air mass movement in long diversion tunnels downhill from hydropower stations Analysis of the hazards of air mass movement in hydropower stations Discussion on the reliability calibration of open tubes in hydropower stations and wind power compensation operation. Analysis of the mid- and long-term power generation dispatching theory of hydropower stations. Research on the impact of ground fault transmission voltage on the high-voltage side of the main transformer of hydropower stations on generator stator grounding protection. Research on optimal dispatch decision-making auxiliary system of hydropower stations. Analysis of typical transformer branch wiring and relay protection configuration of hydropower stations. Research and application of winter runner operation technology of hydropower stations. Calculation method of initial water storage process of hydropower stations. Research on practical methods of economic operation in hydropower stations. Research on hydropower stations. Construction technology of high-pressure jet-blasting anti-seepage wall in the cofferdam of the factory area Finite element analysis of the connection form of the hydropower station dam Volumetric concrete temperature stress analysis and anti-cracking measures Comprehensive countermeasures for the construction organization design of hydropower station powerhouses Analysis of key technologies for hydropower station powerhouse volute concrete construction Safety analysis of hydropower station powerhouse track precast beam hoisting safety analysis of hydropower station powerhouse wind hood Temperature stress analysis of hydropower station power branch circuit operation and protection equipment configuration plan. Brief analysis of the impact of water intake from hydropower station pressure pipes on the output of the generator set. Analysis of hydropower station pressure steel pipe installation technology. Introduction to hydropower station pressure steel pipe bifurcation production and water pressure. Experimental hydropower station pressure steel pipe photogrammetry and reverse modeling analysis of hydropower station thick steel plate pressure steel pipe submerged arc welding process Brief analysis of hydropower station power generation diversion channel frost heave treatment technology Motor circuit breaker selection and modification, hydropower station transformer water spray envelope fire protection system application, hydropower station synchronous generator noise generation causes and measures, hydropower station hoist drum finite element analysis application and practice, hydropower station earth dam water conveyance culvert (pipe) disease Analysis of risk causes and strengthening of hydropower station civil engineering projects to implement reasonable and low-price bids. Discussion on the impact of the underground powerhouse of the hydropower station on the seismic response of the surrounding rock of the cavern. Finite element calculation and analysis of the wind shield structure of the underground powerhouse of the hydropower station. Analysis of the geostress field in the underground cavern area of the hydropower station. Inversion analysis of the nonlinear seismic response of the underground cavern group of the hydropower station Numerical simulation of the typical problems in the procurement of transportation projects within the hydropower station site and harmonious improvement of the hydropower station dam surface leakage comprehensive treatment technology Hydropower station cushion volute seat ring stress mechanism study of the hydropower station capacity expansion and transformation plan and automation technology Research of the hydropower station dam diversion and its construction technology Discussion of the modification of the hydropower station dam diesel generator Hydropower station dam seepage around the dam automatic monitoring system Restoration project of the hydropower station large bridge crane hoisting mechanism structure Structural form and performance analysis of real-time economic operation of hydropower station Vibration zone avoidance strategy Research on construction technology of lower gate sealing in diversion tunnel of hydropower station Research and application of "two machines and one row" underground powerhouse layout of small power station in diversion tunnel of hydropower station Hydropower Discussion on the excavation and construction technology of the station diversion tunnel. A study on the key technologies for the underwater construction of the hydropower station tailrace weir body. A study on the dredging and excavation of the hydropower station tailrace channel. A study on the joint optimization of the pier structure and hydraulic power of the hydropower station tailrace pipe. Prevention and containment in the construction of the hydropower station project. * * Zhice Hydropower Station Project Bidding Management Research on the Design Features of Ladders for Roof Maintenance of Hydropower Station Buildings New Water and Soil Loss Prediction and Prevention Measures in Hydropower Station Construction Research on the Impact of Hydropower Station Construction on Tao River Aquatic Life and Protection Measures A numerical solution to the runoff regulation of a hydropower station as an example. Hydropower station technology. Water supply system design. Analysis of hydropower station pollution interception and cleaning technology and improved hydropower station water release culvert construction technology. System dynamics analysis of the safety management level of personnel at hydropower station construction sites. Research on the ecological and hydrological evaluation method of the impact of hydropower station daily regulation on river habitat conditions. Research on the intelligent system of hydropower stations. Analysis on the construction technology of concrete linings of pressure tunnels and pressure regulating shafts in hydropower stations. Improvement and practical research on dynamic calculation methods for hydropower station piers. Research on the transportation of heavy items of electromechanical equipment in hydropower stations. Discussion on the development of hydropower station unit parameters and workshop size calculation software. Design and application of intelligent turning systems for hydropower station units. Hydropower stations. Preliminary study on the capacity selection of diesel generator sets. Analysis of annual changes in soil fertility of the base material of the vegetation concrete slope ecological protection project of hydropower stations. Operation accidents and countermeasures of hydraulic gates of hydropower stations. Optimal scheduling of hydropower station reservoirs. Chaotic particle swarm algorithm. Improved chaotic genetic algorithm for optimal scheduling of hydropower station reservoirs. Iron loss of stator core of hydropower station turbine generator. On-site implementation of the test Hydropower station hydraulic generator set dynamic characteristics data storage optimization and decision-making Hydropower station sluice gate renovation design Brief analysis of hydropower station hydraulic device control system failure analysis and treatment Hydropower station spillway tunnel concrete crack treatment and prevention measures Hydropower station floodgate chamber strength and stability analysis Hydropower station fire pool water level monitoring Improvement of visual loop analysis and prevention and control measures for concrete floor cracks in hydropower stations Demolition and blasting design of concrete longitudinal cofferdams and gantry rails of hydropower stations Treatment of foundation concrete cracks in the concrete gravity dam section of hydropower stations Simulation method for accumulation of floating objects in hydropower stations Discussion on static load test of bridges with special loads in hydropower stations Hydropower station ball valve automatic maintenance manipulator Design of large-diameter butterfly valves for hydropower stations Development of hydropower station electrical equipment capacity expansion Renovation of hydropower station emergency systems Construction of hydropower stations Sand prevention measures Improvement of hydropower station economic operation assessment indicators Research on existing problems and core countermeasures in the management of hydropower station relay protection devices Analysis of hydropower station green maintenance strategies Exploration and research on hydropower station network video monitoring Design of control system, analysis of influencing factors on energy index of hydropower station, CFD simulation of hydropower station siphon water inlet working process, hydropower station siphon water inlet design, discussion of hydropower station volute contact grouting construction process, hydropower station computer monitoring system process optimization design, hydropower station surge tank rapid gate stability and safety precautions, research on hydropower station Stress analysis during operation of pressure regulating wells Combination application of hydropower station governor and pressure regulating valve and common faults Hydropower station speed regulation system model parameter testing method Research on hydropower station property insurance Thoughts on hydropower station auxiliary system intelligent integrated platform Design of hydropower station slope collapse accumulation body Slope stability and deformation analysis Hydropower station slope excavation quality control System development and application Three-dimensional finite element analysis of hydropower station slope stability Research on energy-saving measures for hydropower station operation and management Research on hydropower station operation and dispatch performance assessment methods Hydropower station water inlet waste rack equipment safe operation status analysis Hydropower station water inlet hydraulic characteristics Numerical simulation study Hydropower station gate pier cantilever large steel formwork design and application Hydropower Study on the structural vibration of the accidental working gate of the station tunnel water inlet. Research on the main rockfill rolling compaction test of the face rockfill dam of the hydropower station. Research on the financial evaluation of the hydropower station by introducing the simulation risk analysis method. Application of the passive protection system of the flexible network in the high slope of the hydropower station. The significance of the black start function of the pressure steel pipe swallowtail pier design of the hydropower station on the high and steep slope. and issues that should be paid attention to. Preliminary study on the impact of hydropower planning on the hydrological situation of the Panzhihua section of the Jinsha River. Study on the environmental impact assessment of hydropower planning. Optimization of alternatives. Study on the "going global" strategy of hydropower design companies. Discussion on the legal risk management of foreign-related projects of hydropower design companies. Analysis of emergency relief material guarantees for hydropower troops. Emergency communication support system of the power force. Discussion on the financial management work of the hydropower force under the new normal. Analysis of the risk avoidance case of the hydropower force and thinking about the risk system construction and evaluation method in the preliminary survey and design stage of the hydropower project. Research on the water and soil loss prediction unit and period division of the hydropower project. Typical model of hydropower and wind energy complementary regulation system. Hydropower generator. Application of air gap monitoring technology in Guandi Hydropower Station Application of turbine generator phase change cooling technology in Luogu Hydropower Station Analysis of installation process of turbine generator set - taking Shenlong Hydropower Station in Youxi County as an example Excavation and construction of pressure regulating shaft of Yongning River IV Hydropower Station Test on dam cushion material and extrusion side wall of Hanpingzui Hydropower Station. Discussion on maintenance and management of cascade hydropower stations in Han River Basin. Study on joint peak-shaving operation mode of cascade hydropower stations in Han River Basin. Review of turbine operating conditions of Jiangya Hydropower Station. Investigation and analysis of current situation of small hydropower safety and management in Xingan County, Jiangxi Province. Survey and analysis of safety management work of riverside hydropower stations. Summary of safety management of riverside hydropower stations. Characteristics of rock bursts in the station diversion tunnel and prevention and control measures. Excavation and construction of the inclined shaft section of the diversion tunnel of the Jiangbian Hydropower Station. Investigation and assessment of debris flow disasters in the digging ditch of the Jiangbian Hydropower Station and prevention and control measures for environmental protection and expansion of the Jiangbian Hydropower Station. Design of the water inlet of the Jiangbian Hydropower Station. Construction of the concrete anti-seepage wall on the right abutment of the gate dam of the Jiangbian Hydropower Station. Finite element deformation calculation of the gate dam of the Jiangbian Hydropower Station. Comparative analysis of actual measurement results Design study of water diversion and sand prevention at the first hub of Jiangbian Hydropower Station Construction and management of fish breeding stations of Jiangbian Hydropower Station Analysis of dam damage in large and medium-sized hydropower projects in Wenchuan earthquake-stricken areas Suppression methods of electromagnetic radiation of automobile wiper motors Research on main protection of generators of Muruo Hydropower Station and power station protection design Muruo Hydropower Station Hydropower generation Main unit parameters and structural selection Analysis of the measured displacement behavior of the roller compacted concrete arch dam of Shaba Hydropower Station Vibration analysis and structural optimization of the powerhouse of Shaping II Hydropower Station Feasibility study of canceling sand flushing holes in the powerhouse of Shaping II Hydropower Station Shaping II Hydropower Station project "Relocation first, then construction" Exploration and practice of tunnel excavation and first-phase support of Shaping Hydropower Station Technical discussion on anti-sliding body stabilization treatment for No. 5 dam section of Shatuo Hydropower Station. Excavation and controlled blasting construction technology. Shatuo Hydropower Station Phase II upstream cofferdam construction technology. Shatuo Hydropower Station pressure steel pipe contact grouting construction technology. Risk identification and response strategies in the construction of Tuo Hydropower Station dam project. Shatuo Hydropower Station anti-slip body and anti-shear hole excavation blasting vibration control technology. Shatuo Hydropower Station new hard-filled cofferdam design research and project implementation effect evaluation. Shatuo Hydropower Station concrete mixing plant refrigeration system installation technology. Shatuo Hydropower Station overflow surface hole arc gate installation technology application. Research on Shatuo Hydropower Station RCC warehousing scheme Shawan Hydropower Station powerhouse foundation consolidation grouting construction technology Shawan Hydropower Station tailrace canal anti-seepage research and application Shawan Hydropower Station turbine guide vane relay pull cylinder fault treatment Shapai Hydropower Station diversion tunnel plug design and construction Shapai Hydropower Station water inlet tower seismic damage simulation analysis Hebei Province Rural Hydropower Effects and experiences of efficiency-enhancing and capacity-enhancing renovation projects Exploration and practice of the standardized management model for safety production in rural hydropower in Hebei Province Exploration and practice of the standard management model for rural hydropower stations in Hebei Province Renovation design points for rural hydropower stations in Hebei Province Determination of test parameters for blasting and demolition of downstream guide walls of Hekou Hydropower Station Overview of technical renovation of bulb tubular turbine generator units in operation at Hekou Hydropower Station Overview of rubber in riverbed hydropower stations Design application technology of rubber dam Experimental study on the mix ratio of asphalt concrete in the construction of the Bobui Hydropower Station. Analysis on the capacity expansion and transformation effect of the first-level hydropower station in Bozhou. Experimental study on the long-term induced voltage band partial discharge test of the 1# main transformer of the Bobona Hydropower Station. Experimental study on the mix ratio of high-sulfur-resistant concrete in the powerhouse project of the Bobona Hydropower Station. Analysis of the vibration causes of the turbine generator unit of the Bobona Hydropower Station and the dynamic leveling of the unit. Weighing test Fire protection design of Bobona Hydropower Station Construction of long diversion tunnel of Bobona Hydropower Station Branch hole sealing design Corrugated telescopic joints Application of Manas River I Hydropower Station Precedent of construction of arch dam in mudstone area - Design of concrete double-curved arch dam of Kelin Hydropower Station in Baise City, Guangxi Research on protection scheme of debris flow gully type waste slag field - Taking Jinsha Hydropower An example of Shijiagou abandoned slag field in the station. Relevant issues in the curtain grouting test of the dam foundation of Tikeze Hydropower Station. Relief of doubts about the impact of the overall construction schedule of Tikeze Hydropower Station on construction period claims. Rush measures for the metal structure part of Tikeze Hydropower Station under FIDIC terms. Design of ice melting heater for the inlet gate of Taihir Hydropower Station. Pumping anti-shock Application of ground concrete in the construction of the overflow surface of the right bank dam of Guanyinyan Hydropower Station Luding Hydropower Station No. 3 spillway tunnel excavation support Luding Hydropower Station No. 3 stilling tank vertical slope pipe pile reinforcement construction technology Luding Hydropower Station powerhouse fair-faced concrete construction technology Luding Hydropower Station powerhouse construction of SNS flexible protection system on high slopes Luding Hydropower Anchor cable construction technology for the right dam abutment support project Consolidation grouting construction method for the deep overlay of the Luding Hydropower Station dam foundation Luding hydropower station dam foundation grouting gallery design Luding Hydropower Station dam foundation high water head and deep overlay curtain grouting construction technology study Luding Hydropower Station foundation pit overflow protection study Luding Hydropower Station dam anti-filtration material production system process flow design Special issues and solutions for dam filling in Luding Hydropower Station Design optimization and construction methods of seismic beams of Luding Hydropower Station dam Construction supervision experience of Luding Hydropower Station dam Continuous prestressed box girder construction technology of Luding Hydropower Station tailrace bridge Luding Hydropower Station shore tower type inlet tower structure dynamic response analysis Luding Hydropower Station engineering construction products Concrete quality control Exploration and practice of project supervision of Luding Hydropower Station Luding Hydropower Station Electromechanical Equipment Installation Creation Quality Management Overview Treatment and Prevention of Concrete Cracks in Spill Tunnel of Luding Hydropower Station Luding Hydropower Station Cavern Excavation and Support Supervision Quality Control Luding Hydropower Station Deep Covering Layer Anti-seepage Wall Construction Technology Luding Hydropower Station Grouting Gallery Concrete Design and construction of special anti-seepage body on the outer surface of the soil Deformation reinforcement and collapse treatment of extra-large cross-section water diversion tunnel of Luding Hydropower Station Design defects and improvement measures of DC system wiring method of Luding Hydropower Station Research on foundation seepage control scheme of clay core rockfill dam of Luding Hydropower Station Design of clay core rockfill dam of Luding Hydropower Station Clay core material foundation part of Luding Hydropower Station Rapid filling in the rainy season The structure and characteristics of the computer monitoring system of the Luding Hydropower Station The curtain grouting construction technology of the deep covering layer under the anti-seepage wall of the Luding Hydropower Station The construction technology and quality control of the clay core rockfill dam of the Luding Hydropower Station Research and application of the curtain grouting construction technology of the dam foundation of Zhecheng Xi'an Hydropower Station Luogu Hydropower Station flood discharge and energy dissipation building design Luogu Design of slope support on the right bank of stilling tank of hydropower station. Some experiences on the technical renovation design of Luoning small hydropower project. Application of cavern blasting in the excavation and construction of material yard of water conservancy and hydropower projects. Measures for dealing with deformation of surrounding rock at the intersection of diversion tunnel of Dongsong Hydropower Station. Controlled blasting activity flow of Karazhai material yard of Hongjiadu Hydropower Station. Selection flow of a hydropower station dam site near a fault. Research on the economic operation and optimal dispatching system design of regional hydropower station group. Innovation and practice of production management model of large hydropower stations under the basin centralized control mode. Brief analysis of the spill gate operation accident of Shangli Hydropower Station. Brief analysis of the difference between domestic hydropower resettlement and the World Bank's involuntary resettlement policy standards. Brief analysis of construction progress risks of large water conservancy and hydropower projects. Brief analysis of small-scale water conservancy and hydropower projects. A brief analysis of turbine selection for hydropower stations and the development of small hydropower and coping with climate change A brief analysis of the electrical secondary part renovation of Laxiwa Hydropower Station A brief analysis of the technical update and renovation of Dutong Hydropower Station A brief analysis of the dam foundation treatment of a certain hydropower station A brief analysis of the design features of the QM4500/1000kN dam top two-way gantry operator of Liyuan Hydropower Station A brief analysis of the digital platform of Liyuan Hydropower Station Application of dam filling quality monitoring system A brief analysis of water conservancy and hydropower project construction cost management and control A brief analysis of water conservancy and hydropower project file formation characteristics and file management A brief analysis of the preliminary work of water conservancy and hydropower project cost management A brief analysis of environmental protection during water conservancy and hydropower construction period A brief analysis of the decommissioning and dismantling of hydropower dams A brief analysis of the mechanical equipment management of the hydropower project construction project department A brief analysis of the power design and operation mode of the three-stage power plant of the hydropower station. A brief analysis of the regulation and guarantee design of the hydropower station. A brief analysis of the influence of the internal characteristics of the turbine on the calculation results of the large fluctuation transition process of the hydropower station. A brief analysis of the formation of moraine on the right bank of the dam site area of the Potui hydropower station and its engineering characteristics. A brief analysis of the phase advance operation depth of the generator of Wanmipo Hydropower Station. A brief analysis of the Laos Namkham 2 water Mining of dam materials for power station face rockfill dam. A brief analysis of the application of polyurethane insulation materials in the Shankou Hydropower Station project. A brief analysis of the hazards of over-exploitation of rural micro-hydropower stations. A brief analysis of the quality control points of the aqueduct construction supervision of Chongqing Pengshui Hydropower Station. A brief analysis of the upward fault of the control ring of the No. 1 engine of the Jinshaxia Hydropower Station. A brief analysis of the construction and operation of the second phase of the Yellow River Sanshenggong Junction Hydropower Station. A brief discussion on the project cost control of the San Sheng Gong Phase II Hydropower Station. A brief discussion on the development of large-scale hydropower units in my country. A brief discussion on the impact and protection of the ecological environment caused by the construction of hydropower stations in the Xunhe River Basin. A brief discussion on the investment control of the BOT project management of the Kamchai Hydropower Station in Cambodia. A brief discussion on the importance of optimal design of water conservancy and hydropower projects. A brief discussion on the risks in the construction of water conservancy and hydropower projects. Risk identification and control. A brief discussion on the tasks of the construction unit in the land acquisition and resettlement of water conservancy and hydropower projects. A brief discussion on the balance of interests in the resettlement of hydropower projects. A brief discussion on the characteristics of the relocation planning and design of urban and market towns in the reservoir area of hydropower stations. A brief discussion on the determination of hydropower station projects in the Ai River Basin. A brief discussion on the capacity expansion and renovation of the hydroelectric generator units of Sanshengong Hydropower Station. A brief discussion on the relay of Sanshenggong Hydropower Station. A brief discussion on the installation of turbines in Xiabandi Hydropower Station. A brief discussion on the mechanical and electrical installation and construction management of Central Asia Hydropower Stations. A brief discussion on the development and ecological environment protection of rural hydropower. A brief discussion on rural hydropower statistical work. A brief discussion on the safety supervision work of the corridor and cavern seepage control projects of Xiangjiaba Hydropower Station. A brief discussion on the DC power supply system of Xiangjiaba Hydropower Station. A brief discussion on international EPC water. A brief discussion on the design and management of electrical engineering projects. A brief discussion on the electromechanical design and management of international hydropower projects. A brief discussion on hydropower development and ecological environment protection in the Datong River Basin. A brief discussion on how to strengthen investment control during the implementation phase of hydropower projects. A brief discussion on how to prepare a good immigration investment budget for water conservancy and hydropower projects. A brief discussion on the characteristics of the layout of the pressure forebay of small hydropower stations. A brief discussion on small hydropower. A brief discussion on the unattended operation mode of the station. A brief discussion on the technical transformation of small hydropower stations. A brief discussion on several effective methods of ground control measurement for small hydropower projects. A brief discussion on the classification of land use status in land acquisition for project construction. Taking the Wacun Hydropower Station project as an example, a brief discussion on the development status and countermeasures of the small hydropower industry in Pingyang County. A brief discussion on the safety guarantee issues of rural hydropower in my country. A brief discussion on the safety and emergency management of hydropower station projects in my country. A brief discussion on investment-driven transformation and upgrading of hydropower design enterprises. A brief discussion on the resettlement of rural immigrants in hydropower projects under the background of reform. A brief discussion on the modernization of small hydropower in Dunhua City. A brief discussion on the immigration and resettlement characteristics of Xinjiang water conservancy and hydropower projects. A brief discussion on the ALSTOM generator rotor assembly technology of the Goupitan Hydropower Station. A brief discussion on the ALSTOM stator assembly construction technology of the Goupitan Hydropower Station. A brief discussion on the process control of the installation quality of the electrical equipment of the Goupitan Hydropower Station. A brief discussion on the existing problems and solutions in the factory building construction of the Taoyuan Hydropower Station. A brief discussion on the quality control of the concrete anti-seepage wall of the second phase cofferdam of the Tongzilin Hydropower Station. A brief discussion on several construction technologies of the Liyuan Hydropower Station project. A brief discussion on Liyuan. A brief discussion on the safety management work during the construction period of the hydropower station. A brief discussion on the scrapping and reconstruction of the Wuyue Hydropower Station. A brief discussion on the market development of water conservancy and hydropower survey and design enterprises. A brief discussion on the construction quality management of water conservancy and hydropower projects. A brief discussion on the key points of concrete quality control in water conservancy and hydropower projects. A brief discussion on the social security resettlement model of water conservancy and hydropower projects. A brief discussion on the policy requirements of "immigration first, construction later" for hydropower projects. A brief discussion on the comprehensive supervision of land acquisition and resettlement for hydropower project construction. A brief discussion on the problems and countermeasures of hydropower project equipment management. A brief discussion on the problems existing in the bidding and bidding management of hydropower construction market projects. A brief discussion on the supply chain complexity and risk management of complete electromechanical equipment projects for hydropower stations. A brief discussion on the abrasion and protection of turbines in hydropower stations. A brief discussion on the comprehensive budget management of hydropower troops. A brief discussion on how to improve the safety management level of the grassroots project department of the hydropower force. A brief discussion on how to improve the quality and ability of financial personnel during the transformation period of the hydropower force. A brief discussion on the relationship between water resources allocation and the scale of hydropower stations. A brief discussion on the production management experience of Shafan Hydropower Station. A brief discussion on the optimization of the dam curtain grouting design scheme of the Hewan Hydropower Station. A brief discussion on the construction safety measures of the Luding Hydropower Station. Discuss the impact of water consumption on the ecological environment on the power generation of post-dam hydropower stations. Discuss the regional structural stability of Kohala Hydropower Station. Discuss the understanding of the creation of "green small hydropower" in Mijiahui Hydropower Station. Discuss the diversion and cofferdam construction plan of Jishixia Hydropower Station. Discuss the progress plan preparation of Nuozhadu Hydropower Project. Discuss the technical update of the old power station. —Discussing the necessity of technology update and transformation based on the current situation of small hydropower in Yixian County, Hebei Province. Briefly discussing the capacity expansion and reconstruction of the sand and gravel processing system on the left bank of Jin'anqiao Hydropower Station. Briefly discussing the reconstruction and quality control of the sand and gravel processing system of Jin'anqiao Hydropower Station. Briefly discussing the excavation and support technology of the underground powerhouse of Jinping Secondary Hydropower Station. Briefly discussing the troubleshooting and original treatment of the technical water supply pressure reducing valve of Yamadu Hydropower Station. A brief discussion on the review of the first-level measurement and control network of the Qirehattar Hydropower Station due to analysis A brief discussion on the Luding Hydropower Station project archives management system The practice and reflections on water education with Zhejiang characteristics - taking Zhejiang Water Conservancy and Hydropower College as an example Zhejiang Province's rural hydropower efficiency expansion, capacity expansion and transformation measures to benefit farmers Discuss some thoughts on the rural hydropower safety supervision work in Zhejiang Province Discussion on the construction of the management information system of the village hydropower station. Construction of the basic plastic concrete anti-seepage wall of the Haibowan Hydropower Station. Overview of the mainstream technology of water inrush and seawater desalination and cogeneration of water and electricity. Analysis and evaluation of the dam deformation monitoring system of the Haidianxia Hydropower Station and monitoring data. Selection of the stable section of the pressure regulating chamber of the Haidianxia Hydropower Station and calculation of surge waves. Technical water supply of the Rundi Hydropower Station. System design of Huainan Mining Area Floor Limestone Hydropower Method Detection Simulation Experimental Study on the Earthquake Displacement of Hydropower Station Building on Deep Covering Layer Calculation and Control of Deformation of Gate Dam in Deep Covering Layer and Anti-seepage Effect of Plastic Concrete Cutoff Wall - Taking the Operation Condition of Shawan Hydropower Station as an Example Application of safety supervision practice of small and micro rural hydropower stations in Chun'an County Application of concrete reinforcement technology in Jishixia Hydropower Station project Application of concrete segment production technology in Ecuador CCS Hydropower Station Application of concrete anti-seepage wall in construction diversion of a hydropower station Application of fair-faced concrete in hydropower stations Utilization of abandoned buildings in Qinghe Reservoir Feasibility analysis of building a hydropower station Calculation of installed capacity of Qinghe Reservoir Hydropower Station Identification and preventive measures of generator shaft current of Qingyuan Hydropower Station Research on automatic power generation system of canal diversion hydropower station units Application of canal anti-seepage technology in Tumusiuke Hydropower Station project Dukouba Hydropower Station arch dam concrete temperature control Wenkeng Hydropower Station pressure Design analysis of power pipelines and the application of temperature inspection system in small and medium-sized hydropower stations Foundation excavation and construction of Wenquan Hydropower Station powerhouse expansion project Causes and treatment measures of concrete cracks in the dam face of Wenquan Hydropower Station Hydraulic model test study of deep hole spillway tunnel of Wenquan Hydropower Station Design and filling construction of concrete face rockfill dam of Wenquan Hydropower Station Xigu Hydropower Experimental study on the station's unpressurized shaft swirl tunnel Design and analysis of the shaft swirl spillover tunnel of the Xigu Hydropower Station Xigu Hydropower Station water inlet tower stability analysis Reliability analysis of power system of Xiluodu Hydropower Station Power system design of Xiluodu Hydropower Station Excavation and blasting parameters of right bank abutment slope of Xiluodu Hydropower Station Concrete construction technology of right bank spillway tunnel of Xiluodu Hydropower Station High-voltage cable laying technology of right bank shaft of Xiluodu Hydropower Station On-site machining technology of turbine seat ring of Harbin Electric Power Station Xiluodu Hydropower Station Analysis of water hammer characteristics of pipes in underground powerhouse drainage system of Luodu Hydropower Station Consolidated grouting construction technology of dam foundation of Xiluodu Hydropower Station Research on photographic interpretation technology of rock mass structure of dam foundation of Xiluodu Hydropower Station Dam abutment excavation technology of Xiluodu Hydropower Station Bottom hole gate pier anchor cable construction technology Xiluodu Hydropower Station dam concrete mix ratio optimization experimental study Xiluodu Hydropower Station project closure construction technology Xiluodu Hydropower Station left bank underground powerhouse rock anchor beam concrete pouring technology Xiluodu Hydropower Station left bank underground powerhouse volute concrete construction technology Xiluodu Hydropower Station left bank diversion tunnel No. 2 and 3 gate vertical Well excavation and construction Xiluodu Hydropower Station left bank diversion tunnel entrance and exit cofferdam removal Blast drilling technology Xiluodu Hydropower Station left bank spillway tunnel floor excavation effect analysis Xiluodu Hydropower Station elastic rubber pad supported thrust bearing structure analysis Xiluodu Hydropower Station interception engineering equipment configuration analysis Xiluodu Hydropower Station interception design and construction key technology Xiluodu Hydropower Station Quality control of arch dam foundation excavation construction of Luodu Hydropower Station Monitoring and analysis of dam foundation deformation during the construction period of Xiluodu Hydropower Station arch dam Key technologies for concrete construction of arch dam of Xiluodu Hydropower Station Overview of concrete construction technology for arch dam of Xiluodu Hydropower Station Analysis of water flow control during construction period of Xiluodu Hydropower Station Discussion on the self-excitation problem of units of Xiluodu Hydropower Station Experimental study on excavation and blasting vibration of the underground powerhouse of the power station hub project Xiluodu Hydropower Station's water cushion pond anti-arc section concrete construction technology Xiluodu Hydropower Station's water cushion pond floor anti-erosion and wear-resistant concrete construction technology Xiluodu Hydropower Station's water cushion pond anti-erosion and wear-resistant concrete quality control Xiluodu Hydropower Station reservoir utilization and power station operation scheduling procedures preparation Xiluodu Hydropower Station Analysis of the protection configuration of the turbine generator set of the Du Hydropower Station Design and optimization of the turbine spindle center gas supply system of the Xiluodu Hydropower Station Analysis of the overall technical characteristics of the turbine of the Xiluodu Hydropower Station_Analysis of the temperature control effect of 9060 silica fume concrete Xiluodu Hydropower Station flood discharge deep hole Stainless steel composite steel lining welding Xiluodu Hydropower Station flood discharge system operation characteristics Xiluodu Hydropower Station hydraulic hoist opening meter application Xiluodu Hydropower Station deep and large shaft concrete seepage crack treatment Xiluodu Hydropower Station deep hole curtain Grouting construction technology Xiluodu Hydropower Station slag yard traffic cave treatment cave Xiluodu Hydropower Station power production preparation work practice Xiluodu Hydropower Station monitoring system and GIS communication control model Xiluodu Hydropower Station air conditioning system energy saving analysis Xiluodu Hydropower Station cylindrical valve control method Xiluodu Hydropower Station volute pad Selection of layer geometric parameters Structural characteristics of Xiluodu Hydropower Station speed regulator Analysis of Xiluodu Hydropower Station speed control system power loss protection design Xiluodu Hydropower Station water inlet fast gate design Xiluodu Hydropower Station tunnel construction measurement Discussion of Xiluodu Hydropower Station high-voltage motor stator iron loss test method and analysis of sliding mode in Jilin The application of sliding formwork in the wave-proof wall project of Lintai I Hydropower Station. The application of sliding formwork technology in the concrete lining of the bottom arch of the diversion tunnel of the hydropower station. The application of sliding formwork technology in the construction of the ship lift piers of the Baishi Hydropower Station. The application of slipforming technology in the anti-impact and wear-resistant concrete of the spillway of Nuozhadu Hydropower Station. The application of sliding formwork technology in water conservancy and hydropower projects. Analysis of the application of sliding form construction technology in the Zangmu Hydropower Station project Technical and economic analysis of water and electricity cogeneration of Binhai Power Plant Experimental research and analysis of vibration zone of Unit 1 of Tankeng Hydropower Station Design of earth-rock overflow cofferdam of Tankeng Hydropower Station Plane control network of Tankeng Hydropower Station Monitoring of spillway concrete of Tankeng Hydropower Station Construction quality control technology Tankeng Hydropower Station resettlement plan implementation experience and understanding of Tankeng Hydropower Station face rockfill dam settlement analysis during construction period Manwan Hydropower Station second phase project water diversion system design overview Existing problems and solutions to the management of hydropower stations in the directly managed reach of the Zhanghe River Upstream Bureau and solutions to Zhanghe Hydropower Development and Utilization Analysis of the influence and countermeasures on the water order in the upper reaches of the Zhang River. Calculation of the short-circuit current of the Panjiakou Hydropower Station. Selection of the main parameters of the turbine of the Lancang River Wunonglong Hydropower Station. Analysis of the impact of hydropower development on the runoff of the main stream of the Lancang River. Causes and mechanisms of the large-scale toppling deformation slope of a certain hydropower project in the Lancang River. Underground plant of a certain hydropower station in the Lancang River. Stability analysis of surrounding rocks in the Lancang River Basin Hydropower Station Electromechanical equipment manufacturing and supervision quality control Failure analysis and treatment of the governor of the No. 2 turbine generator unit of the Pugou Hydropower Station Analysis of safety monitoring results and characteristics during the construction period of the underground powerhouse of the hydropower station. Anti-seepage and drainage design of the underground powerhouse cavern group of the Fugou Hydropower Station. Quality control of the construction of the anti-seepage wall of the dam of the Fugou Hydropower Station. Quality control of the construction of the large underground powerhouse of the Fugou Hydropower Station. Blocking construction of the diversion tunnel of the Fugou Hydropower Station. Risk assessment of debris flow in Xiangshuigou in the engineering area. Engineering construction contract management of Pugou Hydropower Station. Construction assistance management of Hanyuan New County in the reservoir area of Pugou Hydropower Station. Exploration and practice of construction management of Pugou Hydropower Station. Design optimization management during the construction process of Pugou Hydropower Station. Installation of working arc door in the vent of Pugou Hydropower Station. and initial operation of Pugou Hydropower Station material yard mining plan study of Pugou Hydropower Station hub layout Pugou Hydropower Station turbine-generator unit speed regulator start-up program optimization analysis Grinding concrete mix proportion selection Finite element analysis of the gravel soil core wall dam of the Pubugou Hydropower Station Construction quality control of the gravel soil core rockfill dam of the Pugou Hydropower Station Gravel soil core wall rockfill dam design of the Pugou Hydropower Station Gravel soil core wall material rolling test study on the characteristics and implementation of resettlement of the Pugou Hydropower Station Management of the cylindrical valve installation technology of Pupugou Hydropower Station Discussion on the relay protection engineering of Pupugou Hydropower Station and related technologies Discussion on optimization and adjustment of installed capacity of Pugou Hydropower Station Research on frequency measurement modification of governor gear plate of Pugou Hydropower Station Application of cast-in-place pile and high-spray grouting combined structure in Taoyuan Hydropower Station Grayscale Application of joint analysis in hydropower planning environmental assessment Study on the construction of cofferdam anti-seepage wall under complex geological conditions of Bingling Hydropower Station Analysis on efficiency expansion and reconstruction of Yanjiaping and Tuotian Hydropower Stations Reservoir sediment dispatching method of Niulanjiang Xiangbiling Hydropower Station Study on construction diversion design characteristics of Niulangou Hydropower Station Extra large concrete mixing Application of mixed building in Xiangjiaba Hydropower Station Shiziping Hydropower Station Dagou material yard slope landslide surface dangerous rock treatment Application of wolf pack algorithm in optimal dispatch of hydropower station reservoir Study on the material for cushioning the vertical seams of the face rockfill dam. Study on the capacity expansion and reconstruction technology of the Wangjiazhuang Hydropower Station. Study on the main parameters and structure of the turbine of the Mabubas Hydropower Station. Design and construction of the diversion tunnel of the Manas River Level 1 Hydropower Station. Study on the water elevator cascade development plan in the mountainous section of the Manas River. Study on the application of glass fiber reinforced plastic sand-filled pipes in small Research and application of hydropower station engineering Application of fiberglass sand-filled pipes in small hydropower stations Discussion on unit selection and optimization design of Zhenzhutan Hydropower Station Construction diversion design of Bandu Hydropower Station Comprehensive treatment of the large fault zone at the dam foundation of Banzai Hydropower Station Comparison of Wacun Hydropower Station engineering construction plans Selection of the normal water storage level plan of Wacun Hydropower Station Comparison and selection of the tailwater layout scheme of Ganzai PH1 Hydropower Station Optimization of Ganzai Hydropower Station BOT project management and operation model Analysis of Ganzai Hydropower Station PH1 water diversion and power generation system design scheme Optimization and adjustment of Ganzai Hydropower Station full-section RCC gravity dam construction Ganzai Hydropower Station outlet tower design Ganzai Hydropower Station Dam foundation excavation and construction Ganzai Hydropower Station dam foundation consolidation grouting construction Ganzai Hydropower Station dam curtain grouting construction technology Exploration of Ganzai Hydropower Station dam curtain reinforcement grouting technology Discussion of Ganzai Hydropower Station dam roller compacted concrete construction quality control Ganzai Hydropower Station final work power generation optimization Ganzai Hydropower Station permanent mechanical and electrical equipment Summary of experience in resource procurement and supply management Consolidation grouting construction of the riverbed dam section of Ganzai Hydropower Station Human resources training and welding quality control management practice for metal structure welding of Ganzai Hydropower Station Chi Hydropower Station as an example Evolution of water energy utilization and small hydropower construction prospects in the Hexi Corridor of Gansu Province Supervision practice of Gansu Provincial Water Conservancy and Hydropower Survey and Design Institute Ecological priority in the comprehensive management engineering design of Fengman Hydropower Station Several issues that should be paid attention to in the selection. Research on the layout principles of ecological and environmentally friendly rural hydropower hubs. Use an innovative spirit to take the road of "going global" for hydropower equipment. Discussion on the technical transformation and expansion of Tiandi Hydropower Station using ballast branch tunnels. Turbine selection and structural design of Tianba Hydropower Station. Turbine runner selection for Krabi River Class I Hydropower Station. Type analysis Technical analysis of power UPS and its application in hydropower stations Application of power system stabilizer in MNGETA hydropower station Stabilization action caused by grid failure Impact on the safe operation of Xiangjiaba Hydropower Station Maintenance of runner of Unit 1 of Liujinba Hydropower Station Risk removal of small hydropower and hydraulic structures Study on reinforcement sequencing method Design of centralized control system of Baiyunshan cascade hydropower station Design of hydraulic metal structure of Bainitang Hydropower Station Electrical control system of ship lift of Baishi Hydropower Station Baishi Hydropower Station overflow dam section dam top prefabricated beam erection Baishuijiang tertiary hydropower station double-chamber overflow surge tank layout characteristics in the mountain body Baishuijiang Optimization of surge tank design for tertiary hydropower station cascade development of hydropower stations in Baishaxi small watershed and its results Comprehensive management of the lower red rock accumulation project on the right bank of Baihetan Hydropower Station Study on engineering geological conditions of high slope at the dam site of Baihetan Hydropower Station Analysis method of energy consumption during the construction period of Baihetan Hydropower Station Column joints of Baihetan Hydropower Station Analysis and recommendations of Wuyan consolidation grouting test results Process design and equipment selection of the concrete pre-cooling system of Baihetan Hydropower Station Research on slope stability control factors and failure modes of Baihetan Hydropower Station Calculation and analysis of energy consumption indicators during the operation period of Bailong River Evaluation of the impact on the ecological environment Analysis and treatment of water inflow failure of the speed governor return tank of Baise City Lada Hydropower Station Preliminary analysis of karst development in the dam site area of Gaixiaba Hydropower Station Excavation and construction technology of dam abutment of Gaixiaba Hydropower Station Design and construction of upstream and downstream cofferdams of Gaixiaba Hydropower Station Dam water release and energy-dissipation building layout of Gaixiaba Hydropower Station Evaluation of the impact of tunnel line landslide Optimization design of artificial pedestal for arch dam of Gaixiaba Hydropower Station Construction period temperature stress and damage simulation analysis of Gaixiaba Hydropower Station Design of crescent-ribbed steel branch pipes of Gaixiaba Hydropower Station Design of concrete elliptical hyperbolic arch dam of Gaixiaba Hydropower Station Design of electrical main wiring of Gaixiaba Hydropower Station Station electrical secondary design Gaixiaba Hydropower Station water delivery system layout Gaixiaba Hydropower Station metal structure design Zhengang Laka Hydropower Station left bank earth-rock dam filling project construction method Application of straight-grid cleaning machine in Sanmenxia Hydropower Station Hard work and hard work Standardization and compliance to create a provincial "type five" hydropower station Zhimulin Hydropower Station Headquarters Optimization of hub design scheme Discussion on anti-scour design and construction of high-head cofferdam of Shiyazi Hydropower Station Current status and development strategies of rural hydropower in Shijiazhuang City Design of computer monitoring system of Shimiao II Hydropower Station Quality control of electrical installation of Shibanshui Hydropower Station Limestone powder replaces fly ash in Ganzai Hydropower Station in Cambodia Application of roller compacted concrete in station dam Shimenping Hydropower Station factory building floor structure design Shimenping Hydropower Station first hub full gate scheme design Shilong Hydropower Station powerhouse rear hillside stability analysis Shilong Hydropower Station dam deep anti-skid stability analysis Shilong Hydropower Station water diversion and power generation system layout design Shilong Hydropower Station water culvert bridge Design and construction Comparative analysis of project layout plans of Lizigou Hydropower Station Design of circulating cooling water system of Beituo Hydropower Station RCC dam construction quality and progress real-time control system in Guandi hydropower project Application of Fujian Shanghang Jinshan Hydropower Station leakage water treatment in workshops and corridors Xiuguan Hydropower Station governor system Discussing the method of renovating the TBM stuck machine of Coca Codo Hydropower Station and exploring scientific planning of rural hydropower to promote faster rural economic and social development. Hub layout design of Peru Santa Maria Hydropower Station. Processing technology of generator spindle of Peru Hydropower Station. Jishixia Hydropower Station 3×340MW turbine seat ring assembly and installation. Technology A brief analysis of the inverted vertical line construction technology of Jishixia Hydropower Station High-flow self-compacting concrete construction of the powerhouse project of Jishixia Hydropower Station Design and analysis of pressure pipes of Jishixia Hydropower Station Welding quality control of pressure steel pipes of Jishixia Hydropower Station Analysis of the characteristics of weak interlayers in the rock mass in the dam site area of Jishixia Hydropower Station Jishixia Hydropower Control of spiral deformation by integral rolling of large-diameter pressure steel pipes in Jishixia Hydropower Station Orifice sealing grouting method Construction of Jishixia Hydropower Station diversion tunnel intersection Flat-top twisted surface arch lining formwork and support design Jishixia Hydropower Station diversion tunnel intersection excavation support construction technology Jishixia Hydropower Station diversion tunnel intersection construction Engineering Technology Numerical simulation analysis of the stability of the horizontal layered rock mass in the intersection section of the diversion tunnel of the Jishixia Hydropower Station Analysis of the plug stability of the diversion tunnel of the Jishixia Hydropower Station Overview of the hub layout design of the Jishixia Hydropower Station The practice of environmental supervision of the Jishixia Hydropower Station project and discussion of investment control during the construction of the Jishixia Hydropower Station Design and construction of formwork support structure for cantilever beam slabs of Jishixia Hydropower Station Construction diversion design of Jishixia Hydropower Station Overview of Jishixia Hydropower Station Hydrological Forecast Scheme and Station Network Planning and Design Jishixia Hydropower Station Hydrogen Generator Unit Parameter Selection Jishixia Hydropower Station Water Release Building Design Jishixia Hydropower Station Flood Release Tunnel Design and construction of the large cavern at the intersection with the diversion tunnel. Optimal design of dam body zoning and dam material adjustment for Jishixia Hydropower Station concrete face rockfill dam. Experimental study on dam materials for Jishixia Hydropower Station concrete face rockfill dam. Construction review of Jishixia Hydropower Station concrete face rockfill dam. Monitoring design of Jishixia Hydropower Station concrete face rockfill dam Design of Jishixia Hydropower Station Concrete performance control after adjustment of mixed aggregate ratio Application of anchor cable dynamometer in Jishixia Hydropower Station spillway weir gate section project Quantitative analysis of reliability of electrical main connection of Jishixia Hydropower Station Jishixia Hydropower Station electrical main connection Line plan selection for Jishixia Hydropower Station. Analysis of the problem of damage to the trash rack during the early stage of impoundment. Jishixia Hydropower Station's super-large arc gate installation technology and quality control. Analysis of the deformation rules of the water inlet of the Jishixia Hydropower Station. Installation of the dam top tension line for the water inlet project of the Jishixia Hydropower Station. Overview of the construction of the trash rack at the water inlet of the Jishixia Hydropower Station. Control measures for uneven settlement of the face rockfill dam of Jishixia Hydropower Station. Control measures for the deformation of the face rockfill dam of Jishixia Hydropower Station. Counter-regulation calculation method of Ningkeng Hydropower Station. Discussion on the application of spatial information technology in the whole life cycle of hydropower projects. A review of the traveling steel formwork trolley in the diversion tunnel of Taikeze Hydropower Station. Application in soil construction Anti-seepage and plugging treatment technology of Zhaixiangkou Hydropower Station Application of shaft cyclone internal energy dissipation technology in Shuanggou Hydropower Station Establishment of the 4th Electric Power Industry Hydropower Construction Standardization Technical Committee Application of plasma cutting machine in electromechanical installation of a hydropower station Quality management practice in the construction of Nuozhadu Hydropower Project Implementation of investment control measures and effects of Nuozhadu Hydropower Project A brief analysis of the temperature control of impact-resistant and wear-resistant concrete of Nuozhadu Hydropower Project A brief analysis of the production quality control of sand and gravel aggregates of Nuozhadu Hydropower Project Design and rapid construction of soil cofferdam New stator winding insulation and corona protection system for ALSTOM unit of hydropower station Nuozhadu Hydropower Station HEC unit volute installation experience summary Nuozhadu Hydropower Station main underground engineering characteristics and supervision practice Nuozhadu Hydropower Station plant system 6^# Construction branch tunnel collapse treatment Nuozhadu Hydropower Station plant power consumption Prepare a self-invested design plan to improve the working gate chamber excavation and construction technology of the right bank spillway tunnel of the Nuozhadu Hydropower Station. Installation of the curved working gate of the right bank spillway tunnel of the Nuozhadu Hydropower Station. Key technologies for the concrete construction of the right bank spillway tunnel of the Nuozhadu Hydropower Station. Research on the concrete formwork construction scheme of the right bank spillway tunnel of the Nuozhadu Hydropower Station. Research on anti-cracking technology of concrete in the right bank spillway tunnel of Nuozhadu Hydropower Station Research and application on soil moisture content adjustment method of Nuozhadu Hydropower Station Mirror concrete construction of underground auxiliary powerhouse of Nuozhadu Hydropower Station Concrete construction plan for unit section of underground powerhouse of Nuozhadu Hydropower Station Construction of the cave collapse section. Study on the filling technology and quality control of the Nuozhadu Hydropower Station dam core wall with gravel soil. Study on the filling construction method and quality control of the Nuozhadu Hydropower Station dam foundation curtain grouting construction. Process design of filter material processing system Steady-state detection study on leakage of Nuozhadu Hydropower Station dam Gravel and earth material blending construction technology of Nuozhadu Hydropower Station Dam clay core wall in rainy season Construction technology of Nuozhadu Hydropower Station safety monitoring automation system Design of temporary plugging of diversion tunnel of Nuozhadu Hydropower Station Rapid continuous concrete construction technology Nuozhadu Hydropower Station diversion tunnel plugging and joint sealing grouting technology Nuozhadu Hydropower Station diversion tunnel gate sealing Underwater concrete reinforcement technology Nuozhadu Hydropower Station tailwater system Wuchakou rapid excavation construction technology Nuozhadu Hydropower Station project supervision engineer's process management of changes Review of key points of construction technology of Nuozhadu Hydropower Station project Construction management experience summary of Nuozhadu Hydropower Station project Cantilever beam construction technology of Nuozhadu Hydropower Station project Experimental research and application of anti-abrasion concrete mix ratio of Nuozhadu Hydropower Station project Construction progress management and control of Nuozhadu Hydropower Station Construction of the roof arch concrete lining of the variable roof height section of the left bank spillway tunnel at Nuozhadu Hydropower Station Anti-abrasion concrete construction at the left bank spillway tunnel at Nuozhadu Hydropower Station Treatment of concrete cracks in the left bank spillway tunnel at Nuozhadu Hydropower Station Main technical problems and countermeasures in the construction of Nuozhadu Hydropower Station Technical indicators and experimental detection methods of dam materials for core rockfill dam of Shunuozhadu Hydropower Station Experimental study on rolling compaction construction parameters of core rockfill dam filling material of Nuozhadu Hydropower Station Mix ratio design study on compaction characteristics and filling quality detection method of gravel-mixed soil in Nuozhadu Hydropower Station Study on primary rolling quality control method of gravel-mixed soil material in Nuozhadu Hydropower Station Research and application of quality control standards and control methods of gravel-mixed soil compaction in Nuozhadu Hydropower Station on gravel-mixed clay core rockfill dam in Nuozhadu Hydropower Station Key quality control technologies Research on digital dam technology application of Nuozhadu Hydropower Station Installation and operation of distribution machines in the construction of Nuozhadu Hydropower Station Research on mechanical equipment management in the construction of Nuozhadu Hydropower Station Main features of hydraulic machinery design of Nuozhadu Hydropower Station Installation of water guide bearings of Nuozhadu Hydropower Station Water in Nuozhadu Hydropower Station Study on the initial water storage scheme of the reservoir. Experimental study on the installation of water pipe settlement meters at Nuozhadu Hydropower Station. Nuozhadu Hydropower Station spillway tunnel bottom arch concrete slip form construction technology. Nuozhadu Hydropower Station spillway tunnel gradient section top arch concrete construction technical plan. Nuozhadu Hydropower Station concrete admixture optimization test. Nuozhadu Hydropower Station spillover. Construction experience of surface flatness of anti-scour, abrasion and cavitation-resistant concrete on the road floor, Nuozhadu Hydropower Station Spillway Arc Gate Installation Quality Control, Nuozhadu Hydropower Station Spillway Anti-abrasion and Wear-Resistant Concrete Mixing Technology and Quality Control, Nuozhadu Hydropower Station Spillway Anti-Abrasion and Wear-Resistant Concrete Construction Technology Control Key Points, Nuozhadu Hydropower Station Detailed design of the station spillway Nuozhadu Hydropower Station spillway surface hole super large arc gate installation in reverse order Nuozhadu Hydropower Station spillway gate chamber section buttress corbel construction technology Nuozhadu Hydropower Station environmental protection and soil and water conservation engineering design Nuozhadu Hydropower Station sand and gravel aggregate processing system wastewater treatment engineering process analysis Nuozhadu Hydropower Station Construction planning and practice of green hydropower projects of Zadu Hydropower Station. Total quality management method of Northwest Supervision Center of Nuozhadu Hydropower Station. Rapid penetration construction method of slag well in surge chamber of Nuozhadu Hydropower Station. Key construction technology of ultra-high core wall rockfill dam of Nuozhadu Hydropower Station. Research on layered water intake through laminated beam door at the water inlet of Nuozhadu Hydropower Station. Application of Anchor Cable Pile Sheet Wall Construction Technology of Zadu Hydropower Station Study on the power operation mode of the plant during the commissioning of the first unit of Nuozhadu Hydropower Station Research on construction technology of high-core rockfill dam of Nuozhadu Hydropower Station Innovation and practice of monitoring design of high-core rockfill dam of Nuozhadu Hydropower Station Suofengying Hydropower Station left bank anti-seepage curtain grouting construction technology Suofengying Hydropower Station Adjustment Guarantee Calculation Comparative Analysis of Zilanba Hydropower Station GIS Building Foundation Reinforcement Grouting Construction Hongqi Hydropower Station Efficiency Expansion and Renovation Hongqiao Hydropower Station Expansion and Renovation of Barrage Gate Surface Flow Energy Dissipation Study of Hongshui River Qiaogong Hydropower Station Ship Lock Design Analysis and Response to Resettlement Problems of Early Construction Hydropower Stations in the Hongshui River Basin Impact of the change in the energy dissipation mode of Cehongshi Hydropower Station on the operation of the power station. Experimental study on the diversion model during the dry season in the first year of the Honghua Hydropower Station. Productive test and results analysis of the dam consolidation grouting of the Nazixia Hydropower Station. Comparison and selection of hub diversion schemes for the Nazixia Hydropower Station. Concrete panel gravel pile for the Nazixia Hydropower Station. Stone dam filling quality control Copper water-stopping construction of face rockfill dam of Nazixia Hydropower Station Settlement monitoring and analysis during construction period of face gravel dam of Nazixia Hydropower Station A brief analysis of hydropower station technical problems and transformation and measures Structural complexity Application of small-volume concrete rapid pouring technology in Shatuo Hydropower Station Chuole Hydropower Station 2 Adjustment of oil receiver swing of unit No. 1. Application of rope coring drilling technology in ultra-deep hole drilling for water conservancy and hydropower. Application of comprehensive geophysical prospecting in hydropower station exploration. Application of integrated electrical methods in hydropower station cofferdam leakage detection. Application of integrated automation system in Anhui Bailianya Hydropower Station. Green grid ecological protection technology in hydropower project waste treatment. Applying the practice of green small hydropower creation to explore the concepts, contents and methods of green hydropower project construction planning, Myanmar DAPEIN (Ⅰ) Hydropower station hub engineering design, Myanmar DAPEIN (I) Hydropower station surge tank design, Myanmar DAPEIN (I) Hydropower station pressure pipeline inclined shaft excavation and support, Myanmar Kyeeon Kyeewa hydropower station volute peripheral concrete structure design Myanmar YEYWA hydropower station hydraulic generator unit dynamic balance analysis Myanmar YEYWA upper reaches hydropower project resettlement model brief description Myanmar Jirongjiwa (KYEEONKYEEWA) hydropower station integrated power system scheme design Myanmar Minda hydropower station factory building design Myanmar YEYWA hydropower station drainage bottom hole metal structure design Myanmar YEYWA hydropower station overflow surface large-span sliding form construction technology Myanmar YEWA Black start process of hydropower stations Application of cable crane arch bridge in the construction of Longjiang water conservancy and hydropower project Application of network progress plan management in preliminary work of hydropower Luopo Dam Hydropower Station diversion tunnel sealing construction technology Luotian Hydropower Station turbine generator unit efficiency expansion technology transformation Characteristics of hydropower station tourism resources developed in the United States Overturning the formwork in the concrete construction of Xiluodu Hydropower Station water cushion pond Application of Laojunmiao Hydropower Station construction risk identification and assessment analysis Nam, Laos Ngum 5 Hydropower station deep surge shaft shaft excavation design and construction practice Laos Xeset 2 Hydropower Station complex geological tunnel construction Laos Line Optimization Design Analysis of RCC Dam Deformation Monitoring Data of Laos Nam Ou 5 Hydropower Station Organization and Coordination of the Management Department of Lao Nam Ou 5 Hydropower Station Construction of Unbonded Prestressed Anchor Cables of Lao Nam Khan 2 Hydropower Station Research on Long-distance Water Diversion and Development Plan of Lao Nam Ye 2 Hydropower Project Water Diversion and Power Generation Building Design of Lao Nam Ou River 2 Hydropower Station on the edge of the hub area of Lao Nam Ou River 5 Hydropower Station Slope design Study on the hub layout and main technical issues of the Lao Nam Ou River 6 hydropower station Diversion tunnel construction technology of the Lao Nam Ou River 6 hydropower station Hydraulic mechanical design of the Lao Nam Ou River 6 hydropower station Overview of the development of cascade hydropower stations in the Lao Nam Ou River basin Study on the key issues of the large-scale light bulb tubular unit of the Lao Salakang Hydropower Station Study on the hydraulic transition of the Laomukong Hydropower Station unit and the downstream river channel Process calculation Finite element analysis of the clay core earth-rock dam of Laosongjiang Hydropower Station Design and construction of the upstream cofferdam of Laojiangdi Hydropower Station Hydraulic stability analysis of turbines of Laojiangdi Hydropower Station Design of computer monitoring system of Laojiangdi Hydropower Station The impact of the Laodukou hydropower station project on the biological resources of the Erdeng Rock Forest Deer Deer and Macaque Nature Reserve Analysis of the damage to the right bank access road and the slope behind the factory building on the right bank of Laohuzui Hydropower Station Analysis and treatment of high-pressure grouting and anti-sliding pile construction at the entrance slope of the diversion tunnel of Laohuzui Hydropower Station. Thermoeconomic analysis of hydropower cogeneration units considering environmental costs. Optimized dispatching system of hydropower stations considering stability and cavitation wear performance. Research on hydropower station power generation dispatching considering risk management. Application of polypropylene fiber in anti-impact and wear-resistant concrete for the spillway of Nuozhadu Hydropower Station. Polyurea in Jinping Application of anti-seepage treatment for cracks in hydropower station arch dams Application of computer monitoring system design of Subei Dangshang Level 4 Hydropower Station Model selection of Kenswat Hydropower Station Application of pulse echo method in hydropower station volute void detection Discussion on capacity expansion and transformation of Tengjiao Hydropower Station Application of paste grouting in anti-seepage of cofferdam of Gancai Hydropower Station in Cambodia The application of automatic control technology in the underground powerhouse excavation construction of Yili Hydropower Station in a certain hydropower station. The application and promotion of automatic grid connection technology in Shijiazhuang rural hydropower station. The application of automatic waste rack in Jingzhuang Hydropower Station. The application of automatic transfer switch electrical appliances (ATSE) in the design of the power system of You'an Laguo Hydropower Station. The application of self-compacting concrete in a deep inclined shaft of a certain hydropower station. Application of hollow grouting anchors in the construction of Bandu Hydropower Station Application of adaptive hybrid cuckoo algorithm in hydropower station dispatching Application of self-drilling anchors in the construction of the left bank shaft of Xiluodu Hydropower Station Construction and quality control of concrete anti-seepage wall of Sergu Hydropower Station Study on power generation sequencing method of hydropower stations under energy-saving power generation dispatching mode Design garden of diversion tunnel of Qingxi Hydropower Station in Furong River Basin Selection of generator circuit breaker for hydropower station Suzhi Hydropower Station tailrace channel floor trackless sliding form construction Suzhi Hydropower Station stilling tank floor drainage pipe leakage reason analysis and treatment design Sujiahekou Hydropower Station dam panel crack control analysis Sujiahekou Hydropower Station concrete face rockfill dam body filling quality management review Sujiahekou Hydropower Station spillway C45 anti-scouring and wear-resistant concrete Earth construction Sujiahekou Hydropower Station toe plate foundation grouting test Sujiahekou Hydropower Station face rockfill dam monitoring results analysis of Miaowei Hydropower Station dam foundation curtain grouting special situation treatment process anti-seepage wall concrete mix design in Miaowei Hydropower Station project curtain grouting productivity test study of Miaowei Hydropower Station core wall anti-seepage soil material compaction quality detection method and control standards Calculation and analysis of weir breach flood during the construction period of Miaowei Hydropower Station Experimental study on the static characteristics of filter materials for the gravelly soil core rockfill dam of Miaowei Hydropower Station Research on the main technical issues of Yingbulu Hydropower Station and isolated grid operation Selection and cross-section design of Yingbulu Hydropower Station earth-rock dam Engineering Geological Issues Safety Monitoring and Design of Yingbulu Hydropower Station Tailwater Concrete Laminated Beam Door Underwater Demolition Construction Characteristics of Grounding Design of Yingbulu Hydropower Station Overall Layout Design of Yingbulu Hydropower Station Hub Construction Diversion and Foundation Pit Drainage of Yingbulu Hydropower Station Water Release Building Design of Yingbulu Hydropower Station Hydrological Characteristics and Hydrological Design Characteristics of Yingbulu Hydropower Station Selection and study of turbine generator units in power stations Operation mode of Yingbulu Hydropower Station Design key points of computer monitoring system of Yingbulu Hydropower Station Ventilation, air conditioning and fire protection design of Yingbulu Hydropower Station Selection of installed capacity of Caoliping Hydropower Station technical renovation project Application study of wide tail pier combined energy dissipation engineering of Lianhuatai Hydropower Station Lianyangqiao Hydropower Station generator microcomputer protection configuration and setting calculation Lianlu I and II Water energy design characteristics of Lianlu Level 1 Hydropower Station Technical water supply system design of Lianlu Level 1 Hydropower Station hub diversion design Lianlu Level 2 (Xiacheng) Hydropower Station construction diversion method selection of Lianlu Level 2 (Xiacheng) Hydropower Station floodgate working arc gate design Lianlu Hydropower Station dam foundation leakage water treatment measures and effect analysis Lianlu Hydropower Station dam transverse joint leakage riding seam drilling anti-seepage treatment technology Study on the form of the ship lock water delivery system of Sarakang Hydropower Station. Renovation technology of the thrust bearing of the generator set of the Gezhouba Hydropower Station. Research on the dismantling of the unit and Woqingli mouth solidification during the renovation of the Gezhouba Hydropower Station. Rapid air sealing construction technology of the upstream cofferdam of the Dongqing Hydropower Station. Design of the fire extinguishing system of the main transformer of the Dongqing Hydropower Station. Rapid sealing construction technology of the diversion tunnel on the left bank of the Dongqing Hydropower Station. Design of the Dongqing Hydropower Station. Innovative technologies and applications of the No. 2 diversion tunnel of Dongjing Hydropower Station with extruded folds and developed geological anti-seepage sealing body grouting construction R&D and design of the transportation platform of Taishir Hydropower Station in Mongolia New technology application of engineering auxiliary system of Taishir Hydropower Station in Mongolia Application of steam curing in the construction of prefabricated beams of Laxiwa Hydropower Station Research on the deformation and stability of the deformation body in the dam site area of a hydropower project under water storage conditions Research on the application of battery pack capacity calculation in Fiji South Derewatu Hydropower Station. Some thoughts on prioritizing the development of micro-hydropower in eastern Tibet. SWOT analysis of the development of large and medium-sized hydropower in eastern Tibet. Measures to deal with abnormal hole creation in the cofferdam anti-seepage wall of Zangmu Hydropower Station. Study on the performance of concrete mixed with limestone powder in the dam of Zangmu Hydropower Station. Construction technology of concrete in high cold and large temperature differences of Zangmu Hydropower Station. Zangmu Design of high-line feed platform of hydropower station Technological innovation and optimization of arch dam foundation survey of Tengzigou Hydropower Station Design of concrete arch dam of Tengzigou Hydropower Station Comprehensive management of high slopes in the front tank of Hujiaya Hydropower Station Monitoring results analysis Application of siphon water inlet in hydropower stations in cold areas Application of siphon water inlet in hydropower stations in cold areas Safety assessment of flow-induced vibration of waterproof steel cover plates of hydropower units of Shuhe Hydropower Station Research on double pollution barrier of Luotan Hydropower Station Effect analysis of prefabricated prestressed concrete bridges in Laos Nanye 2 Hydropower Station Application of rural hydropower efficiency enhancement and capacity expansion in Xiangyang City Construction management practice Geological environmental suitability assessment of small hydropower projects in Xixiang Basin Engineering analysis in environmental impact assessment of a hydropower project in southwest China Engineering analysis of rock mass quality evaluation of left bank dam foundation of a hydropower station in southwest China Analysis of deformation of the dam head slope on the left bank of a hydropower station in southwest China Prediction and stability evaluation of bank collapse of highway collapse deposits in the reservoir area of a hydropower station in the south Engineering geological study of the deep weak overburden foundation of a hydropower station in the southwest Engineering geological classification of the surrounding rock of the tunnel of the Xidahe II hydropower station Discussion of the difficult issues in foundation treatment and construction of the Xi'an hydropower station Discussion on restoration measures - taking the Dobu Hydropower Station as an example Composite geomembrane seepage monitoring and leakage problem treatment at the Dobu Hydropower Station in Tibet The closure design of the Duobu Hydropower Station project in Tibet Analysis of the runner modification of Tibet Walong Hydropower Station. Analysis of the on-site stacking process of the generator rotor yoke of the Tibet Zhikong Hydropower Station. Construction of the gravel earth core wall rockfill dam of the Tibet Zhikong Hydropower Station. Hazards and protection of debris flows in ditch-type waste sites of the Western Water Conservancy and Hydropower Project. Design and construction of the third phase of the Guanyinyan Hydropower Station. Design and construction of the triangular back frame multi-card formwork of the Guanyinyan Hydropower Station. Guanyinyan Hydropower Station Provisional Temporary blocking door structure and its reinforcement measures Productive test results analysis of consolidation grouting of the dam foundation on the right bank of Guanyinyan Hydropower Station In-situ shear test study on RCC technology of the right bank dam of Guanyinyan Hydropower Station Research on Guanyinyan Hydropower Station dam foundation protection layer excavation pre-split blasting test Guanyinyan Hydropower Station diversion open channel slope pre-split blasting construction Guanyinyan Hydropower Station left bank dam foundation excavation construction Guanyinyan Hydropower Station left bank dam section corrosion zone consolidation grouting productivity test Guanyinyan Hydropower Station core wall rockfill dam reverse filter material rolling test and analysis Guanyinyan Hydropower Station core wall rockfill dam filling construction technology Guanyinyan Hydropower Station Engineering geological survey and research on the complex layered dam foundation in the hub area Key technical issues in hydraulics of Guanyinyan Hydropower Station water release building Numerical simulation of three-point bending test of concrete beams at Guanyinyan Hydropower Station Excavation and construction technology of Qianchanggou landslide treatment project at Guanyinyan Hydropower Station Stability evaluation and treatment plan design of Qianchanggou landslide at Guanyinyan Hydropower Station Turbine selection for Guanyinxia Hydropower Station The seismic and seismic design of the main electrical equipment of Qiao Hydropower Station. The application of computer network technology in water conservancy and hydropower projects. The theory of strengthening the construction cost management of the hydropower project department. The feasibility of long-term compensation for the resettlement of hydropower projects in East China. The role of references in hydropower science and technology papers. The construction of new energy disciplines in applied undergraduate colleges - taking Zhejiang Water Conservancy and Hydropower College as the example. Example: On the fixation and adjustment of the stator coil end hoop of a hydropower station unit. On the karst water inflow and prediction in the foundation pit of water conservancy and hydropower projects. On the grade determination and project management of large-scale pressure steel pipes in hydropower stations. On the construction key points of automatic water regime monitoring and reporting systems in Shuhe and Xunyang hydropower stations. Design of heavy rain predictions and the design of Gaixiaba hydropower station. Flood analysis and design institute's exploration of general engineering contracting business in hydropower resettlement projects. Discussion on the construction cost management and control of hydropower engineering projects. Discussion on the operation and management of hydropower construction enterprise testing companies. Discussion on ecology, society and economy as the win-win goals for the development of small hydropower. Application of pressure regulating valve in the design of pressure regulating system of small and medium-sized hydropower stations. Discussion on the automatic upgrading and transformation of hydropower stations. Experimental study on consolidation grouting without cover on the right bank of Xiangbiling Hydropower Station. Bailey Bridge in Shatuo Hydropower Station. Application in the construction of deck beams of ship lift equipment Analysis and treatment of rib plate cracks in the runner chamber of Unit 2 of Gongchuan Hydropower Station Application of rubber-poor coarse aggregate in Ganzai Hydropower Station project Implementation of the scientific outlook on development Accelerating the development of hydropower in my country Implementation of the scientific outlook on development Efforts to promote the sustainable development of hydropower in Songyang County Impact of hydraulic pulsation load of tubular unit on the structure of the hydropower station in Xiangshui, Guizhou Difficulties, problems and suggestions for replacing fuel with small hydropower stations in Guizhou Province by controlled blasting of the No. 1 construction branch tunnel of the hydropower station expansion project through the original diversion tunnel. Quality management of Jijiaying Secondary Hydropower Station Project Application in water tunnels Treatment of several program problems in the installation and operation of electromechanical equipment of Sezhu Hydropower Station Zambia Lunzua Hydropower Station Secondary design of power system of Zambia LUNZUA Hydropower Station Design of water diversion system of Zambia LUNZUA Hydropower Station Powerhouse upstream wall thrust ring structural stress analysis Development of small hydropower in Zambia A brief analysis of rural hydropower safety management in Ganzhou City Application and research of geological forecasting system in the construction of the traffic tunnel project of Maer Dam Hydropower Station. Application of advanced grouting excavation technology in the construction of the diversion tunnel of the upper hydropower station. Application of new super-large steel pipe manufacturing technology in Liyuan Hydropower Station. Application of ultra-fine cement grouting construction technology in the diversion tunnel project of Jinping II hydropower station. Application of branch pipe layout and hydraulic pressure test of ultra-high head hydropower station in Vietnam An. Design of unlined diversion tunnel for Khe hydropower station, Song Tranh, Vietnam 2水电站大坝结构缝渗漏水下处理技术越南上昆嵩水电站引水隧洞超前地质预报越南太安水电站发电机中性点设备的选择计算越南安科水电站水力机械设计越南昆江2一级水电站大坝温度控制设计越南昆江2一级水电站碾压混凝土坝设计与施工越南昆江2水电站二级电站施工组织设计越南沾化水电站施工导流设计越南香山水电站计算机监控系统建设跑马坪水电站发电机断路器的选型跟管钻头钻进工艺在大华桥水电站勘探中的特殊应用蹇家湾水电站发电机出口开关柜控制回路的技改应用车坝梯级水电站增效改造设计车头水电站技改增容工程方案选择车滩水电站增效扩容水轮机转轮选择转轮除湿在水电站的设计应用软基与岩基上的水电站厂房结构应力和位移对比轴伸贯流转桨水轮机在西瓦安度水电站的应用边境地区山寨的小明珠——西藏自治区边境地区的农村小水电建设辽宁金哨水电站电流回路二次接地点位置选择达克曲克水电站溢洪道进口体型优化试验研究达拉河口水电站工程右岸高边坡锚喷支护过军渡水电站机组温升异常分析通过技术创新提高水电施工技术水平通过整体降落法实现班多水电站座环安装与调整造价工程师在水利水电工程建设监理工作中的地位和作用那吉水电站灯泡贯流式水轮发电机的设计那吉航运枢纽水电站厂房布置及特点那比水电站碾压混凝土大坝变态混凝土施工技术那比水电站碾压砼重力坝高温季节施工温控技术那比水电站调速器静特性试验及分析那邦水电站大坝右岸高边坡加固中的预应力锚索设计邯郸市生态水网工程与小水电和谐发展邯郸院国内外水电项目业务发展回顾与展望郎恒水电站右水源引水隧洞防渗补漏工程施工采用爆炸法消除水电站钢岔管焊接残余应力里底水电站一期围堰防渗处理研究与应用里底水电站倮打塘砂石加工系统工艺改造里底水电站坝址右岸倾倒变形岩体成因机制和变形程度里石门水电站的标准化管理重大水电建设项目区域经济影响评价原则与方法重庆市中小型水利水电工程招标评析重建丰满水电站坝基变质砾岩钻孔变形模量试验研究重视公众舆论对小水电发展的影响金哨水电站二次等电位接地网方案探讨金安桥水电站业主统供物资管理金安桥水电站厂房蜗壳二期混凝土施工技术金安桥水电站右泄底孔弧门及液压启闭机安装金安桥水电站大坝抗震分析和抗震措施设计金安桥水电站定子定位筋安装质量控制金安桥水电站工程建设监理的探索与实践金安桥水电站工程建设管理综述金安桥水电站工程截流施工技术及特点金安桥水电站引水压力钢管预留缝焊接措施与控制金安桥水电站引水发电系统设计金安桥水电站拌和楼混凝土生产质量控制金安桥水电站施工期环境保护管理工作金安桥水电站枢纽区工程地质条件评价金安桥水电站枢纽布置研究金安桥水电站枢纽建筑物边坡工程设计金安桥水电站水土保持防治分区及实施措施金安桥水电站水轮发电机转子的结构特点分析金安桥水电站玄武岩骨料碾压混凝土应用研究金安桥水电站缆机设备选型研究金安桥水电站表孔泄流及底流消能研究金属全封闭气体绝缘输电线路在溪洛渡水电站的应用金山水电站闸门自动化监控系统改造实践金川水电站右岸导流洞出水口边坡稳定性分析金川水电站地下厂房开挖方案优化分析金川水电站坝基砂层透镜体震动液化评价及工程措施金川水电站面板混凝土早期开裂试验研究金沙峡水电站枢纽工程土坝渗水处理金沙水电站鱼道水力特性数值模拟金沙江上游水电目标市场分析和经济性研究金沙江中游梯级水电站集控中心规划研究综述金沙江中游流域水电开发规划体系研究与实践金沙江中游阿海河段水电开发方式的研究与确定金沙江乌东德水电站导流洞开挖控制测量的布设及应用金沙江某水电站左岸坝肩开挖变形稳定性分析金沙江梯级水电站群联合发电运行三种常规调度方法研究金沙江溪洛渡水电站AGR1灌浆平洞岩体渗水处理金沙江白鹤滩水电站岩体变形特性动静对比研究金沙江白鹤滩水电站葫芦口大桥主桥设计金沙江观音岩水电站左岸廊道漏水处理施工技术金沙江金沙水电站坝基岩体渗透性分析金沙江鲁地拉水电站上游过水围堰设计与运行金沙江鲁地拉水电站移民安置水土流失特点及防治措施金达二级水电站枢纽布置方案比选金鸡滩水电站参数确定及机型选择针对水电开发经济评价中一些外部性问题的研究针梁台车在水电站引水隧洞工程施工中的应用钢渣混凝土在杂木寺水电站工程中的应用钢管桩工艺在苗家坝水电站公路改建工程中应用铁城水电站金属结构设计铁川桥水电站大坝裂缝处理施工技术铜街子水电站24号坝段水平位移规律“异常”分析铝塑板在深溪沟水电站厂房坝段尾水扩散段的应用锅浪跷水电站大型高边坡工程设计研究锚杆无损检测技术在积石峡水电站支护工程中的应用锥形阀及消能室在巴贡水电站放水孔的泄洪消能运用锦屏Ⅱ级水电站1%23发电机定子线棒介质损耗试验锦屏一级水电站550 kV GIS安装质量与进度控制锦屏一级水电站F5断层水泥-化学复合灌浆试验锦屏一级水电站出线竖井施工提升系统安全设计锦屏一级水电站压力钢管制安新技术试验锦屏一级水电站地下厂房围岩松弛变形机理分析与治理锦屏一级水电站地下厂房洞室群施工锦屏一级水电站基础工程灌浆检测技术及评价标准研究锦屏一级水电站大坝接缝灌浆施工工艺锦屏一级水电站左坝肩f5断层对穿冲洗置换模拟研究锦屏一级水电站左岸f_2 Comprehensive treatment design of faults Consolidation grouting test of the left bank resistance body of Jinping I Hydropower Station Stability analysis and engineering measures research on the abutment of the arch dam of Jinping I Hydropower Station Simulation analysis and scheme comparison of the construction progress of the arch dam of Jinping I Hydropower Station Analysis and evaluation of crack resistance performance of Jinping I Hydropower Station arch dam concrete alkali aggregate reaction suppression engineering measures Jinping I Hydropower Station ultra-high arch dam temperature control crack prevention technology and practice Jinping I Hydropower Station water inlet layout and slope optimization design Jinping II Hydropower Station No. 1 diversion tunnel chlorite schist section treatment technology and application Jinping II Hydropower Station 3 Consolidation grouting test with heavy cover and anti-seepage in No. 3 diversion tunnel of Jinping II Hydropower Station Consolidation grouting quality control of No. 3 and No. 4 diversion tunnels of Jinping II Hydropower Station Secondary reinforcement technology for surrounding rock deformation of No. 3 diversion tunnel of Jinping II Hydropower Station Analysis of tunnel engineering geological conditions Design and construction of rock wall crane beams for underground powerhouses of Jinping II Hydropower Station Excavation and blasting tests of rock wall beams for underground powerhouses of Jinping II Hydropower Station Concrete construction technology of rock wall beams for underground powerhouses of Jinping II Hydropower Station Water diversion treatment for leakage in on-site traffic tunnels of Jinping II Hydropower Station Overview of the construction of diversion tunnels of Jinping II Hydropower Station Jinping II Hydropower Station diversion tunnels High-pressure and large-flow underground water inflow sealing scheme and construction technology research Jinping II Hydropower Station Key technical issues in the diversion system of the hydropower station. Study on comprehensive prevention and control measures for strong rock bursts in the diversion tunnel project of the Jinping II Hydropower Station. Overall design of the diversion tunnel construction of the Jinping II Hydropower Station. Research on groundwater detection technology during the construction period of the diversion tunnel of the Jinping II Hydropower Station. Simulation and inspection of concrete lining construction in the turning section of the diversion tunnel of the Jinping II Hydropower Station. Construction technology of secondary excavation and support for the soft rock large deformation tunnel section of the diversion tunnel of the Jinping II Hydropower Station. Water diversion of the Jinping II Hydropower Station. Analysis of the deformation characteristics and reserved deformation amount of the soft rock section of the tunnel. Time effect of fracture propagation of deep-buried marble in Jinping II Hydropower Station. Selection of construction ventilation scheme for the extra-long tunnel group of Jinping II Hydropower Station. Research and application of key technologies for narrow embankment interception of Jinping II Hydropower Station. Main construction technology of the diversion tunnel at the west end of Jinping II Hydropower Station. Experimental study on water diversion and sand prevention model at the water inlet of Jinping II Hydropower Station. Analysis of the stability of No. 3 landslide at Jinping Hydropower Station. Jinjiang Reservoir Dam Behind Hydropower Station. Efficiency enhancement and capacity expansion renovation of hydroelectric generator units Jintan Hydropower Station arc keyway template production and construction technology Jingtieshan three-level hydropower station diversion line scheme comparison and selection of long diversion hydropower station project GPS construction measurement control network data processing long diversion system hydropower station pressure pipe diameter optimization long diversion tunnel project hydropower station guide vane closing rules discussion of Yangtze River Engineering Geophysical Survey Wuhan Co., Ltd. undertakes the geophysical survey monitoring task of Jinsha River Wudongde Hydropower Station Changhe Experimental study on the protection methods of the upstream cofferdam and weir face of the Changheba Hydropower Station. Construction technology of clear-faced concrete for rock wall beams in the underground powerhouse of the Changheba Hydropower Station. Design and construction of foundation pit drainage of the Changheba Hydropower Station. Rockfill blasting construction of the Changheba Hydropower Station. Parameter selection Changheba Hydropower Station complex formation cofferdam anti-seepage wall rapid construction technology Changheba Hydropower Station dam flood relief construction key technology and new technology Changheba Hydropower Station tailwater outlet cofferdam demolition blasting construction technology Changheba Hydropower Station Excavation construction technology for extremely steep and high slopes of power station projects Special construction methods of large-aperture cast-in-place piles for Fenglingou Bridge of Changheba Hydropower Station Experimental study on concrete frost resistance performance of Changheba Hydropower Station Gravel core wall material compaction performance of Changheba Hydropower Station Experimental study on performance selection of Changheba Hydropower Station high slope excavation construction quality control Changtan Reservoir Hydropower Plant off-site small hydropower unit unattended renovation Changdian Hydropower Station VPI stator bar stator assembly process research Changzhaoshui Problems and solutions in the installation of water guide mechanism of power station turbines Application of long-distance belt conveyor in sand and gravel system engineering of hydropower projects Optimization of cofferdam construction plan for check dam of Menkantan Hydropower Station Application of gantry-type steel formwork trolley in lining of diversion tunnel of Dahuashui Hydropower Station Key points for installation of hydraulic turbine generator set of Kuoktal Hydropower Station Analysis of seepage characteristics of deep overlay gate foundation of Yinping Hydropower Station Analysis of capacity expansion and reconstruction scheme design of Altay Secondary Hydropower Station Albania * * Encourage the development of small hydropower. Calculation of characteristic flood levels of Awati Hydropower Station. Calculation of the upper frame structure of the Alewa Hydropower Station powerhouse. Fabrication and installation process of pressure steel pipes of Asahan I Hydropower Station. Selection and design of energy dissipation valves of Asahan I Hydropower Station. Impact of rainfall infiltration on the instability of slate slopes of Miaowei Hydropower Station and reinforcement measures. Problems and countermeasures in rural hydropower construction in Shaanxi Province. Design and calculation of the powerhouse structure of Taocha Hydropower Station. Rock water across the river. Principle and debugging of power station excitation system Joint optimization dispatch study of cascade hydropower stations in the lower reaches of Yalong River Study on turbine parameter selection of Lianghekou hydropower station in Yalong River Study on activity of Songyu fault in the Lenggu hydropower station site area of Yalong River Design of fish breeding and release station of Jinping cascade hydropower station in Yalong River No. and 4 No. diversion tunnel entrance open channel construction technology needs Zadu Hydropower Station hub project main technical innovation and practice Qingyanggou Hydropower Station water diversion system and pressure regulating shaft engineering design Qingyanggou Hydropower Station unit selection design Qingyanggou Hydropower Station hub layout and building design characteristics Comparison and selection of diversion schemes for Qingyanggou Hydropower Station hub construction Discussion on the sedimentation characteristics of the tailrace channel of the Qingtongxia Hydropower Station. Application of static GPS technology in the measurement of the construction control network of the Nazixia Hydropower Station. Application of static blasting in the deblasting of boulders in the Laxiwa Hydropower Station. Development opportunities for small hydropower in Africa. Integrated control equipment for small hydropower efficiency and capacity expansion needs. Modular microcomputer protection Modular microcomputer excitation regulator for small hydropower Numerical simulation of the impact of panel cracks on the seepage field of the Jishixia Hydropower Station dam Optimal design of prestressed anchor cable anti-sliding piles in the site leveling project of Lianghekou Hydropower Station Application of risk management theory in the construction of hydropower station projects Vetiver hedgerows Application of reinforcement technology in Jinping I Hydropower Station Research on anti-corrosion problems of penstock steel pipes of Kejia Hydropower Station in Macedonia Optimization design of cofferdam scheme for the second phase construction of Mayandong Hydropower Station Overview of design of face rockfill dam of Bakun Hydropower Station in Malaysia Selection of cement grouting water-cement ratio in Muruo hydropower project in Malaysia Analysis and treatment of welding cracking of the inlet valve valve of hydropower station Design of prestressed arc door support of Hulu Hydropower Station in Malaysia Construction diversion design of Maliferu Hydropower Station Dam crest deformation monitoring design of Mamaya I Hydropower Station High-level promotion of pioneering and innovation Overcoming difficulties to complete the resettlement and relocation of Rutila Hydropower Station on time Task Application of high-pressure jet grouting technology in the construction of the exit cofferdam of the diversion tunnel of Nuozhadu Hydropower Station Application of high-pressure jet grouting in the anti-seepage of the cofferdam foundation of Gaixiaba Hydropower Station Application of high-pressure jet grouting anti-seepage wall in the Sanshengong Phase II Hydropower Station Project Plateau lake ecosystem service function and its impact on hydropower development Impact on the application of high-injection technology in the anti-seepage treatment of the diversion tunnel outlet cofferdam of Huanghuangping Hydropower Station. The application of high-injection anti-seepage board wall in the foundation treatment of hydropower stations. The earthquake emergency plan of Gaoba Daku Hydropower Station and the problems that need to be solved. Observation and testing of prototype floodgates of Gaoba Daku Hydropower Station during the construction of hydropower stations in alpine regions. Skin grafting technology discusses the application of high-strength tensile prestressed anchor cables in the reinforcement of high slopes on Xiaowan Hydropower Station dam abutment. Gaoqiaowan Hydropower Station powerhouse design. High-head hydropower station pressure steel pipe ballast design. Several technical issues. A review of the design of buried pressure steel pipes in high-head hydropower stations. Overview of the water inlet tower resistance of hydropower stations in high-intensity seismic areas. Seismic analysis Stability review study of No. 8 dam section of Gaosha Hydropower Station Design and application of earth-rock water cofferdam downstream of Ludila Hydropower Station Experimental study of covered heavy consolidation grouting at the dam foundation of Ludila Hydropower Station Study on water-stop design of slap-type floating gate of Ludila Hydropower Station Study on unstable seepage analysis of Kumu A landslide in Ludila Hydropower Station Study on the selection of concrete aggregate sources for the Ludila Hydropower Station. Study on several methods for cost control of the resettlement project of the Ludila Hydropower Station. Interception construction of the first hub project of the Lujichang Hydropower Station. Blasting construction technology of the Lujichang Hydropower Station. Optimization design of the water diversion project in the diversion area for capacity expansion and reconstruction of the Bird's Nest Hydropower Station. Yabii River Paomaping Hydropower Station shaft excavation plan selection and construction Yuanyangqiao Hydropower Station dam concrete warehousing plan analysis Qilinsi Hydropower Station slope shotcrete support construction quality control Qilinsi Hydropower Station post-earthquake engineering risk removal measures Huangfeng Hydropower Station's impact on the ecological environment and protective measures Optimization of the floodgate drainage system of the Huangfeng Hydropower Station project Design of the Huangtuwan Hydropower Station Main Transformer Differential Current Excessive Cause Analysis Study on the sulfate erosion damage of a hydropower station in the upper reaches of the Yellow River. Analysis of the dam safety management of the cascade hydropower station group in the upper reaches of the Yellow River. Remote diagnosis of the runner hoisting method of the Banduo Hydropower Station in the upper reaches of the Yellow River. Brief analysis of the possible maximum flood estimation for the large hydropower station project above Longyangxia in the upper reaches of the Yellow River. Preliminary study of the abrasive state of turbines of hydropower stations on the Yellow River. Research on maintenance and repair. Treatment of structural joints and cracks in the concrete construction of the left bank spillway tunnel of the Yellow River Gongboxia Hydropower Station. Study on dispatching methods, key technologies for precision leveling of the Yellow River Laxiwa Hydropower Station, preliminary selection of turbine parameters for the Yellow River Haibowan Hydropower Station, analysis of dam seepage safety for the Yellow River Source Hydropower Station project, closure construction technology of the Yellow River Banduo Hydropower Station, design of prestressed gate piers for the floodgates of the Yellow River Banduo Hydropower Station, and design of the Yellow River Jishixia Hydropower Station. Design and construction of the roof arch formwork and support system for the non-combined section of the medium-hole spillway tunnel. Optimization and reconstruction of the measurement control network for the construction of the Yellow River Jishixia Hydropower Station. Design of the measurement and reporting system and encryption network of the Yellow River Jishixia Hydropower Station. Introduction of the trackless sliding form construction method for the bottom plate of the tailrace channel of the powerhouse of the Yellow River Suzhi Hydropower Station. Yellow River Design of Composite Geomembrane Sand and Gravel Dam on the Right Bank of Huangfeng Hydropower Station Selection and Application of Series Resonance Device of Yellow River Longkou Hydropower Station Analysis and Treatment of Oil Drainage Causes of Oil Receiver of Yellow River Longyangxia Hydropower Station Review of Seismic Safety of Yellow River Longyangxia Hydropower Station and Summary of Research Results on Dam Ultimate Bearing Capacity Huangdeng Hydropower Station High Slope Topple Comprehensive management of loose rock mass Key technical issues in the construction of Huanghuazhai Hydropower Station Discussion on emergency construction methods of Highway 8 at Huanghuangping Hydropower Station Process design of artificial sand and gravel aggregate processing system at Huanghuangping Hydropower Station Analysis of stress and deformation characteristics of dam foundation gallery at Huanghuangping Hydropower Station Construction of anti-seepage wall with a thickness exceeding 100 meters deep Engineering technology Rapid construction technology of asphalt concrete for dam core wall of Huanghuangping Hydropower Station Dam water storage process monitoring results analysis of Huanghuangping Hydropower Station Natural sand and gravel processing Reverse filter material practice Huanghuangping Hydropower Station diversion tunnel collapse treatment Huanghuangping Hydropower Station engineering construction all-risk execution management practice Huanghuangping Optimization design of dam filling material source during the technical construction stage of the hydropower station. Overview of construction management of Huanghuangping Hydropower Station hub project. Research on hub layout design of Huanghuangping Hydropower Station. Experimental study on optimization of layout of discharge buildings of Huanghuangping Hydropower Station. Blasting test study on stone yard of Huanghuangping Hydropower Station. Volute casing and elastic cushion of Huanghuangping Hydropower Station. Structural design Surrounding rock stability and lining structure analysis of surge chamber of Huangjinping Hydropower Station Analysis of slope deformation mechanism of Huangjinping Hydropower Station Study on blasting construction plan near residential areas of Huanglongtan Hydropower Station Leakage treatment of the No. 3 water diversion hole of Huanglongtan Hydropower Station Study on the monitoring of surrounding rock deformation in the water diversion and power generation tunnel of the Rehattar Hydropower Station. Turbine selection and structural design of the Qirehattar Hydropower Station. Analysis of the stability of the slope behind the surge shaft of the Qirehattar Hydropower Station. Application of heavy consolidation grouting technology without cover in the surge tank of the Qirehattar Hydropower Station. Anti-seepage design of the surge chamber of the Qirehattar Hydropower Station. Study on the impact of peak shaving operation of Longkou Hydropower Station on downstream rivers. Analysis of water and soil conservation and environmental protection measures of Longjiazhuang Hydropower Station. Design of Longkaikai Hydropower Project construction and implementation stage. Cost management review. Longkaikai Hydropower Project technology innovation. Construction organization design of Longkaikai Hydropower Station factory building. Volute casing. Phase II Concrete Rapid Construction Technology Longkaikai Hydropower Station Right Bank Deformation Slope Stability Analysis and Reinforcement Longkaikai Hydropower Station Dam Foundation Deep Trough Treatment Design Longkaikai Hydropower Station Dam Foundation Deep Trough Construction Longkaikai Hydropower Station Foundation Ring and Seat Ring Installation Quality Control Longkaikai Hydropower Station Dam Engineering Construction Quality Management Practice Longkaikai Hydropower Station Hydropower station dam project progress management Longkaikai Hydropower Station dam foundation surface optimization study Longkaikai Hydropower Station dam seismic research and design Longkaikai Hydropower Station stator assembly construction technology Longkaikai Hydropower Station tailrace canal slope comprehensive management Longkaikai Hydropower Station engineering construction review Longkaikai Hydropower Station belt conveyor and steam Comprehensive comparison of vehicle transportation Diversion planning, design and implementation of construction of Longkai Hydropower Station Environmental protection work management and practice during the construction period of Longkai Hydropower Station Construction progress design and implementation of electromechanical engineering of Longkai Hydropower Station Construction practice of Longkai Hydropower Station Key technology research of Longkai Hydropower Station hub Engineering safety monitoring design, construction and management of Jiangdong resettlement site of Longkai Hydropower Station, research on dolomite concrete aggregate source selection and processing and transportation plan of Longkai Hydropower Station, selection and application of roller compacted concrete warehousing method of Longkai Hydropower Station, quality control of key links in roller compacted concrete construction of Longkai Hydropower Station Longkaikou Hydropower Station RCC temperature control technology Design, development and application of the anti-collision system of Longkai Hydropower Station Stability analysis of a landslide on the left side of a Longhe hydropower station building Operation Analysis Review of Longtan Hydropower Station Dam Foundation Consolidation Grouting Process Construction of Longtan Hydropower Station Bottom Hole Prestressed Anchor Cable Construction Longtan Hydropower Station Wireless Flood Discharge Alarm and Cable Telephone Broadcasting Comprehensive Application of Longtan Hydropower Station Production Water Plant Operation Management Longtan Hydropower Station Ventilation and Air Conditioning Automatic Control System Longtanzui Hydropower Station Roller Compacted Concrete Warehousing construction technology Longyangxia Hydropower Station G4 pegmatite cleavage zone composite grouting treatment Longyangxia Hydropower Station dam foundation fault F120+A2 seepage behavior analysis and prediction study Longyangxia Hydropower Station resettlement housing salinity prevention and control Longyangxia Hydropower Station water diversion steel pipe welding deformation correction and heat treatment process Application and transformation of the speed control system of Cheng Longyangxia Hydropower Station Construction of the complex geological section of the Xiandong Hydropower Station tunnel in Longsheng County Technical transformation of the 6.3kV generator power distribution device of Longmentan Level 1 Hydropower Station Comprehensive automation transformation of Longshou Level 2 Hydropower Station Production and installation of pressure steel pipes of Longshou Level 2 Hydropower Station Modification and design of the shape monitoring network. Discussion on the problem of high water level opening and closing of the No. 9 spillway working door of the Gongzui Hydropower Station. Selection of the type of pollution barrier for the water inlet of the generator unit of the Gongzui Hydropower Station. Exploration and practice of the capacity expansion and reconstruction of the unit of the Gongzui Hydropower Station. Insulation treatment of the turbine generator rotor of the Gongzui Hydropower Station. Analysis of the measured data of environmental quantities of the Gongzui Hydropower Station.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.